Akhtar, A., Khan, A., Akhtar, S., et al. (2020). Conflict Management Strategies and Organizational Performance in Banking Sector of Pakistan. Foundation University Journal of Business & Economics, 5(1), 1–12.
https://doi.org/10.33897/fujbe.v5i1.143
Akogbe, R. K. T. M., Feng, X., & Zhou, J. (2013). Importance and ranking evaluation of delay factors for development construction projects in Benin. KSCE Journal of Civil Engineering, 17(6), 1213–1222.
https://doi.org/10.1007/s12205-013-0446-2
Al-Adwani, M. M., Mollasalehi, S., & Fleming, A. J. (2018). A study of root causes of delays in the public-sector construction projects in Kuwait. In: Proceedings of the International Conference on Construction Futures ICCF; University of Wolverhampton, U
Alinaitwe, H., Apolot, R., & Tindiwensi, D. (2013). Investigation into the Causes of Delays and Cost Overruns in Uganda’s Public Sector Construction Projects. Journal of Construction in Developing Countries, 18(2), 33–47.
Al-Janabi, A. M., Abdel-Monem, M. S., & El-Dash, K. M. (2020). Factors causing rework and their impact on projects’ performance in Egypt. Journal of civil engineering and management, 26(7), 666–689.
https://doi.org/10.3846/jcem.2020.12916
Alsehaimi, A., Koskela, L., & Tzortzopoulos, P. (2013). Need for alternative research approaches in construction management: Case of delay studies. Journal of Management in Engineering, 29(4), 407–413.
https://doi.org/10.1061/(ASCE)ME.1943-5479.0000148
Annamalaisami, C. D., & Kuppuswamy, A. (2019). Reckoning construction cost overruns in building projects through methodological consequences. International Journal of Construction Management, 22(6), 1079–1089.
https://doi.org/10.1080/15623599.2019.1683689
Apolot, R. E. (2011). Investigation of the causes of delay and cost overrun in construction projects in Uganda’s public sector [PhD thesis]. Makerere University.
Arantes, A., da Silva, P. F., & Ferreira, L. M. D. F. (2015). Delays in construction projects—causes and impacts. 2015 International Conference on Industrial Engineering and Systems Management (IESM).
https://doi.org/10.1109/iesm.2015.7380293
Arena, F., Collotta, M., Luca, L., et al. (2021). Predictive Maintenance in the Automotive Sector: A Literature Review. Mathematical and Computational Applications, 27(1), 2.
https://doi.org/10.3390/mca27010002
Asah-Kissiedu, M. (2009). The development of appropriate strategies for the prevention of construction disputes in Ghana [Master’s thesis]. Kwame Nkrumah University of Science and Technology.
Azhar, S., & Choudhry, R. M. (2016). Capacity building in construction health and safety research, education, and practice in Pakistan. Built Environment Project and Asset Management, 6(1), 92–105.
https://doi.org/10.1108/bepam-09-2014-0044
Chamidah, N., Santoni, M. M., & Matondang, N. (2020). Oversampling Method on Classifying Hypertension Using Naive Bayes, Decision Tree, and Artificial Neural Network. Jurnal RESTI (Rekayasa Sistem Dan Teknologi Informasi), 4(4), 635–641.
https://doi.org/1
Cakmak, E., & Cakmak, P. I. (2014). An Analysis of Causes of Disputes in the Construction Industry Using Analytical Network Process. Procedia—Social and Behavioral Sciences, 109, 183–187.
https://doi.org/10.1016/j.sbspro.2013.12.441
Chaitongrat, T., Janthachai, K., Kusonkhum, W., et al. (2024). Comparing data mining methods for predicting cost construction projects: A case study of cost management datasets from Thailand. Journal of Infrastructure, Policy and Development, 8(5), 2801.
Chen, G. X., Shan, M., Chan, A. P. C., et al. (2017). Investigating the causes of delay in grain bin construction projects: the case of China. International Journal of Construction Management, 19(1), 1–14.
https://doi.org/10.1080/15623599.2017.1354514
Chidiebere, E. E., & Ebhohimen, I. J. (2018). Impact of Rework on Building Project and Organisation Performance: A View of Construction Professionals in Nigeria. International Journal of Sustainable Construction Engineering Technology, 9(1).
https://doi.o
Choudhry, R. M., Aslam, M. A., Hinze, J. W., & Arain, F. M. (2014). Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines. Journal of Construction Engineering and Management, 140(7).
https://doi.org/10.1061/(asce
Elhusseiny, H. O., Nosair, I., & Ezeldin, A. S. (2021). Systematic processing framework for analyzing the factors of construction projects’ delays in Egypt. Ain Shams Engineering Journal, 12(2), 1501–1511.
https://doi.org/10.1016/j.asej.2020.10.016
Faridi, A. S., & El‐Sayegh, S. M. (2006). Significant factors causing delay in the UAE construction industry. Construction Management and Economics, 24(11), 1167–1176.
https://doi.org/10.1080/01446190600827033
Farooq, M., Shafiq, M., & Tahir, A. H. (2019). Impact of Quality Education and Tangibles of Education system on Literacy Improvement- An Empirical study of Southern Punjab Region of Pakistan. Foundation University Journal of Business & Economics, 4(2), 21
Fatima, A., Sekhar, T. S., & Hussain, S. A. M. (2014). Analysis of construction dispute resolution process using artificial neural networks. International Journal of Innovative Research and Development, 3(7).
Fugar, F. D., & Agyakwah-Baah, A. B. (2010). Delays in Building Construction Projects in Ghana. Australasian Journal of Construction Economics and Building, 10(1/2), 103.
https://doi.org/10.5130/ajceb.v10i1/2.1592
Gündüz, M., Nielsen, Y., & Özdemir, M. (2013). Quantification of delay factors using the relative importance index method for construction projects in Turkey. Journal of management in engineering, 29(2), 133–139.
https://doi.org/10.1061/(ASCE)ME.1943-5479
Han, S., Love, P., & Peña-Mora, F. (2013). A system dynamics model for assessing the impacts of design errors in construction projects. Mathematical and Computer Modelling, 57(9–10), 2044–2053.
https://doi.org/10.1016/j.mcm.2011.06.039
Hossain, M. A., Raiymbekov, D., Nadeem, A., et al. (2019). Delay causes in Kazakhstan’s construction projects and remedial measures. International Journal of Construction Management, 22(5), 801–819.
https://doi.org/10.1080/15623599.2019.1647635
Iftikhar Kiani, O., Awais, M., Ahmed, W., et al. (2020). The role and analysis of Microfinance Banks in Pakistan. Foundation University Journal of Business & Economics, 5(1), 34–62.
https://doi.org/10.33897/fujbe.v5i1.145
Islam, M. S., & Suhariadi, B. T. (2018). Construction delays in privately funded large building projects in Bangladesh. Asian Journal of Civil Engineering, 19(4), 415–429.
https://doi.org/10.1007/s42107-018-0034-3
Johnson, R. M., & Babu, R. I. I. (2018). Time and cost overruns in the UAE construction industry: a critical analysis. International Journal of Construction Management, 20(5), 402–411.
https://doi.org/10.1080/15623599.2018.1484864
Kamal, A., Abas, M., Khan, D., et al. (2019). Risk factors influencing the building projects in Pakistan: from perspective of contractors, clients and consultants. International Journal of Construction Management, 22(6), 1141–1157.
https://doi.org/10.1080
Kanjana, P., & Kongsomboon, P. (2018). Problems of modifying construction contracts based on the changed circumstances principle. Thammasat University Law Journal, 2018(1), 528–538.
Kashif, A. R., Shafiq, Dr. M., Tahir, A. H., et al. (2020). Impact of On Job Training, Training Design and Training Delivery Style on Organizations Performance. Foundation University Journal of Business & Economics, 5(2), 40–51.
https://doi.org/10.33897/f
Khabisi, J., Aigbavboa, C., & Thwala, W. (2017). Causes of Cost Overruns in Public Sector Construction Projects in South Africa. In: Proceedings of the International Conference on Construction and Real Estate Management 2016.
https://doi.org/10.1061/97807
Khair, K., Mohamed, Z., Mohammad, R., et al. (2017). A Management Framework to Reduce Delays in Road Construction Projects in Sudan. Arabian Journal for Science and Engineering, 43(4), 1925–1940.
https://doi.org/10.1007/s13369-017-2806-6
Khatib, B. A., Poh, Y. S., & El-Shafie, A. (2020). Delay Factors Management and Ranking for Reconstruction and Rehabilitation Projects Based on the Relative Importance Index (RII). Sustainability, 12(15), 6171.
https://doi.org/10.3390/su12156171
Kikwasi, G. J. (2012). Causes and Effects of Delays and Disruptions in Construction Projects in Tanzania. Australasian Journal of Construction Economics and Building—Conference Series, 1(2).
Koushki, P. A., Al‐Rashid, K., & Kartam, N. (2005). Delays and cost increases in the construction of private residential projects in Kuwait. Construction Management and Economics, 23(3), 285–294.
https://doi.org/10.1080/0144619042000326710
Larsen, J. K., Shen, G. Q., Lindhard, S. M., & Brunoe, T. D. (2016). Factors affecting schedule delay, cost overrun, and quality level in public construction projects. Journal of management in engineering, 32(1).
https://doi.org/10.1061/(ASCE)ME.1943–5479
Mahamid, I. (2013). Common risks affecting time overrun in road construction projects in Palestine: Contractors’ perspective. Construction Economics and Building, 13(2), 45–53.
https://doi.org/10.5130/ajceb.v13i2.3194
Memon, A. H., Abdul Rahman, I., Abdullah, M. R., et al. (2011). Time Overrun in Construction Projects from the Perspective of Project Management Consultant (PMC). Journal of Surveying, Construction & Property, 2(1), 1–13.
https://doi.org/10.22452/jscp.vol
Muhwezi, L., Acai, J., & Otim, G. (2014). An assessment of the factors causing delays on building construction projects in Uganda. International journal of construction engineering and management, 3(1), 13–23.
https://doi.org/10.5923/j.ijcem.20140301.02.
Muneeswaran, G., Manoharan, P., Awoyera, P. O., et al. (2018). A statistical approach to assess the schedule delays and risks in Indian construction industry. International Journal of Construction Management, 20(5), 450–461.
https://doi.org/10.1080/15623599.2018.1484991
Naik, M. G., & Radhika, V. (2015). Time and cost analysis for highway road construction project using artificial neural networks. Journal of Construction Engineering and Project Management, 5(1), 26–31.
https://doi.org/10.6106/JCEPM.2015.5.1.026
Prasad, K. V., Vasugi, V., Venkatesan, R., & Bhat, N. (2019). Analysis of causes of delay in Indian construction projects and mitigation measures. Journal of Financial Management of Property and Construction, 24(1), 58–78.
https://doi.org/10.1108/jfmpc-04-2018-0020
Phonthan, P. (2012). Factors causing delays in construction works of automatic inspection gate installation projects: A case study of the Port of Bangkok [Master’s thesis]. King Mongkut’s University of Technology Thonburi.
Pooworakulchai, C., Kongsong, W., & Kongbenjapuch, K. (2016). The effects of government’s construction contract administration. International Journal of Engineering Research and Management (IJERM), 3, 39–43.
Pooworakulchai, C., Kongsong, W., & Kongbenjapuch, K. (2017). Affecting on contract administration in government construction projects. International Journal of Applied Engineering Research, 12(9), 2079–2086.
Rahman, M. D., Lee, Y. D., & Ha, D. K. (2014). Investigating main causes for schedule delay in construction projects in Bangladesh. Journal of Construction Engineering and Project Management, 4(3), 33–46.
https://doi.org/10.6106/JCEPM.2014.4.3.033
Samarghandi, H., Tabatabaei, S. M. M., Taabayan, P., et al. (2016). Studying the Reasons for Delay and Cost Overrun in Construction Projects: The Case of Iran. Journal of Construction in Developing Countries, 21(1), 51–84.
https://doi.org/10.21315/jcdc2016.21.1.4
Sanni-Anibire, M. O., Mohamad Zin, R., & Olatunji, S. O. (2020). Causes of delay in the global construction industry: a meta analytical review. International Journal of Construction Management, 22(8), 1395–1407.
https://doi.org/10.1080/15623599.2020.1716132
Sethakampu, J., & Suksil, N. (2019). Causes of delays in large building construction projects. Engineering Journal of Srinakharinwirot University, 3(14), 110–118.
Shafiq, M., Akhtar, A., Tahir, A. H., et al. (2021). Efficiency and effectiveness of humanitarian organizations’ logistics and supply chain management: a systematic review. Palarch’s journal of archaeology of Egypt/Egyptology, 18(7), 811–855.
Shafiq, M., & Soratana, K. (2019). Lean and agile paradigms in humanitarian organizations? Logistics and supply chain management. Logforum, 15(1), 139–153.
https://doi.org/10.17270/j.log.2019.294
Shrivas, A., & Singla, H. K. (2020). Analysis of interaction among the factors affecting delay in construction projects using interpretive structural modelling approach. International Journal of Construction Management, 22(8), 1455–1463.
https://doi.org/10.1080/15623599.2020.1728486
Srdić, A., & Šelih, J. (2015). Delays in Construction Projects: Causes and Mitigation. Organization, Technology & Management in Construction: An International Journal, 7(3), 1383–1389.
https://doi.org/10.5592/otmcj.2015.3.5
Sunjka, B. P., & Jacob, U. (2013). Significant causes and effects of project delays in the Niger delta region, Nigeria. Southern African Institute of Industrial Engineering, 641–14.
Tafazzoli, M., & Shrestha, P. P. (2017). Investigating Causes of Delay in US Construction Projects. In: Proceedings of the 53rd ASC Annual International Conference. pp. 611–621.
Tariq, J., & Shujaa Safdar Gardezi, S. (2023). Study the delays and conflicts for construction projects and their mutual relationship: A review. Ain Shams Engineering Journal, 14(1), 101815.
https://doi.org/10.1016/j.asej.2022.101815
Tashfeen, R., Saleem, I., Ashfaq, M., et al. (2023). How Do Women on Board Reduce a Firm’s Risks to Ensure Sustainable Performance during a Crisis? Sustainability, 15(14), 11145.
https://doi.org/10.3390/su151411145
Thomas, A. V., Kalidindi, S. N., & Ganesh, L. S. (2006). Modelling and assessment of critical risks in BOT road projects. Construction Management and Economics, 24(4), 407–424.
https://doi.org/10.1080/01446190500435275
Tumi, S. A. H., Omran, A., & Pakir, A. H. K. (2009). Causes of delay in construction industry in Libya. In: The International Conference on Economics and Administration. 265–272.
Wang, Y., & Yan, K. (2023). Machine learning-based quantitative trading strategies across different time intervals in the American market. Quantitative Finance and Economics, 7(4), 569–594.
https://doi.org/10.3934/qfe.2023028
Watanabe, W. C., & Shafiq, M. (2023). A Study on the Impact of Digital Marketing on Business Practices. Business Review of Digital Revolution, 3(1), 1–10.
Watanabe, W. C., Shafiq, M., Nawaz, M. J., et al. (2024). The impact of emotional intelligence on project success: Mediating role of team cohesiveness and moderating role of organizational culture. International Journal of Engineering Business Management, 16.
https://doi.org/10.1177/18479790241232508
Wutthipong, A. (2013). Factors affecting delays in construction projects in the Northeastern region of Thailand [Master’s thesis]. Suranaree University of Technology, Thailand.
Yan, K., Wang, Y., & Li, Y. (2023). Enhanced Bollinger Band Stock Quantitative Trading Strategy Based on Random Forest. Artificial Intelligence Evolution, 22–33.
https://doi.org/10.37256/aie.4120231991
Yitmen, I., & Soujeri, E. (2010). An artificial neural network model for estimating the influence of change orders on project performance and dispute resolution. Safety, 9(3), 3–4.