Since the systematic approach of the processes and their interactions, the aim is to establish the configuration of a construction project for the housing of the Weenhayek indigenous people. Applied from the theoretical research of various authors on a group of methodologies, phases and tools for project management, through rational scientific methods, such as descriptive, analytical, comparative, analytical-synthetic, inductive-deductive, historical-logical, analogies, modeling, systemic-structural-functional, systematization; and empirical methods, such as interpretivism that involves inductive, qualitative, phenomenological and transversal research, and the interview technique; the way in which the implementation processes are organized, interacted and structured is established. This reveals an alternative for the detailed configuration of a construction project for Weenhayek houses, based on phases, activities, actions and work tasks with characteristics in accordance with the needs of the project.
The interest in using project management office (PMO) services in organizations to manage their construction projects is growing in light of rising economic, technological, and social developments based on their ability to achieve organizational goals while avoiding risks. Accordingly, organizations use PMO services to manage their technical and financial project issues to periodically evaluate PMO performance and services in a scientific, practical, and measurable way to ensure successful project path via PMO. Therefore, this research aims to develop a performance evaluation system that enables organizations to follow up and evaluate the PMO performance to ensure that PMO manages the organizations’ expectations and goals successfully according to certain quality, scope, and cost. The study builds on significant findings in PMO competence indexes as evaluation matrix, which includes five basic categories with 136 indexes covering the project life cycle. The matrix was developed based on literature analysis and supplemented with experts’ interviews in construction management. The developed robust competency-based index (RCI) for directive PMO supports the organizations to conduct client satisfaction, correction, or partial/total change of the PMO’s competence flow within five construction project life cycle and process, i.e. governance, portfolio, information, execution, and contract issues.
Delay is the leading challenge in completing Engineering, Procurement, and Construction (EPC) projects. Delay can cause excess costs, which reduces company profits. The relationship between subcontractors and the main contractor is a critical factor that can support the success of an EPC project. The problematic financial condition of the main contractor can cause delay in payments to subcontractors. This research will set a model that combines the system dynamics and earned value method to describe the impact of subcontractor advance payments on project performance. The system dynamics method is used to model and analyze the impact of interactions between variables affecting project performance, while the earned value method is applied to quantitatively evaluate project performance and forecast schedule and cost outcomes. These two methods are used complementarily to achieve a holistic understanding of project dynamics and to optimize decision-making. The designed model selects the optimum scenario for project time and costs. The developed model comprises project performance, costs, cash flow, and performance forecasting sub-models. The novelty in this research is a new model for optimizing project implementation time and costs, adding payment rate variables to subcontractors and subcontractor performance rates. The designed model can provide additional information to assist project managers in making decisions.
Sustainability in road construction projects is hindered by the extensive use of non-renewable materials, high greenhouse gas emissions, risk cost, and significant disruption to the local community. Sustainability involves economic, environmental, and social aspects (triple bottom line). However, establishing metrics to evaluate economic, environmental, and social impacts is challenging because of the different nature of these dimensions and the shortage of accepted indicators. This paper developed a comprehensive method considering all three dimensions of sustainable development: economic, environmental, and social burdens. Initially, the economic, environmental, and social impact category indicators were assessed using the Life cycle approach. After that, the Analytic Hierarchy Process (AHP) method and Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) were utilized to prioritize the alternatives according to the acquired weightings and sustainable indicators. The steps of the AHP method involve forming a hierarchy, determining priorities, calculating weighting factors, examining the consistency of these assessments, and then determining global priorities/weightings. The TOPSIS method is conducted by building a normalized decision matrix, constructing the weighted normalized decision matrix, evaluating the positive and negative solutions, determining the separation measures, and calculating the relative closeness to the ideal solution. The selected alternative performs the highest Relative Closeness to the Ideal Solution. Lastly, a case study was undertaken to validate the proposed method. In three alternatives in the case study (Cement Concrete, Dense-Graded Polymer Asphalt Concrete, and Dense-Graded Asphalt Concrete), option 3 showed the most sustainable performance due to its highest Relative Closeness to the Ideal Solution. Integrating AHP and TOPSIS methods combines both strengths, including AHP’s structured approach for determining criteria weights through pairwise comparisons and TOPSIS’s ability to rank choices based on their proximity to an ideal solution.
The rapidly growing construction industry often deals with complex and dynamic projects that pose significant safety risks. One of the state-owned companies in Indonesia is engaged in large-scale toll road construction projects with a high incidence of workplace accidents. This study aims to improve safety performance in toll road construction by implementing the Scrum framework. The study uses a System Dynamics approach to model interactions between the Scrum framework, project management, and work safety subsystems. Various scenarios were designed by modifying controlled variables and system structures, including introducing a punishment entity. These scenarios were evaluated based on their impact on reducing incidents and the incident rate over the project period. The results indicate that the combined scenario significantly reduces incidents and incident rates in different conditions. The study also finds a strong relationship between Scrum framework implementation and improved safety performance, demonstrating a reduction in incidents and incident rates by over 50% compared to existing conditions. This research underlines the effectiveness of the Scrum framework in enhancing safety in construction projects.
The digitalization of the construction industry is deemed a crucial element in Construction 4.0’s vision, attainable through the implementation of digital twinning. It is perceived as a virtual strategy to surmount the constraints linked with traditional construction projects, thereby augmenting their productivity and effectiveness. However, the neglect to investigate the causal relationship between implementation and construction project management performance has resulted from a lack of understanding and awareness regarding the consequences of digital twinning implementation, combined with a shortage of expertise among construction professionals. Consequently, this paper extensively explores the relationship between digital twinning implementation and construction project management performance. The Innovation Diffusion Theory (IDT) is employed to investigate this relationship, utilizing a quantitative research approach through document analysis and questionnaire surveys. Additionally, partial least squares structural equation modeling (PLS-SEM) with SmartPLS software is employed to deduce the relationship. The results underscore that digital twinning implementation significantly improves construction project management performance. Despite recognizing various challenges in digital twinning implementation, when regarded as moderating factors, these challenges do not significantly impact the established causal relationship. Therefore, this investigation aligns with the national push toward the digitalization of the construction sector, highlighting the positive impacts of digital twinning implementation on construction project management performance. Moreover, this study details the impacts of implementing digital twinning from the construction industry’s perspective, including positive and negative impacts. Afterwards, this paper addresses the existing research gap, providing a more precise understanding and awareness among construction industry participants, particularly in developing nations.
Copyright © by EnPress Publisher. All rights reserved.