The article’s proposed engineering uses are based on theories presented in the reviewed research articles and on findings from online investigations into companies that claim to use nanoengineering in their wares. Several pre-existing online consumer inventories and nanotechnology news were examined as part of the internet inquiry. The data about the nanoparticles (NP), or nanostructure, used in commercially available products comes from the remarks made by the manufacturer. Nanoengineered coating agents and textile additives are examples of commercial items developed for industrial clients that fall under the aforementioned uses.
Scholars widely agree that modular technologies can significantly improve environmental sustainability compared to traditional building methods. There has been considerable debate about the viability of replacing traditional cast-in-place structures with modular construction projects. The primary purpose of this study is to determine the feasibility of using modular technology for construction projects in island areas. Thus, it is necessary to investigate the potential problems and suitable solutions associated with modular building project implementation. This study is accomplished through the use of qualitative and quantitative methods. It systematically examines desk research based on the wide academic literature and real case studies, collating secondary data from government files, news articles, professional blogs, and interviews. This research identifies several important barriers to the use of modular construction projects. Among the issues are the complexity of stakeholder engagement, limited practical skills and construction methodologies, and a scarcity of manufacturing capacity specialised for modular components. Fortunately, these unresolved challenges can be mitigated through fiscal incentives and governmental regulations, induction training programmes, efficient management strategies, and adaptive governance approaches. As a result, the findings support the feasibility of starting and advancing modular building initiatives in island areas. Project developers will likely be more willing to embrace and commit resources to initiate modular building projects. Additional studies can be undertaken to acquire the most recent first-hand data for detailed validation.
Bamboo is one of the noble plant species in Ethiopia. Household (HH) income and construction role of highland bamboo (Oldeania alpina (K. Schum.) Stapleto) stands were assessed at Masha district, Southern Ethiopia. Three peasant associations (PAs), Yepo, Yina and Gada, 7–15 key informants and 68, 46, 31 households, respectively were interviewed about the cost and income of bamboo to compare with woody climbers, honey, and mushroom in 2021. Bamboo was one of the main sources of income in all PAs, at least for fencing or house construction. In Yepo, Yina and Gada bamboo accounts 0.7%, 28.1%, 16.3% of the HH NTFP income, respectively. The local people responded that bamboo constructed houses and fences were durable for 15–30 and 2–10 years, respectively. In constructing a 2.44–4.27 m radius local house in Yepo, Yina and Gada 2.4–6 m3, 4.1–5.82 m3 and 3.1–4.3 m3 bamboo culms were harvested at 15, 20, and 30 years interval, respectively by each HH. Bamboo young shoots were also seasonally used for food. Although bamboo provides multiple uses, like substitute for wood and environmental services, it was facing different problems of deforestation. Therefore, policy attention is highly important for bamboo sustainable utilization.
Delay is the leading challenge in completing Engineering, Procurement, and Construction (EPC) projects. Delay can cause excess costs, which reduces company profits. The relationship between subcontractors and the main contractor is a critical factor that can support the success of an EPC project. The problematic financial condition of the main contractor can cause delay in payments to subcontractors. This research will set a model that combines the system dynamics and earned value method to describe the impact of subcontractor advance payments on project performance. The system dynamics method is used to model and analyze the impact of interactions between variables affecting project performance, while the earned value method is applied to quantitatively evaluate project performance and forecast schedule and cost outcomes. These two methods are used complementarily to achieve a holistic understanding of project dynamics and to optimize decision-making. The designed model selects the optimum scenario for project time and costs. The developed model comprises project performance, costs, cash flow, and performance forecasting sub-models. The novelty in this research is a new model for optimizing project implementation time and costs, adding payment rate variables to subcontractors and subcontractor performance rates. The designed model can provide additional information to assist project managers in making decisions.
Copyright © by EnPress Publisher. All rights reserved.