Realistic project scheduling and control are critical for running a profitable enterprise in the construction industry. Finance-based scheduling aims to produce more realistic schedules by considering both resource and cash constraints. Since the introduction of finance-based scheduling, its literature has evolved from a single-objective model to a multi-objective model and also from a single-project problem to a multi-project problem for a contractor. This study investigates the possibility of cooperation among contractors with concurrent projects to minimize financial costs. Contractors often do not use their entire credit and may be required to pay a penalty for the unused portions. Therefore, contractors are willing to share these unused portions to decrease their financing costs and consequently improve their overall profits. This study focuses on the partnering of two contractors in a joint finance-based scheduling where contractors are allowed to lend credit to or borrow credit from each other at an internal interest rate. We apply this approach to an illustrative example in which two concurrent projects have the potential for partnering. Results show that joint finance-based scheduling reduces the financing cost for both contractors and leads to additional overall profits. Our further analyses highlight the intricate dynamics impacting additional net profit, revealing optimal scenarios for cooperation in complex project networks.