Track maintenance planning and optimization considering unit track section combination
Given the large amount of railway maintenance work in China, whereas the maintenance time window is continuously compressed, this paper proposes a novel network model-based maintenance planning and optimization method, transforming maintenance planning and optimization into an integer linear programming problem. Based on the dynamic inspection data of track geometry, the evaluation index of maintenance benefit and the model of the decay and recovery of the track geometry are constructed. The optimization objective is to maximize the railway network’s overall performance index, considering budget constraint, maximum length constraint, maximum number of maintenance activities within one single period constraint, and continuity constraint. Using this method, the track units are divided into several maintenance activities at one time. The combination of surrounding track units can be considered for each maintenance activity, and the specific location, measure, time, cost, and benefit can be determined. Finally, a 100 km high-speed railway network case study is conducted to verify the model’s effectiveness in complex optimization scenarios. The results show that this method can output an objective maintenance plan; the combination of unit track sections can be considered to expand the scope of maintenance, share the maintenance cost and improve efficiency; the spatial-temporal integrated maintenance planning and optimization can be achieved to obtain the optimal global solution.