This study examines conditions that impact PPP delivery success or failure in the roadways sector in India using Qualitative Comparative Analysis. QCA is well-suited for problems where multiple factors combine to create pathways leading to an outcome. Past investigations have compared PPP and non-PPP project delivery performance, but this study examines performance within PPPs by uncovering a set of conditions that combine to influence the success or failure road PPP project delivery in India. Based on data from 21 cases, pathways explaining project delivery success or failure were identified. Specifically, PPPs with high concessionaire equity investment and low regional industrial activity led to project delivery success. Projects with lower concessionaire equity investment and low reliance on toll revenue and with either: (a) high project technical complexity or (b) high regional industrial activity, led to project delivery failure. The pathways identified did not have coverage values that they were extremely strong. Coverage strength was hindered by lack of access to information on additional conditions that could be configurationally important. Further, certain characteristics of the Indian market limit generalization. Identification of combinations of conditions leading to PPP project delivery success or failure improves knowledge of the impacts of structure and characteristics of these complex arrangements. This study is one of the first to use fuzzy QCA to understand project delivery success/failure in road PPP projects. Moreover, this study takes into account factors specific to a sector and delivery mode to explain project delivery performance.
COVID-19 pandemic has caused many design bid build projects to suffer losses. Design bid build or DBB has the disadvantage of depth partnering. The research purpose is to reveal the depth of partnering of DBB, the characteristics of existing partnering in DBB through detection in each project life cycle in DBB, then efforts to increase DBB partnering to partnering in integrated project delivery (IPD). The methodology used is secondary data from three project DBB, then validation using focused group discussions (FGD) with expert judgment, then the Delphi method to analyse and propose recommendations. This project recommends that DBB project can improve the project performance so stakeholder can increase partnering toward integrated project delivery (IPD) partnering. This research can be used for increasing partnering in DBB projects towards partnering in IPD. This research will produce strategic recommendations that can be utilized by stakeholders (owner, contractor, designer) in improving project performance to generate great value for the project, will result in long-term project sustainability, improve relationships, and learn valuable lessons for future projects. DBB projects usually experience many problems due to the competitive nature of partnering for owners, contractors, and designers, so it is necessary to develop an overall strategy as an option to improve partnering in DBB project contracts. This research will help create a sustainable project by the owner, contractor, and designer.
The recent development of characteristic towns has encountered a multitude of challenges and chaos. Nevertheless, there have been many instances of information asymmetry due to the absence of an effective management model and an intuitive digital management system. Consequently, this has caused the erosion of public interests and inadequate supervision by public agencies. As society is progressing at a rapid pace, there is a growing apprehension regarding poor management synergy, outdated management practices, and limited use of technology in traditional construction projects. In today's technologically sophisticated society characterized by the “Internet+” and intelligent management, there is an urgent requirement to identify a more efficient collaborative management model, thereby reducing errors caused by information asymmetry. This paper focuses on the integration of building information modeling (BIM) and integrated project delivery (IPD) for collaborative management within characteristic towns in the PPP mode. By analyzing the available literature on the application status, this study investigates the implementation methods and framework construction of collaborative management while exploring the advantages and disadvantages. On this basis, this study highlights the problems that arise and provides recommendations for improvement. Considering this, the application of the BIM-based IPD model to characteristic towns in PPP mode will enhance the effectiveness of collaborative management among all parties involved, thereby fostering an environment that facilitates decision-making and operational management in the promotion of characteristic industries.
The Indonesian government is currently carrying out massive infrastructure development, with a budget exceeding 10. Risk mapping based on good risk management is crucial for stakeholders in organizing construction projects. Projects financed by government, whether solicited or unsolicited schemes, should also include risk mapping to add value and foster partnerships. Therefore, this study aimed to develop a risk management model for solicited and unsolicited projects, focusing on the collaborative management system among stakeholders in government-financed projects. Risk review was conducted from various stakeholders’ perspectives, examining the impacts and potential losses to manage uncertainty and reduce losses for relevant parties. Furthermore, qualitative analysis was conducted using Focus Group Discussion (FGD) and in-depth interviews. The results showed that partnering-based risk management with risk sharing in solicited and unsolicited projects had similarities with Integrated Project Delivery (IPD). This approach provided benefits and value by developing various innovations in the project life cycle.
Project success requires team commitment, which is a product of an encouraging culture of cooperation and teamwork among project team members. The research work aims to ascertain which components of team commitment affect the performance of construction projects in Nigeria. The research adopted a quantitative design where questionnaires were used for data collection. Out of 1233 questionnaires distributed, 975 were received with valid responses and used for data analysis. Data were analysed descriptively using percentage, mean score, and relative agreement index. The study showed the factors of team commitment having an effect on project performance, as rated by the respondents, to be: Normative component: “Project team members owe a great deal to this organisation”; “Members of the project team do not feel it is right to quit the project before completion”; “This organisation has a great deal of personal meaning for project team members”. Affective component: “This organisation deserves the loyalty of project team members”; “The project team considers the team’s problems as their own. Then, “One of the few negative consequences of leaving this organisation will be the scarcity of available alternatives” is for continuance. In conclusion, the emotional attachment of the team members and sense of obligation to the project team and construction organisation are the driving forces behind pushing for the successful outcome of projects within the Nigerian construction industry.