In the present study, friction damper, an energy dissipating passive device is explored to reduce the response of open ground storey building under lateral loading due to earthquake. This damper is installed in the selected bays of open ground storey so that the response is reduced. The masonry infill wall is macro-modeled in the form of compression only diagonal members. Three different types of bracing system were installed along with Pall friction damper – single diagonal tension – compression brace with friction damper, tension only cross brace with friction damper and chevron brace with friction damper were modeled using Wen’s plastic link element in SAP2000. G+4 storey buildings were analyzed using nonlinear time history analysis. The storey displacement and inter-storey drift for all the cases were compared in the study.
Soil and groundwater remediation act has been enacted and executed since year 2000 in Taiwan. It has been ten good years till today where lots of remediation techniques progressively employed to improve Taiwan soil and groundwater resource quality. Regulatory agencies, academia, remediation consulting firms, on-site professional engineers all have contribute the proud ten years in terms of soil and groundwater clean-up contribution. However, some of technologies were un-environmental friendly even detrimental and damage to Taiwan precious soil and groundwater resources. In Article one of the current Taiwan soil and groundwater Act, it clearly stated that soil is a precious nature resources. Soil definitely is not a waste, shame on us most of current most commonly employed remediation are unlawful and merely aiming to save time and money consideration without any care to our land. Dig-and-dump and soil acid washing are damaged employed in almost every single local environment agency soil clean-up project. Lot of money, effort and time has been spent during past ten years. Most of the spending is not improving soil quality using Green approach.
Increasing water consumption has increased using of synthetic nutritional methods for enriching groundwater resources. Artificial feeding is a method that can save excess water for using in low level water time in underground. The purpose of this study is to evaluate the performance of the flood dispersal and artificial feeding system in the Red Garden of Shahr-e-Daghshan and improving, saving quality of the groundwater table in the area. In order to investigate the performance of these plans, an area of 1570 km2 was considered in the Southern of Shah-Reza. The statistics data from 5 years before the design of the plans (1986-2002) related to flood control fluctuations in 20 observation wells and many indicator Qanat were surveyed in this area. The annual fluctuations in the level of the station show a rise in the level of the station after the depletion of the plan. Dewatering of the first and second turns, with an increase of more than one meter above groundwater level, has had the highest impact on the level of groundwater table in the region. Reduced permeability at sediment levels, wasted flood through evaporation and wasteful exploitation of groundwater resources, cause to loss of the impact on the increase in the level and quality of groundwater in the area, especially in the dry, drought season and recent high droughts.
Coal is important basic energy and important raw materials, the development of coal industry to support the rapid development of the national economy. In the 1950s and 1960s, the proportion of coal in China's primary energy production and consumption structure accounted for 90% and 80% respectively, and the proportion of coal in 2004 was 75.6% and 67.7% respectively. In recent years, with the rapid development of fully mechanized mining equipment manufacturing technology, fully mechanized mining equipment to heavy, strong and automated, so that the reliability of the equipment is guaranteed, a strong impetus to the development of large mining technology, new round of coal mining technology revolution, the current in the East, Jincheng and other mining areas have been the first in the thick coal seam f = 1.5-5 use of large mining height fully mechanized mining equipment, to achieve the highest efficiency, the lowest cost of tons of coal. The main points of this paper are: in the production of coal enterprises to improve the competitiveness of the coal market. Conditions and conditions of coal storage conditions should be allowed to give priority to the use of large mining and mining methods.
Copyright © by EnPress Publisher. All rights reserved.