The rare earth mining area in South China is the main production base of ionic rare earth in the world, which has brought inestimable economic value to the local area and even the whole nation. However, due to the lack of mining technology and excessive pursuit for economic profits, a series of environmental problems have arisen, which is a great threat to the ecosystem of the mining area. Taking Lingbei rare earth mining area in Ganzhou as an example, this paper discriminated and analyzed such aspects as the ecological source, ecological corridor and ecological nodes of the mining area based on the landscape ecological security pattern theory and the minimum cumulative resistance model (MCR) method, and constructed a landscape ecological security pattern of the mining area during the 2009, 2013 and 2018. The results show that: i) The patch area of the ecological source of rare earth mining area is small, mainly concentrated in the east and west sides of the mining area. ii) During the selected year, the ecological source area, ecological corridors, radiation channels and the number of ecological nodes in the rare earth mining area are increasing, indicating that the landscape ecological security of the rare earth mining area has been improved to some extent, but it remains necessary for relevant departments to make a optimized planning to further reconstruct the ecological security pattern of the rare earth mining area.
This paper analyzed the equitable allocation of infrastructure across regional states in Ethiopia. In general, in the past years, there has been a good start in the infrastructure sector in Ethiopia. However, the governance and equity system of infrastructure in Ethiopia is not flexible, not technology-oriented, not fair, and not easily solved. The results of in-depth interviews and focus group discussions (FGDs) showed that there is a lack of institutional capacity, infrastructure governance, and equity, which has negatively impacted the state- and nation-building processes in Ethiopia. According to the interviewees, so long as the unmet demand for infrastructure exists, it remains a key restrain on doing business in most Ethiopian regional states. This is due to the lack of integrated frameworks, as there are coordination failures (lack of proper government intervention, including a lack of proper understanding and implementation of the constitution and the federal system). In Ethiopia, to reduce these bottlenecks arising from the lack of institutional capacity, infrastructure governance, and equity and their effects on nation-building, first of all, the government has to critically hear the people, deeply assess the problems, and come to the point and then discuss the problems and the way forward with the society at large.
This paper reviews and compares the opportunities and challenges in terms of port and intermodal development in China and India—the two fast-growing economic giants in the world. The study analyzes the future direction of these two countries’ port-hinterland intermodal development from the sustainability perspective. Both China and India face some major opportunities and challenges in port-hinterland intermodal development. The proposal of the Silk Road Economic Belt and the 21st-century Maritime Silk Road, also known as the Belt and Road Initiative (BRI), offers plentiful opportunities for China. A challenge for China is that its development of dry ports is still in the infancy stage and thus it is unable to catch up with the pace of rapid economic growth. As compared with China, India focuses more on the social aspect to protect the welfare of its residents, which in turn jeopardizes India’s port-hinterland intermodal development in the economic sense. The biggest challenge for India is its social institution, which would take a long time to change. These in-depth comparative analyses not only give the future direction of port-hinterland intermodal development in China and India but also provide references for other countries with similar backgrounds.
Developing Asia’s infrastructure gap results from both inadequate public resources and a lack of effective channels to mobilize private resources toward desired outcomes. The public-private partnership (PPP) mechanism has evolved to fill the infrastructure gap. However, PPP projects are often at risk of becoming distressed, or worst, being terminated because of the long-term nature of contracts and the many different stakeholders involved. This paper applies survival-time hazard analysis to estimate how project-related, macroeconomic, and institutional factors affect the hazard rate of the projects. Empirical results show that government’s provision of guarantees, involvement of multilateral development banks, and existence of a dedicated PPP unit are important for a project’s success. Privately initiated proposals should be regulated and undergo competitive bidding to reduce the hazard rate of the project and the corresponding burden to the government. Economic growth leads to successful project outcomes. Improved legal and institutional environment can ensure PPP success.
Starting from the ‘90s, there has been a significant increase in PPP use in the public sector in Europe, benefiting the implementation of infrastructure projects. In Italy, PPP is still much more limited than in such countries as the UK and France: the projects funded are smaller and the sectors involved are less appropriate. Based on the economic literature, European initiatives and international comparisons, the paper examines aspects of regulations that could encourage the appropriate use of PPP and considers the problems with the Italian regulations, while proposing some corrective measures. The main limitations involve: i) the absence of adequate preliminary assessments about the advantages of using PPP rather than the traditional procurement, ii) the relative lack of attention to the contract terms, iii) inadequate safeguards to ensure the bankability of the projects, and iv) limited information transparency and accessibility.
Copyright © by EnPress Publisher. All rights reserved.