Two kinds of solar thermal power generation systems (trough and tower) are selected as the research objects. The life cycle assessment (LCA) method is used to make a systematic and comprehensive environmental impact assessment on the trough and tower solar thermal power generation. This paper mainly analyzes the three stages of materials, production and transportation of two kinds of solar thermal power generation, calculates the unit energy consumption and environmental impact of the three stages respectively, and compares the analysis results of the two systems. At the same time, Rankine cycle is used to compare the thermal efficiency of the two systems.
In November 2018, the sample plot survey method was used to analyze the population characteristics of Lithocarpus polystachyus in the natural secondary forest with different disturbance intensity in Jianning, Fujian Province, and compile its population static life table. The results showed that the number of individuals in the population was small, but it was clustered. With the increase of interference intensity, the first and second age seedlings and young trees decreased. The population types affected by human disturbance are all lacking level V trees, and the population type belongs to primary population (N1); The undisturbed population lacks level I and II seedlings and young trees, but there are level V trees, and the population type belongs to medium decline population (S2). In general, all populations of L. polystachyus are unstable and belong to the transitional type. In the static life table, the mortality of level I and II seedlings and young trees is high, the survival rate has a small peak in level III and IV, and then the survival rate decreases rapidly, and the average life expectation of level II is the highest. It shows that artificial conservation measures and appropriate space re-lease are needed to maintain the stability of the population.
While there has been much discussion about the large infrastructure needs in Asia and the Pacific, less attention has been paid to public expenditure efficiency in infrastructure services delivery. New constructions are not the only solution, especially when governments have limited capital to invest. Globally, new infrastructure projects face delays and cost overruns, leading to an inefficient use of public resources. The root causes include the lack of transparency in project selection, the lack of project preparation, the silo approach by public entities in assessing feasibility studies, and the lack of public sector capacity to fully develop a bankable pipeline of projects. To tackle these issues, governments need a smarter investment approach and to do so, enhancing public service efficiency is very crucial. The paper suggests a “whole life cycle” (WLC) approach as the main strategic solution for the discussed issues and challenges. We expand the definition of WLC to include the entire life cycle of the infrastructure asset from need identification to its disposal. The stages comprise planning, preparation, procurement, design, construction, operation and maintenance, and disposal. This is because we believe any efficient or inefficient decision throughout such a wide life cycle influences the quality of public services. Hence, in this holistic approach, infrastructure life cycle consists of four phases: planning, preparation, procurement, and implementation. Governments could enhance public efficiency and thus improve access to finance throughout the WLC by several solutions. These are (i) preparing infrastructure master plan and pipelines and long-term budgeting during the planning phase; (ii) establishing framework and guidelines and improving governance during preparation phase; (iii) promoting standardization, transparency, open government, and contractual consistency during the procurement phase; and finally (iv) continued role of government and total asset management during the implementation phase. In addition to these phase-specific means, key WLC solutions include proper use of technology, capacity building, and private participation in general and public-private partnership (PPP) in particular.
A large number of people of the fringe areas of Sundarban enter into the forests every year and encounter with the tigers simply for their livelihood. This study attempts to examine the extent and impact of human-animal conflicts in the Sundarban Reserve Forest (SRF) area in West Bengal, India. An intensive study of the data of the victims (both death and injury) between 1999 and 2014 reveals that, fishermen crab collector, honey collectors and woodcutters are generally victimized by the tiger attack. Pre monsoon period (April to June) and early winter period (Jan to March) are noted for the two-peak periods for casualties. Maximum casualty occurs between 8-10 am, and 2-4 pm. Jhilla (21.1%), Pirkhali (19.72 %), Chandkhali (11.72%), and Arbesi (9.35%) are the four most vulnerable forest blocks accounting more than 60 per cent occurrence of incidences. 67.24 per cent of the tiger attack victims were residents of Gosaba followed by Hingalganja (15%) and Basanti, (9.76%). The vulnerability rating puts the risk of tiger attack to 0.88 for every 10,000 residents of Gosaba block followed by 0.33 at Hingalganj Block and 0.11 at Bansanti Block. The majority of the victims (68%) were found to be males, aged between 30 and 50 years.
Copyright © by EnPress Publisher. All rights reserved.