This study aims to identify the risk factors causing the delay in the completion schedule and to determine an optimization strategy for more accurate completion schedule prediction. A validated questionnaire has been used to calculate a risk rating using the analytical hierarchy process (AHP) method, and a Monte Carlo simulation on @RISK 8.2 software was employed to obtain a more accurate prediction of project completion schedules. The study revealed that the dominant risk factors causing project delays are coordination with stakeholders and changes in the scope of work/design review. In addition, the project completion date was determined with a confidence level of 95%. All data used in this study were obtained directly from the case study of the Double-Double Track Development Project (Package A). The key result of this study is the optimization of a risk-based schedule forecast with a 95% confidence level, applicable directly to the scheduling of the Double-Double Track Development Project (Package A). This paper demonstrates the application of Monte Carlo Simulation using @RISK 8.2 software as a project management tool for predicting risk-based-project completion schedules.
Infrastructure development is critical for sustaining Asia’s economic growth. Unfortunately, huge financing gaps—estimated by a recent Asian Development Bank study to be USD22.5 trillion—constrain the ability of most emerging Asian countries to fully realize the benefits of infrastructure development. For instance, over 70% of infrastructure investments in Asia are still funded by public resources, which pose acute financing challenges for many countries with limited budgets and fiscal constraints. This paper discusses some of the challenges associated with public financing of infrastructure projects in emerging Asian countries, before introducing some new options for alleviating their infrastructure investment needs. In particular, it proposes a new approach to infrastructure financing by utilizing the spillover effects of infrastructure investment, where additional revenues generated from such investment can be channeled back to investors as subsidy to increase the returns to their investment. The paper also argues the need for Asian countries to implement fiscal reforms and to develop a more balanced approach to financing, one that involves both the private and public sector.
Investment growth in many emerging market and developing economies (EMDEs) has slowed sharply since 2010. Investment growth performance has varied significantly across different regions, however. This paper examines the evolution of investment growth in six EMDE regions, documents remaining investment needs, especially for infrastructure, and presents a set of region-specific policy responses to address these needs. It reports three main findings. First, investment growth has been particularly weak in EMDE regions hosting a large number of commodity exporters. In regions with a substantial number of commodity-importing economies, investment growth has been somewhat resilient but has also declined steadily since 2010. Second, sizable investment needs remain in most EMDE regions to make room for expanding economic activity and rapid urbanization. A large portion of these investment needs is in infrastructure and human capital. Finally, while specific policy priorities vary across regions, several policy options to address remaining investment needs apply universally. These include more, and more efficient, public investment and measures to improve overall growth prospects and the business climate. Improved project selection and monitoring, as well as better governance, may enhance the efficiency and benefits from public investment.
Intra-regional trade serves as a key growth engine for East Asian economies. Accompanying the rapid growth of bilateral and intra-regional trade ties, the East Asian economies are becoming increasingly connected and interdependent. Infrastructure connectivity plays a crucial role in bridging different areas of the East Asian region and enabling them to reap the full socioeconomic benefits of economic cooperation and integration. Nevertheless, further improvement of infrastructure in the region faces major challenges due to the lack of effective mechanisms for coordination and dialogue on regional integration through funding infrastructure projects, as well as the serious trust deficit among member states that has arisen from the on-going territorial and historical disputes.
Scholars widely agree that modular technologies can significantly improve environmental sustainability compared to traditional building methods. There has been considerable debate about the viability of replacing traditional cast-in-place structures with modular construction projects. The primary purpose of this study is to determine the feasibility of using modular technology for construction projects in island areas. Thus, it is necessary to investigate the potential problems and suitable solutions associated with modular building project implementation. This study is accomplished through the use of qualitative and quantitative methods. It systematically examines desk research based on the wide academic literature and real case studies, collating secondary data from government files, news articles, professional blogs, and interviews. This research identifies several important barriers to the use of modular construction projects. Among the issues are the complexity of stakeholder engagement, limited practical skills and construction methodologies, and a scarcity of manufacturing capacity specialised for modular components. Fortunately, these unresolved challenges can be mitigated through fiscal incentives and governmental regulations, induction training programmes, efficient management strategies, and adaptive governance approaches. As a result, the findings support the feasibility of starting and advancing modular building initiatives in island areas. Project developers will likely be more willing to embrace and commit resources to initiate modular building projects. Additional studies can be undertaken to acquire the most recent first-hand data for detailed validation.
The Belt and Road Initiative (BRI) aims to enhance connectivity and collaboration among 60 countries and beyond in Asia, Africa and Europe. Information and communications technology (ICT) is an indispensable component of the initiative, critical in providing fundamental communication channels for global financial transactions, trade exchanges and transport and energy connectivity, and socio cultural collaboration and scientific exchanges between people, organizations and countries along the BRI corridors. Previously constrained by infrastructure deficits in ICT, the Asia-Pacific region is accelerating its efforts to provide reliable and affordable broadband networks throughout the region, to contribute to successful implementation of the Sustainable Development Goals (SDG).
Within the BRI corridors, this study which has been undertaken as part of the research programme of the United Nations Economic and Social Commission for Asia and the Pacific (ESCAP) on promoting regional economic cooperation and integration, focuses on the China-Central Asia Corridor (China, Kazakhstan, Kyrgyzstan, Tajikistan, Turkmenistan and Uzbekistan), giving attention to the sub-region’s specific challenges, namely limited international transit opportunities and an increase in bandwidth requirements that is expected to grow exponentially, as the fourth industrial evolution centered on automation and artificial intelligence gathers momentum. The sub-region is characterized as highly dependent on the ease and costs of connecting to neighboring countries for transit, as many countries in the sub-region are landlocked developing countries (LLDC). Because of the geographical features and other factors, the development potential of Central Asia and its integration into globalization, continues to be stymied by insufficient international bandwidth and high transit costs to access international links. Therefore, improved ICT connectivity in Central Asia through the BRI corridor could result in improved availability and affordability of broadband networks and services in the sub-region.
For the purpose of this study, a gap analysis is the methodology that underpins the proposed topology for the China-Central Asia Corridor. The analysis included examining the current state of the optic infrastructure, such as existing and planned fiber-optic networks, existing Internet Exchange Points (IXPs) and international gateways. The study also identifies the key factors that determine the desired future state of infrastructure deployment for the BRI initiative. A topology that consists of connecting Almaty (Kazakhstan) and Urumqi (China), as core nodes, is proposed based on a partial mesh topology. Over and above this core finding, the study concludes that digital infrastructure connectivity has a tendency of lagging behind the rapid opportunities evolving, and the study therefore advocates for sub-regional and regional approaches, including the BRI and Asia-Pacific Information Superhighway (AP-IS) in further expanding regional broadband networks. A key recommendation of the study is co-deployment of broadband infrastructure along passive infrastructure, as an additional cost effective means of achieving fast and affordable broadband connectivity for all.
Copyright © by EnPress Publisher. All rights reserved.