This study aimed to examine the compliance of post-disaster emergency assembly areas with their planning criteria in the Battalgazi district of Malatya province. This district is one of the settlements that was most affected by the two big earthquakes that occurred in Türkiye on 6 February 2023. The emergency assembly areas were evaluated qualitatively based on the criterion of “appropriateness”, with the sub-variables of “usability”, “accessibility”, and “safety”. They were also evaluated quantitatively based on the criterion of “adequacy” with the sub-variable “per capita m2”. There are a total of 103 neighborhoods in the district. However, there are only eight emergency assembly areas in total within its boundaries. According to the results of this study, only 7.5% of the current population of the district resides within 500 m of the emergency assembly areas. The fact that four emergency assembly areas (Hürriyet Park, Şehit Kemal Özalper High School, the Community Garden, Battalgazi Municipality) are situated next to each other and there are emergency assembly areas in only six of the 103 neighborhoods within the municipal boundaries shows that were significant problems in the decisions made regarding their locations. In addition, it was determined that there were disadvantages in terms of accessibility and usability within the criterion of appropriateness, while there were some positive aspects in terms of safety. When examined with regard to the criterion of adequacy, it was determined that the emergency assembly areas at Mişmiş Park, the Community Garden, Battalgazi Municipality, and Şehit Kemal Özalper High School were most adequate, while the emergency assembly areas at Hürriyet Park, Fırat Neighborhood Mukhtar, Nevzat Er Park, and 100 Yıl İmam Hatip Secondary School were least adequate.
The Indonesian government is currently carrying out massive infrastructure development, with a budget exceeding 10. Risk mapping based on good risk management is crucial for stakeholders in organizing construction projects. Projects financed by government, whether solicited or unsolicited schemes, should also include risk mapping to add value and foster partnerships. Therefore, this study aimed to develop a risk management model for solicited and unsolicited projects, focusing on the collaborative management system among stakeholders in government-financed projects. Risk review was conducted from various stakeholders’ perspectives, examining the impacts and potential losses to manage uncertainty and reduce losses for relevant parties. Furthermore, qualitative analysis was conducted using Focus Group Discussion (FGD) and in-depth interviews. The results showed that partnering-based risk management with risk sharing in solicited and unsolicited projects had similarities with Integrated Project Delivery (IPD). This approach provided benefits and value by developing various innovations in the project life cycle.
This research explores the interactions within supply chains in the manufacturing sector, with a special emphasis on the distinctive obstacles encountered by the mosquito coil industry. The study is motivated by the need to comprehensively understand and address the multifaceted challenges encountered by manufacturers in their supply chain processes. The mosquito coil industry holds significant importance in Malaysia, primarily due to the country’s tropical climate, which is conducive to mosquito proliferation and the transmission of mosquito-borne diseases. Nowadays, there are growing complexities and disruptions experienced by the mosquito coil sector’s supply chain, prompting an in-depth investigation. The main objective is to identify the challenges and resilience strategies employed by manufacturers in this sector, providing an understanding that contributes to the broader discourse on supply chain dynamics. Employing a qualitative case study methodology, this research engages in extensive data collection through interviews, document analysis, and direct observations within the selected mosquito coil manufacturing entity. This methodology allows for an immersive exploration of the challenges faced, revealing insights into the factors influencing the supply chain dynamics. The study reveals a wide array of challenges, from obtaining raw materials to managing distribution logistics, underscoring the unique complexities specific to the sector. As a result, the research identifies and analyzes resilience strategies implemented by the mosquito coil manufacturer to mitigate challenges, such as procurement challenges faced in financial related issues, logistical complexities occurred from recent years’ worldwide pandemic, production disruptions from company’s human resource-related issues, global factors from the company’s competitors and market challenges, and technology integration from rapid technological advancements. Thus, implications of this study extend beyond the mosquito coil sector, contributing valuable knowledge to the academic community, practitioners, and policymakers involved in supply chain management. The research not only addresses the identified challenges but also serves as a foundation for enhancing the overall understanding of manufacturing supply chain dynamics, thereby fostering informed decision-making for improved industry resilience.
This research intends to find out the compliance acts based on the manufacturing industry of Bangladesh and lead to the development of the integrated theory of compliance model. There are several compliance regulations, that are separately dealt with in any manufacturing organization. These compliance regulations are handled at various ends of the organization making the process quite scattered, time-consuming, and tedious. To fix this problem, the integration of organizational compliance regulations is brought under one platform. Researchers have applied the qualitative approach with multiple case studies methodology scrutinizing the in-depth interviews and transcripts. Furthermore, the NVIVO tool has been used to analyze, where the necessary themes of the Organizational Compliance Regulations are found. Therefore, we have proposed a conceptual framework to inaugurate a standalone combined framework, which is an innovative and novel measure.
This study investigates seismic risk and potential impacts of future earthquakes in the Sunda Strait region, known for its susceptibility to significant seismic events due to the subduction of the Indo-Australian Plate beneath the Eurasian Plate. The aim is to assess the likelihood of major earthquakes, estimate their impact, and propose strategies to mitigate associated risks. The research uses historical seismic data and probabilistic models to forecast earthquakes with magnitudes ranging from 6.0 to 8.2 Mw. The Gutenberg-Richter model helps project potential earthquake occurrences and their impacts. The findings suggest that the probability of a major earthquake could occur as early as 2026–2027, with a more significant event estimated to likely occur around 2031. Economic estimates for a 7.8–8.2 Mw earthquake suggest potential damage of up to USD 1.255 billion with significant loss of life. The study identifies key vulnerabilities, such as inadequate building foundations and ineffective disaster management infrastructure, which could worsen the impact of future seismic events. In conclusion, the research highlights the urgent need for comprehensive seismic risk mitigation strategies. Recommendations include reinforcing infrastructure to comply with seismic standards, implementing advanced early warning systems, and enhancing public education on earthquake preparedness. Additionally, government policies must address these issues by increasing funding for disaster management, enforcing building regulations, and incorporating traditional knowledge into construction practices. These measures are essential to reducing future earthquake impacts and improving community resilience.
A precise risk assessment in a production line constitutes a significant item to identify susceptible areas where there is a possibility of product quality degradation. This also applies to the precast concrete production line in Indonesia that has a spun pile product. Based on a risk assessment activity conducted in this study, it is proposed to build a traceability model in order to maintain and even improve the spun pile product quality in Indonesia. The approach used was the Neural Network of the perceptron model for weighing and will result in a defined traceability path in the context of reducing defects and even failed spun pile products. The simulation result showed that the model has been able to detect risky path possibilities to reduce product quality. The accumulation result of high-risk and medium-risk paths in this study showed that closer to product finalization, the risk will be higher. It is evident that when assessing Indicators, the order from the highest accumulation value first is Curing & Demolding and Stressing & Spinning at 29% each, Casting at 14%, Forming & Setting at 14%, and lastly Cutting & Heading at 14%. Regarding the risk assessment for activities, the first position is Curing & Demolding and Stressing & Spinning with 30% each, the second is Casting and Forming & Setting with 15% each, and the third is Cutting & Heading with 10%.
Copyright © by EnPress Publisher. All rights reserved.