Cucumber Variety ‘Drite L108’ (Cucumis sativus L. Cv. Derit L108) was selected as the test material. In the solar greenhouse, different days (1, 3, 5, 7, 9 d) of light (PAR < 200 µmol·m-2·s-1) and normal light conditions were designed with shading nets to observe the growth indexes of cucumber plants and the changes of antioxidant enzyme activities in leaves. The results showed that: (1) continuous low light increased the SPAD (relative chlorophyll) value of cucumber leaves and decreased the net photosynthetic rate. The longer the continuous low light days are, the smaller the net photosynthetic rate of cucumber leaves and the worse the photosynthetic recovery ability would be. (2) The plant height, stem diameter and leaf area per plant were lower than CK, and the above indexes could not return to the normal level after 9 days of normal light recovery; the yield and marketability of cucumber fruit decreased under continuous low illumination. (3) The activities of SOD (superoxide dismutase) and POD (peroxidase) in cucumber leaves increased, the activities of CAT (catalase) first increased and then decreased, and the content of MDA (malondialdehyde) continued to increase. The longer the days of continuous light keep, the more seriously the cucumber leaves were damaged by membrane lipid peroxidation. After continuous light for more than 7 days, the metabolic function of cucumber leaves was difficult to recover to the normal level.
It has become commonplace to describe publicly provided infrastructure as being in a sorry state and to advance public-private partnership as a possible remedy. This essay adopts a skeptical but not a cynical posture toward those claims. The paper starts by reviewing the comparative properties of markets and politics within a theory of budgeting where the options are construction and maintenance. This analytical point of departure explains how incongruities between political and market action can favor construction over maintenance. In short, political entities can engage in an implicit form of public debt by reducing maintenance spending to support other budgetary items. This implicit form of public debt does not manifest in higher interest rates but rather manifests in crumbling bridges and other infrastructure due to the transfer of maintenance into other budgetary activities.
This study examines conditions that impact PPP delivery success or failure in the roadways sector in India using Qualitative Comparative Analysis. QCA is well-suited for problems where multiple factors combine to create pathways leading to an outcome. Past investigations have compared PPP and non-PPP project delivery performance, but this study examines performance within PPPs by uncovering a set of conditions that combine to influence the success or failure road PPP project delivery in India. Based on data from 21 cases, pathways explaining project delivery success or failure were identified. Specifically, PPPs with high concessionaire equity investment and low regional industrial activity led to project delivery success. Projects with lower concessionaire equity investment and low reliance on toll revenue and with either: (a) high project technical complexity or (b) high regional industrial activity, led to project delivery failure. The pathways identified did not have coverage values that they were extremely strong. Coverage strength was hindered by lack of access to information on additional conditions that could be configurationally important. Further, certain characteristics of the Indian market limit generalization. Identification of combinations of conditions leading to PPP project delivery success or failure improves knowledge of the impacts of structure and characteristics of these complex arrangements. This study is one of the first to use fuzzy QCA to understand project delivery success/failure in road PPP projects. Moreover, this study takes into account factors specific to a sector and delivery mode to explain project delivery performance.
Copyright © by EnPress Publisher. All rights reserved.