There is a large literature on public-private-partnership, covering many different areas and aspects. This article deals with a specific but important aspect: the decision-making mechanisms to choose the management of PPP enterprises. In this sector, a suitable choice of managers is of particular importance because the persons chosen must balance the public and private interests. This is often difficult to achieve. Two new procedures are discussed, “Directed Random Choice” and “Rotating CEOs”. In each case, the advantages and disadvantages of the procedure of choosing the managers of PPP enterprises are discussed and evaluated. It is concluded that the two novel mechanisms should be seriously considered when choosing the managers of PPP enterprises.
To increase inter-region connectivity, the Indonesian government initiated infrastructure projects such as toll roads, airport, highways, as well as agriculture ones throughout the countries. One of the big projects in road infrastructure was the Cikampek–Palimanan (Cipali) toll road in West Java with a budget of more than USD1 billion which started to operate in July 2015. This paper is aimed to evaluate the impact of the toll road on accessibilities, trades, and investments in the region it traverses. To carry out the analysis, we used qualitative approach, difference-in-difference approach, and ANOVA, utilizing three kinds of data. The first data is collected from a survey of 331 small-medium enterprises (SMEs) in the logistics and the hotel and restaurant industries. The second one is bank loan data sourced from Bank Indonesia, while the third one is investment data from Investment Coordinating Board of Indonesia (BKPM).
After two years of its operation, Cipali toll road has increased accessibility, mobility, trade, and investment in the region it traverses. The travel time was reduced by 39%, while the cargo volume of the local businesses increased by 30% to 40%. These led to an improvement of wholesale trade volume in almost all regencies. However, SMEs in the hotel and restaurant industry along the traditional northern coastal highway in Subang, Indramayu, and Brebes experienced a decline due to the traffic shifting. Meanwhile, investments from national companies especially those of labor-intensive manufacturing industries flowed significantly especially to Subang and Majalengka, which reflected a “sorting effect”. However, investments from local and foreign businesses did not increase significantly yet after 2.5 years of toll operation.
To reap the benefit from the presence of Cipali toll road, the local governments should improve the ease of doing business to attract investments that boost employment in return. In addition, given a better accessibility from Greater Jakarta and a large number of potential visitors passing through the toll road, local businesses in the trade sector would benefit if they could promote the local attractions such as in tourism activities supported by the local government. The latter strategy should also be implemented by the local governments and local businesses in the northern coastal traditional route to minimize the negative impact of the toll road due to the traffic shifting. This strategy should be strengthened through increasing connectivity from the toll exits to local business areas and through increasing the ease of doing business.
The objective of the present study is to observe the surface morphology, structure and elemental composition of the ash particles produced from some thermal power stations of India using scanning electron microscopy (SEM) and energy dispersive X-ray analysis (EDXA). This information is useful to better understand the ash particles before deciding its utility in varied areas.
The cross wire projection welding of wires (Al 5182, = 4 mm) performed using the conventional (i.e. pneumatic) electrode force system was subjected to thorough numerical analysis. Calculations were performed until one of adopted boundary conditions, i.e., maximum welding time, maximum penetration of wires, the occurrence of expulsion or the exceeding of the temperature limit in the contact between the electrode and the welded material was obtained. It was observed that the ring weld was formed within the entire range of welding parameters. The process of welding was subjected to optimisation through the application of a new electromechanical electrode force system and the use of a special hybrid algorithm of electrode force and/or displacement control. Comparative numerical calculations were performed (using SORPAS software) for both electrode force systems. Technological welding tests were performed using inverter welding machines (1 kHz) provided with various electrode force systems. The research also involved the performance of metallographic and strength (peeling) tests as well as measurements of welding process characteristic parameters (welding current and voltage).
The welding process optimisation involving the use of the electromechanical force system and the application of the hybrid algorithm of force control resulted in i) more favourable space distribution of welding power, ii) energy concentration in the central zone of the weld, iii) favourable (desired) melting of the material within the entire weld transcrystallisation zone and iv) obtainment of a full weld nugget.
Copyright © by EnPress Publisher. All rights reserved.