This study explores the primary drivers influencing sustainable project management (SPM) practices in the construction industry. This research study seeks to determine whether firms are primarily motivated by external pressures or internal values when embracing SPM practices. In doing so, this study contributes to the ongoing discourse on SPM drivers by considering coercive pressures (CP), ethical responsibility (ER), and green transformational leadership (GTL) as critical enablers facilitating a firm’s adoption of SPM practices. Based on data from 196 project management practitioners in Pakistan, structural equation modeling (PLS-SEM) was employed to test the hypothesized relationships. Results highlight that CP influences the management of sustainability practices in construction projects, signifying firms’ concern for securing legitimacy from various institutional actors. As an ‘intrinsic value’, ER emerges as a significant motivator for ecological stewardship, driven by a genuine commitment to promoting sustainable development. This study also unveils the significant moderating effect of GTL on the association among CP, ER, and SPM. Lastly, the results of IMPA reveal that ER slightly performs better than CP as it helps firms internalize the essence of sustainability. This research study expands our understanding of SPM drivers in construction projects by exploring the differential impact of external pressures and the firm’s intrinsic values. These findings provide valuable insights for policymakers and practitioners, aiding them in promoting SPM to attain sustainable development goals.
eGovernment projects are capital intensive and have high probability of failure because of the dynamic and technological laden environment in which they operate. The number of skilled labour and technicalities required are often not available in quantity needed to sustain such project. There is always the need to have in place adequate risk assessment framework to guide the execution and monitoring of eGovernment projects. Several studies have been conducted on the critical success factors relating to risk assessment of eGovernment projects to understand the reasons for the high rate of failure. Therefore, there is need to review these articles and categorize them into different research domain in project risk assessment so as to reveal domain with more or less research and those that need to understand the future research directions in risk assessment for eGovernment projects. Using the positivism paradigm, this study utilized the Systematic Literature Review methodology to collect 147 articles from the following academic databases namely IEEE, Preprints, WorldCat Discovery, ArXiv. Ohio-state University databases, Science Direct, Scopus, ACM, NWU digital library, Usenix, Jise database, Sagepub, MDPI Academia published between 2013 to 2023. Different inclusion and exclusion criteria were applied pruning to 48 articles that were used for the study. The results show the classification of articles in risk assessment for eGovernment projects into those that discusses project analysis, review, framework, maturity and model tools, implementation, and integration, applied methodology and evaluation with the percentage of articles published in each domain with the past 10 years. The various critical success factors that should be considered in the development of a robust risk assessment framework were discussed and future research directions in eGovernment risk assessment were given based on the reviews.
The digitalization of the construction industry is deemed a crucial element in Construction 4.0’s vision, attainable through the implementation of digital twinning. It is perceived as a virtual strategy to surmount the constraints linked with traditional construction projects, thereby augmenting their productivity and effectiveness. However, the neglect to investigate the causal relationship between implementation and construction project management performance has resulted from a lack of understanding and awareness regarding the consequences of digital twinning implementation, combined with a shortage of expertise among construction professionals. Consequently, this paper extensively explores the relationship between digital twinning implementation and construction project management performance. The Innovation Diffusion Theory (IDT) is employed to investigate this relationship, utilizing a quantitative research approach through document analysis and questionnaire surveys. Additionally, partial least squares structural equation modeling (PLS-SEM) with SmartPLS software is employed to deduce the relationship. The results underscore that digital twinning implementation significantly improves construction project management performance. Despite recognizing various challenges in digital twinning implementation, when regarded as moderating factors, these challenges do not significantly impact the established causal relationship. Therefore, this investigation aligns with the national push toward the digitalization of the construction sector, highlighting the positive impacts of digital twinning implementation on construction project management performance. Moreover, this study details the impacts of implementing digital twinning from the construction industry’s perspective, including positive and negative impacts. Afterwards, this paper addresses the existing research gap, providing a more precise understanding and awareness among construction industry participants, particularly in developing nations.
Throughout the course of a project cycle, the many phases of project management—including planning, execution, control and monitoring, and ending—are integrated and executed. In modern firms, project management has become the dominant tool for managing change. Best practices have emerged due to global project management practices and company evolution. The primary goal was to investigate how project management approaches affected project performance of the Saudi Arabia Small and Medium Sized Enterprises (SMEs). This study investigated the impact of various project management practices including risk management, communication, leadership, and stakeholder management, on project performance in manufacturing SMEs in Riyadh, Saudi Arabia. A quantitative research methodology was employed, with data collected from 250 employees (i.e., supply chain, finance and R&D managers/supervisors) across 8 SMEs. The results revealed that risk management, leadership practices, and stakeholder management significantly contribute to project performance. Surprisingly, no significant relationship was found between communication practices and project performance. The findings of this study emphasize the importance of effective risk management, strong leadership, and efficient stakeholder management in achieving successful project outcomes. Finance managers and R&D managers in Saudi manufacturing SMEs should lead and engage stakeholders to improve project performance. Supply chain managers must manage risk and maintain stakeholder relationships to avoid disruptions. Communication improvements, despite their small impact, are essential for departmental coordination. Global project management strategies tailored to local culture and business will improve project success.
The research is focused on the evolution of the enterprises, in the field of specialized professional services, medium-period, enterprises that implemented projects financed within Regional Operational Program (ROP) during the 2007–2013 financial programming period. The analysis of the economic performance of the micro-enterprises corresponds to general objectives, but there can be outlined connections between these performances and other economic indicators that were not considered or followed through the financing program. The study case is focused on the development of micro-enterprises in the services area, in the Central Region, Romania (one of the eight development regions in Romania). The scientific approach for this article was based on a regressive statistical analysis. The analysis included the economic parameters for the enterprises selected, comparing the economic efficiency of these enterprises, during implementation with the economic efficiency after the implementation of the projects, during medium periods, including the sustainability period. The purpose of the research was to analyse the economic efficiency of the selected micro-enterprises, after finalizing the projects’ implementation. The authors intend to point out the need for a managerial instrument based on the economic efficiency of companies that are benefiting from non-reimbursable funds. This instrument should be taken into consideration in planning regional development at the national level, regarding the conditions and results expected. Although the authors used regressive statistical analysis the purpose was to prove that there is a need for additional managerial instruments when the financial allocations are being designed at the regional level. This study follows the interest of the authors in proving that the efficiency of non-reimbursable funds should be analysed distinctively on the activity sectors.
This study aims to develop a robust prioritization model for municipal projects in the Holy Metropolitan Municipality (Makkah) to address the challenges of aligning short-term and long-term objectives. The research explores How multi-criteria decision-making (MCDM) techniques can prioritize municipal projects effectively while ensuring alignment with strategic goals and local needs. The methodology employs the analytic hierarchy process (AHP) and exploratory factor analysis (EFA) to ensure methodological rigor and data adequacy. Data were collected from key stakeholders, including municipal planners and community representatives, to enhance transparency and reliability. The model’s validity was assessed through latent factor analysis, confirming the relevance of identified criteria and factors. Results indicate that flood prevention projects are the highest priority (0.4246), followed by road projects (0.3532), park construction (0.1026), utility projects (0.0776), and digital transformation (0.0416). The study highlights that certain factors are critical for evaluating and prioritizing municipal projects. “Capacity and Demand” emerged as the most influential factor (0.5643), followed by “Strategic Alignment” (0.2013), “Project Interdependence” (0.1088), “Increasing Investment” (0.0950), and “Risk” (0.0306). These findings are significant as they offer a structured, data-driven approach to decision-making aligned with Saudi Vision 2030. The proposed model optimizes resource allocation and project selection, representing a pioneering effort to develop the first prioritization framework specifically tailored to Makkah’s unique municipal needs. Notably, this is the first study to establish a prioritization method specifically for Makkah’s municipal projects, providing valuable contributions to the field.
Copyright © by EnPress Publisher. All rights reserved.