This paper aims to explain the administrative and the Environmental, Social and Governance (ESG) of the Indonesian Spaceport Project in Biak, Papua, Indonesia, under the Public-Private Partnerships (PPP) scheme, particularly from the protest to fear of environmental damage and traditional rights. This paper analyzes the factors that cause the local society’s reluctance to accept the development of Indonesia’s very first commercial spaceport. This paper uses a doctrinal methodology, which examines changes in the trend of ESG in implementing PPP projects. The method used is a qualitative systematic review of national and international studies. This paper finds that the lack of legal certainty for administrative and ESG as the main factor contributing to the pitfall of the PPP project in Biak Papua. No clear Government Contracting Agency (GCA), plus the fact that the Indonesian government puts too much weight on business consideration in PPP while Papuan people need more ESG, especially considering the historical conflict in the region, has been the epicenter of the problem. Given the ESG-PPP regulatory failure of spaceport development in Biak, more focused studies using comparative study methodology are needed to propose a more robust and customized ESG in PPP regulations in a politically and historically sensitive area. The authors forward a regulatory reform to balance administration, ESG, and business considerations in PPP projects for a spaceport.
Due to the lack of clear regulation of management accounting at the state level in Russia, the authors conducted a study based on an analysis of information sources, an expert survey on their reliability, and a case method, which resulted in a reporting form compiled for the production process of an agro-industrial enterprise (grain products) as part of inter-organizational company cooperation. The developed management reporting system (composed of eight consecutive stages: standard reports, specialized reports, itemized query reports, notification reports, statistical reports, prognostic reports, modeling results reports, and process optimization reports), on one hand, allows solving a set of tasks to increase the competitiveness of Russian agro-industrial enterprises within the framework of inter-organizational management accounting. On the other hand, the introduction of ESG principles into the management reporting system (calculation of the environmental (E) index, which assesses the company’s impact on the natural ecosystem and covers emissions and efficient use of natural resources in the agricultural production process) increases the level of control and minimizes the risks of an unfair approach of individual partners to environmental issues.
The US Infrastructure Investment and Job Act (IIJA), also commonly referred to as the Bipartisan Infrastructure Bill, passed in 2021, has drawn international attention. It aims to help to rebuild US infrastructure, including transportation networks, broadband, water, power and energy, environmental protection and public works projects. An estimated $1.2 trillion in total funding over ten years will be allocated. The Bipartisan Infrastructure Bill is the largest funding bill for US infrastructure in the recent history of the United States. This review article will specifically discuss funding allocations for roads and bridges, power and grids, broadband, water infrastructure, airports, environmental protection, ports, Western water infrastructure, electric vehicle charging stations and electric school buses in the new spending of the Infrastructure Investment and Job Act and why these investments are urgently necessary. This article will also briefly discuss the views of think tank experts, the public policy perspectives, the impact on domestic and global arenas of the new spending in the IIJA, and the public policy implications.
The characteristics of agricultural products are influenced by the ecosystem, from the perspective of biotic and abiotic factors, which produce in the plant physiological responses and in turn in the fruit unique physicochemical properties, which are the basis for designations of origin and strategies to add value to the product in the current market. In the present work, ten cocoa materials (Theobroma cacao L.) were selected for their outstanding productivity (FSV41, FLE3, FEAR5, FSA12, FEC2, SCC23, SCC80, SCC55, ICS95 and CCN51), which were established in the departments of Santander (931 m a.s.l.), Huila (931 m a.s.l.), Huila (931 m a.s.l.), Huila (931 m a.s.l.), Huila (931 m a.s.l.), Huila (931 m a.s.l.) and Huila (931 m a.s.l.). These were established in the departments of Santander (931 m a.s.l.), Huila (885 m a.s.l.) and Arauca (204 m a.s.l.), the main cocoa-producing areas in Colombia. For the evaluation of the physical characteristics of the collected materials, 21 quantitative descriptors were used to determine the physical variability of the fruit according to clone and place of collection. The data collected were analyzed by means of Pearson’s correlation matrix and principal component analysis, it was possible to identify those descriptors that contribute most to the variability among materials (ear index, diameter length ratio, seed weight and diameter, and fruit weight and length). In addition, it was possible to verify the effect of the place of harvest on the physical characteristics of the materials, high-lighting the importance of the adaptation study prior to the planting of the cocoa material, with the objective of guaranteeing a premium, productive and quality cocoa crop for the industry, which is competitive in the market.
Copyright © by EnPress Publisher. All rights reserved.