Delay is the leading challenge in completing Engineering, Procurement, and Construction (EPC) projects. Delay can cause excess costs, which reduces company profits. The relationship between subcontractors and the main contractor is a critical factor that can support the success of an EPC project. The problematic financial condition of the main contractor can cause delay in payments to subcontractors. This research will set a model that combines the system dynamics and earned value method to describe the impact of subcontractor advance payments on project performance. The system dynamics method is used to model and analyze the impact of interactions between variables affecting project performance, while the earned value method is applied to quantitatively evaluate project performance and forecast schedule and cost outcomes. These two methods are used complementarily to achieve a holistic understanding of project dynamics and to optimize decision-making. The designed model selects the optimum scenario for project time and costs. The developed model comprises project performance, costs, cash flow, and performance forecasting sub-models. The novelty in this research is a new model for optimizing project implementation time and costs, adding payment rate variables to subcontractors and subcontractor performance rates. The designed model can provide additional information to assist project managers in making decisions.
The present paper discusses the case of the Madrid Nuevo Norte Project (MNNP) in order to examine the relation of this mega-project with the city’s sustainable development. For this reason, the study used a qualitative approach using semi-structural interviews with experts (Madrid’s town hall, Madrid State, and the program management office and other external) that relayed strongly with MNNP. The expert panel requirements are split in six expertise areas: sustainability, urban development, urban planning, government or public affairs, project management or Madrid Nuevo Norte (MNN) key stakeholders. The study highlighted the vital importance of MNNP as a flagship sustainable project for the rest of Europe, that meets sustainability criteria for contributing substantially in the improvement of the quality of life of final users and for the community in general. For instance, it contributes to the regeneration of the city’s degraded area, to the interconnection of an isolated part of the city and public transportation connection, improving the external image of Madrid. Despite of it, there are some challenges that should be carefully managed such as applying sustainable solutions from other cities not properly tailored to Madrid, housing pricing accessibility increase due to the lack of terrain in Madrid and the politization of the project as discussion topic between local parties. In this context, local authorities should give particular emphasis in complying with the principles of sustainability for improving the overall performance of MNNP, ensuring social justice and prosperity for the people of Madrid.
This paper provides a comprehensive review of equity trading simulators, focusing on their performance in assuring pre-trade compliance and portfolio investment management. A systematic search was conducted that covered the period of January 2000 to May 2023 and used keywords related to equity trade simulators, portfolio management, pre-trade compliance, online trading, and artificial intelligence. Studies demonstrating the use of simulators and online platforms specific to portfolio investment management, written in English, and matching the specified query were included. Abstracts, commentaries, editorials, and studies unrelated to finance and investments were excluded. The data extraction process included data related to challenges in modern portfolio trading, online stock trading strategies, the utilization of deep learning, the features of equity trade simulators, and examples of equity trade simulators. A total of 32 studies were included in the systematic review and were approved for qualitative analysis. The challenges identified for portfolio trading included the subjective nature of the inputs, variations in the return distributions, the complexity of blending different investments, considerations of liquidity, trading illiquid securities, optimal portfolio execution, clustering and classification, the handling of special trading days, the real-time pricing of derivatives, and transaction cost models (TCMs). Portfolio optimization techniques have evolved to maximize portfolio returns and minimize risk through optimal asset allocation. Equity trade simulators have become vital tools for portfolio managers, enabling them to assess investment strategies, ensure pre-trade compliance, and mitigate risks. Through simulations, portfolio managers can test investment scenarios, identify potential hazards, and improve their decision-making process.
This paper uses Public Choice analysis to examine the case for and experience with Public-Private Partnerships (PPPs). A PPP is a contractual platform which connects a governmental body and a private entity. The goal is to provide a public sector program, service, or asset that would normally be provided exclusively by a public sector entity. This paper focuses on PPPs in developed countries, but it also draws on studies of PPPs in developing countries. The economics literature generally defines PPPs as long-term contractual arrangements between a public authority (local or central government) and a private supplier for the delivery of services. The private sector supplier takes responsibility for building infrastructure components, securing financing of the investment, and then managing and maintaining this facility.
However, in addition to those formed through contracts, PPPs may take other forms such as those developed in response to tax subvention or coercion, as in the case of regulatory mandates. A key element of PPP is that the private partner takes on a significant portion of the risk through a schedule of specified remuneration, contingency payments, and provision for dispute resolution. PPPs typically are long-term arrangements and involve large corporations on the private side, but may also be limited to specific phases of a project.
The types of PPPs discussed in this paper exclude arrangements which may result from government mandates such as the statutory emission mandates imposed on automobile manufacturers and industrial facilities (e.g., power plants). It also excludes PPP-like organizations resulting from US section 501(c)(3) of the Internal Revenue Code, which provides tax subsidies for certain public charities, scientific research organizations, and organizations whose goals are to prevent cruelty to animals or erect public monuments at no expense to the government. This paper concludes that an array of Public Choice tools are applicable to understanding the emergence, success, or failure of PPPs. Several short case studies are provided to illustrate the practicalities of PPPs.
This work shows the results of the biosynthesis of silver nanoparticles using the microalga Chlorella sp, using growth media with different concentrations of glycerol, between 5%–20%, and different light and temperature conditions. The synthesis of nanoparticles was studied using supernatants and pellets from autotrophic, heterotrophic and mixotrophic cultures of the microalga. The presence of nanoparticles was verified by ultraviolet-visible spectroscopy and the samples showing the highest concentration of nanoparticles were characterized by scanning electron microscopy. The mixotrophic growth conditions favored the excretion of exopolymers that enhanced the reduction of silver and thus the formation of nanoparticles. The nanoparticles obtained presented predominantly ellipsoidal shape with dimensions of 108 nm × 156 nm and 87 nm × 123 nm for the reductions carried out with the supernatants of the mixotrophic cultures with 5% and 10% glycerol, respectively.
Copyright © by EnPress Publisher. All rights reserved.