Nothofagus pumilio forests constitute the most economically important forest stand in southern Argentina and Chile. Total volume stocking and volumetric yield vary according to site quality, degree of occupation, growth stage and forest history of the stand. The objective of this work was to evaluate the stocking and the productive potential in quantity and quality of products for the sawmilling industry, using three harvesting systems (short logs, long logs and complete shafts) in the protection cut of a N. pumilio forest of site quality III in Tierra del Fuego (Argentina). The trials were conducted in an irregular mature forest with two strata and abundant regeneration (3.0 ha; RDI 93.8–113.4%). Total volumes varied between 726.5 and 850.3 m3∙ha-1, with a volume/basal area ratio of 11.8 to 12.1 m3∙m-2. The harvesting rates obtained were: 45.5% for complete logs, 21.3% for long logs and 22.4% for short logs. A model was used to estimate the timber volume for each system, where full shafts resulted in a significant increase in timber volume. Considering new alternatives in the planning of harvesting in forest management for N. pumilio forests, such as the system of complete shafts, allows obtaining higher harvesting rates, increasing the benefits for the forestry company and minimizing the damage to the forest, due to the shorter distance of the machinery in the forest harvesting.
Using a newly-developed data set for Portugal, we analyze the industry-level effects of infrastructure investment. Focusing on the divide between traded and non-traded industries, we find that infrastructure investments have a non-traded bias, as these shift the industry mix towards private and public services. We also find that the industries that benefit the most in relative terms are all non-traded: construction, trade, and real estate, among the private services, and education and health, among the public services. Similarly, emerging trading sectors, such as hospitality and professional services, stand to gain. The positive impacts on traded industries are too small to make a difference. These results highlight that infrastructure-based strategies are not neutral in terms of the industry mix. Moreover, with most of the benefits accruing to non-traded industries, such a development model that is heavily based on domestic demand may be unsustainable in light of Portugal’s current foreign account position.
While there has been much discussion about the large infrastructure needs in Asia and the Pacific, less attention has been paid to public expenditure efficiency in infrastructure services delivery. New constructions are not the only solution, especially when governments have limited capital to invest. Globally, new infrastructure projects face delays and cost overruns, leading to an inefficient use of public resources. The root causes include the lack of transparency in project selection, the lack of project preparation, the silo approach by public entities in assessing feasibility studies, and the lack of public sector capacity to fully develop a bankable pipeline of projects. To tackle these issues, governments need a smarter investment approach and to do so, enhancing public service efficiency is very crucial. The paper suggests a “whole life cycle” (WLC) approach as the main strategic solution for the discussed issues and challenges. We expand the definition of WLC to include the entire life cycle of the infrastructure asset from need identification to its disposal. The stages comprise planning, preparation, procurement, design, construction, operation and maintenance, and disposal. This is because we believe any efficient or inefficient decision throughout such a wide life cycle influences the quality of public services. Hence, in this holistic approach, infrastructure life cycle consists of four phases: planning, preparation, procurement, and implementation. Governments could enhance public efficiency and thus improve access to finance throughout the WLC by several solutions. These are (i) preparing infrastructure master plan and pipelines and long-term budgeting during the planning phase; (ii) establishing framework and guidelines and improving governance during preparation phase; (iii) promoting standardization, transparency, open government, and contractual consistency during the procurement phase; and finally (iv) continued role of government and total asset management during the implementation phase. In addition to these phase-specific means, key WLC solutions include proper use of technology, capacity building, and private participation in general and public-private partnership (PPP) in particular.
Developing Asia’s infrastructure gap results from both inadequate public resources and a lack of effective channels to mobilize private resources toward desired outcomes. The public-private partnership (PPP) mechanism has evolved to fill the infrastructure gap. However, PPP projects are often at risk of becoming distressed, or worst, being terminated because of the long-term nature of contracts and the many different stakeholders involved. This paper applies survival-time hazard analysis to estimate how project-related, macroeconomic, and institutional factors affect the hazard rate of the projects. Empirical results show that government’s provision of guarantees, involvement of multilateral development banks, and existence of a dedicated PPP unit are important for a project’s success. Privately initiated proposals should be regulated and undergo competitive bidding to reduce the hazard rate of the project and the corresponding burden to the government. Economic growth leads to successful project outcomes. Improved legal and institutional environment can ensure PPP success.
This paper argues for a novel approach to financing infrastructure needs in Arab countries. It first describes the context of rising public debt in the region, contrasting it with the vast infrastructure needs. It then discusses the challenges in meeting these needs with traditional financing. The paper then makes the case for maximizing finance for development by using public-private partnerships and presents a few successful examples in Arab countries. Finally, the paper explores the way forward and concludes on the need for strong state capacity and integrity to promote the “maximizing finance for development” approach.
The project finance scenario has changed significantly around the world after the 2008 financial crisis and following the subsequent Basel III recommendations. Project finance loans from commercial banks and financial institutions have largely dried up, leaving it mostly to the export credit agencies and the bilateral and multilateral development banks to provide the institutional credit. Unfortunately, those sources are not enough, given the huge needs for construction of new infrastructure and renovation of the old ones across Asia, Africa and Latin America. The need for capital markets, through market listed financial products across asset class, unlocking a large part of domestic and corporate savings, has never been felt as strongly before. This article seeks to analyze the development story of various Asian capital markets and examine financial products, which have succeeded in their short history in receiving investor interest. The article also delves into the challenges to market development, policy imperatives and the issues relating to market liquidity and credit rating, which are the most significant influencers for public market float and investor interest.
Copyright © by EnPress Publisher. All rights reserved.