The construction of gas plants often experiences delays caused by various factors, which can lead to significant financial and operational losses. This research aims to develop an accurate risk model to improve the schedule performance of gas plant projects. The model uses Quantitative Risk Analysis (QRA) and Monte Carlo simulation methods to identify and measure the risks that most significantly impact project schedule performance. A comprehensive literature review was conducted to identify the risk variables that may cause delays. The risk model, pre-simulation modeling, result analysis, and expert validation were all developed using a Focused Group Discussion (FGD). Primavera Risk Analysis (PRA) software was used to perform Monte Carlo simulations. The simulation output provides information on probability distribution, histograms, descriptive statistics, sensitivity analysis, and graphical results that aid in better understanding and decision-making regarding project risks. The research results show that the simulated project completion timeline after mitigation suggested an acceleration of 61–65 days compared to the findings of the baseline simulation. This demonstrates that activity-based mitigation has a major influence on improving schedule performance. This research makes a significant contribution to addressing project delay issues by introducing an innovative and effective risk model. The model empowers project teams to proactively identify, measure, and mitigate risks, thereby improving project schedule performance and delivering more successful projects.
The porous carbon/Ni nanoparticle composite was prepared by a freeze-drying method using NaCl as the template. It was applied in the effect of the concentration, adsorption time, and temperature of adsorption on the adsorption behavior. The kinetic model and the adsorption isothermic fitting results show that the adsorption behavior fits with the pseudo-secondary dynamics and the Langmuir isothermal model, indicating that the adsorption process is monolayer adsorption. Thermodynamic results indicate that the adsorption process is spontaneous physicochemical adsorption. The fitting showed that the porous carbon/Ni nanoparticle composites reach 217.17 mg·g-1, at 313 K indicates good adsorption for Congo red.
This paper aims to investigate the factors of competitive success and examine the relationship between Strategic Management Accounting, management accounting information systems and sustainability performance. This research was conducted with a quantitative approach. The survey involved 125 managers of 4- and 5-star hotels in Bali, Indonesia, a research sample of 154 managers was determined to be given a research questionnaire. Analysis of research data was carried out through Structural Equation Modeling. The results showed that strategic management accounting and Information Management Accounting System had a positive effect on sustainability performance. MAS information also mediates the relationship between strategic management accounting and sustainability performance which can involve a variety of factors. This study only focuses on competitive strategy and MAS information variables, so further research is needed on the sustainability performance of the hospitality industry. The positive relationship between strategic management accounting and social and environmental performance supports the argument that hotels use socio-environmental aspects for their strategic management accounting. Hotel managers also need government regulations and information related to social and environmental issues such as the Indonesian occupational health and safety management system and the Indonesia Green Hotel Award.
The rapidly growing construction industry often deals with complex and dynamic projects that pose significant safety risks. One of the state-owned companies in Indonesia is engaged in large-scale toll road construction projects with a high incidence of workplace accidents. This study aims to improve safety performance in toll road construction by implementing the Scrum framework. The study uses a System Dynamics approach to model interactions between the Scrum framework, project management, and work safety subsystems. Various scenarios were designed by modifying controlled variables and system structures, including introducing a punishment entity. These scenarios were evaluated based on their impact on reducing incidents and the incident rate over the project period. The results indicate that the combined scenario significantly reduces incidents and incident rates in different conditions. The study also finds a strong relationship between Scrum framework implementation and improved safety performance, demonstrating a reduction in incidents and incident rates by over 50% compared to existing conditions. This research underlines the effectiveness of the Scrum framework in enhancing safety in construction projects.
Copyright © by EnPress Publisher. All rights reserved.