In order to promote the application of noise map in high-speed railway noise management, the high-speed railway noise map drawing technology based on the combination of noise prediction model and geographic information system (GIS) is studied. Firstly, according to the distribution characteristics of noise sources and line structure characteristics of high-speed railway, the prediction model of multi equivalent sound sources and the calculation method of sound barrier insertion loss of high-speed railway are optimized; secondly, a three-dimensional geographic information model of a high-speed railway is built in GIS software, and the railway noise prediction technology based on the model is developed again; then, the noise of discrete nodes is calculated, and the continuous noise distribution map is drawn by spatial interpolation. The research results show that the comparison error between the noise map of a high-speed railway drawn by this technology and the measured results is less than 1 dB (A), which verifies the accuracy and practicality of the high-speed railway noise map, and can be used as a reference for the railway noise management department to formulate noise control countermeasures.
There is a large literature on public-private-partnership, covering many different areas and aspects. This article deals with a specific but important aspect: the decision-making mechanisms to choose the management of PPP enterprises. In this sector, a suitable choice of managers is of particular importance because the persons chosen must balance the public and private interests. This is often difficult to achieve. Two new procedures are discussed, “Directed Random Choice” and “Rotating CEOs”. In each case, the advantages and disadvantages of the procedure of choosing the managers of PPP enterprises are discussed and evaluated. It is concluded that the two novel mechanisms should be seriously considered when choosing the managers of PPP enterprises.
In order to study the temperature change trend of the surrounding geotechnical soil during the operation and thermal recovery of the medium-deep geothermal buried pipe and the influence of the geotechnical soil on the operational stability of the vertical buried pipe after thermal recovery. Based on the data of geological stratum in Guanzhong area and the actual engineering application of medium-deep geothermal buried pipe heating system in Xi’an New Area, the influence law of medium-deep geothermal buried pipe heat exchanger on surrounding geotechnical soil is simulated and analyzed by FLUENT software. The results show that: after four months of heating operation, in the upper layer of the geotechnical soil, the reverse heat exchange zone appears due to the higher fluid temperature; in the lower layer of the geotechnical soil, the temperature decreases more with the increase of depth and shows a linear increase in the depth direction; without considering the groundwater seepage, after eight months of thermal recovery of the geotechnical soil after heating, the maximum temperature difference after recovery is 3.02 ℃, and the average temperature difference after recovery is 1.30 ℃ The maximum temperature difference after recovery was 3.02 ℃ and the average temperature difference after recovery was 1.30 ℃. The geotechnical thermal recovery temperature difference has no significant effect on the long-term operation of the buried pipe, and it can be operated continuously and stably for a long time. Practice shows that due to the influence of various factors such as stratigraphic structure, stratigraphic pressure, radioactive decay and stratigraphic thermal conductivity, the actual stratigraphic temperature below 2000m recovers rapidly without significant temperature decay, fully reflecting the characteristics of the Earth’s constant temperature body.
Digital labor, as a new theoretical form of "audience commodity theory" in the digital media era, represents a new form of production and labor. This paper explores the unique features of digital labor in labor form, labor products and labor time, and combining Marx's theory, it further reveals the alienation and exploitation of human social relations, emotional value and social class in the process of digital labor, and finally makes suggestions on the unequal relationship between platform and workers in the process of digital labor.
This paper uses Public Choice analysis to examine the case for and experience with Public-Private Partnerships (PPPs). A PPP is a contractual platform which connects a governmental body and a private entity. The goal is to provide a public sector program, service, or asset that would normally be provided exclusively by a public sector entity. This paper focuses on PPPs in developed countries, but it also draws on studies of PPPs in developing countries. The economics literature generally defines PPPs as long-term contractual arrangements between a public authority (local or central government) and a private supplier for the delivery of services. The private sector supplier takes responsibility for building infrastructure components, securing financing of the investment, and then managing and maintaining this facility.
However, in addition to those formed through contracts, PPPs may take other forms such as those developed in response to tax subvention or coercion, as in the case of regulatory mandates. A key element of PPP is that the private partner takes on a significant portion of the risk through a schedule of specified remuneration, contingency payments, and provision for dispute resolution. PPPs typically are long-term arrangements and involve large corporations on the private side, but may also be limited to specific phases of a project.
The types of PPPs discussed in this paper exclude arrangements which may result from government mandates such as the statutory emission mandates imposed on automobile manufacturers and industrial facilities (e.g., power plants). It also excludes PPP-like organizations resulting from US section 501(c)(3) of the Internal Revenue Code, which provides tax subsidies for certain public charities, scientific research organizations, and organizations whose goals are to prevent cruelty to animals or erect public monuments at no expense to the government. This paper concludes that an array of Public Choice tools are applicable to understanding the emergence, success, or failure of PPPs. Several short case studies are provided to illustrate the practicalities of PPPs.
Polymers obtained from renewable sources are gaining popularity over their petroleum based counter parts in recent years due to their capability to address the environmental pollution related concerns emanating from the widespread usage of synthetic polymers. Even though the polymers from renewable sources are attractive in an environmental point of view, some of the property limitations and the high cost of these materials pose limitations for their extensive commercial applications. These aspects opened the door for a large chunk of research activities in development of polyblends and composites containing polymers from renewable sources as one of the components. Poly (lactic acid) (PLA) is one of the most discussed and commercialized polymer originated from renewable resources. Even though it has many useful properties, certain disadvantages like high brittleness, low impact resistance etc. limit the wide spread commercialization of PLA. In this review article, the recent research activities which are aimed to fill this gap by various modifications of PLA are discussed with special emphasis on the latest research advancements in the field of biodegradable and non biodegradable systems containing PLA.
Copyright © by EnPress Publisher. All rights reserved.