Projects implemented under life cycle contracts have become increasingly common in recent years to ensure the quality of construction and maintenance of energy infrastructure facilities. A key parameter for energy facility construction projects implemented under life cycle contracts is their duration and deadlines. Therefore, the systematic identification, monitoring, and comprehensive assessment of risks affecting the timing of work on the design and construction is an urgent practical task. The purpose of this work is to study the strength of the influence of various risks on the duration of a project implemented on the terms of a life cycle contract. The use of the expert assessment method allows for identifying the most likely risks for the design and construction phases, as well as determining the ranges of deviations from the baseline indicator. Using the obtained expert evaluations, a model reflecting the range and the most probable duration of the design and construction works under the influence of risk events was built by the Monte-Carlo statistical method. The results obtained allow monitoring and promptly detecting deviations in the actual duration of work from the basic deadlines set in the life cycle contract. This will give an opportunity to accurately respond to emerging risks and build a mutually beneficial relationship between the parties to life cycle contracts.
The present paper discusses the case of the Madrid Nuevo Norte Project (MNNP) in order to examine the relation of this mega-project with the city’s sustainable development. For this reason, the study used a qualitative approach using semi-structural interviews with experts (Madrid’s town hall, Madrid State, and the program management office and other external) that relayed strongly with MNNP. The expert panel requirements are split in six expertise areas: sustainability, urban development, urban planning, government or public affairs, project management or Madrid Nuevo Norte (MNN) key stakeholders. The study highlighted the vital importance of MNNP as a flagship sustainable project for the rest of Europe, that meets sustainability criteria for contributing substantially in the improvement of the quality of life of final users and for the community in general. For instance, it contributes to the regeneration of the city’s degraded area, to the interconnection of an isolated part of the city and public transportation connection, improving the external image of Madrid. Despite of it, there are some challenges that should be carefully managed such as applying sustainable solutions from other cities not properly tailored to Madrid, housing pricing accessibility increase due to the lack of terrain in Madrid and the politization of the project as discussion topic between local parties. In this context, local authorities should give particular emphasis in complying with the principles of sustainability for improving the overall performance of MNNP, ensuring social justice and prosperity for the people of Madrid.
The US Infrastructure Investment and Job Act (IIJA), also commonly referred to as the Bipartisan Infrastructure Bill, passed in 2021, has drawn international attention. It aims to help to rebuild US infrastructure, including transportation networks, broadband, water, power and energy, environmental protection and public works projects. An estimated $1.2 trillion in total funding over ten years will be allocated. The Bipartisan Infrastructure Bill is the largest funding bill for US infrastructure in the recent history of the United States. This review article will specifically discuss funding allocations for roads and bridges, power and grids, broadband, water infrastructure, airports, environmental protection, ports, Western water infrastructure, electric vehicle charging stations and electric school buses in the new spending of the Infrastructure Investment and Job Act and why these investments are urgently necessary. This article will also briefly discuss the views of think tank experts, the public policy perspectives, the impact on domestic and global arenas of the new spending in the IIJA, and the public policy implications.
Developing Asia’s infrastructure gap results from both inadequate public resources and a lack of effective channels to mobilize private resources toward desired outcomes. The public-private partnership (PPP) mechanism has evolved to fill the infrastructure gap. However, PPP projects are often at risk of becoming distressed, or worst, being terminated because of the long-term nature of contracts and the many different stakeholders involved. This paper applies survival-time hazard analysis to estimate how project-related, macroeconomic, and institutional factors affect the hazard rate of the projects. Empirical results show that government’s provision of guarantees, involvement of multilateral development banks, and existence of a dedicated PPP unit are important for a project’s success. Privately initiated proposals should be regulated and undergo competitive bidding to reduce the hazard rate of the project and the corresponding burden to the government. Economic growth leads to successful project outcomes. Improved legal and institutional environment can ensure PPP success.
Copyright © by EnPress Publisher. All rights reserved.