This study sought an innovative quality management framework for Chinese Prefabricated Buildings (PB) projects. The framework combines TQM, QSP, Reconstruction Engineering, Six Sigma (6Σ), Quality Cost Management, and Quality Diagnosis Theories. A quantitative assessment of a representative sample of Chinese PB projects and advanced statistical analysis using Structural Equation Modeling supported the framework, indicating an excellent model fit (CFI = 0.92, TLI = 0.90, RMSEA = 0.06). The study significantly advances quality management and industrialized building techniques, but it also emphasizes the necessity for ongoing research, innovation, and information exchange to address the changing problems and opportunities in this dynamic area. In addition, this study’s findings and recommendations can help construction stakeholders improve quality performance, reduce construction workload and cost, minimize defects, boost customer satisfaction, boost productivity and efficiency in PB projects, and boost the Chinese construction industry’s growth and competitiveness.
This study aims to develop a robust prioritization model for municipal projects in the Holy Metropolitan Municipality (Makkah) to address the challenges of aligning short-term and long-term objectives. The research explores How multi-criteria decision-making (MCDM) techniques can prioritize municipal projects effectively while ensuring alignment with strategic goals and local needs. The methodology employs the analytic hierarchy process (AHP) and exploratory factor analysis (EFA) to ensure methodological rigor and data adequacy. Data were collected from key stakeholders, including municipal planners and community representatives, to enhance transparency and reliability. The model’s validity was assessed through latent factor analysis, confirming the relevance of identified criteria and factors. Results indicate that flood prevention projects are the highest priority (0.4246), followed by road projects (0.3532), park construction (0.1026), utility projects (0.0776), and digital transformation (0.0416). The study highlights that certain factors are critical for evaluating and prioritizing municipal projects. “Capacity and Demand” emerged as the most influential factor (0.5643), followed by “Strategic Alignment” (0.2013), “Project Interdependence” (0.1088), “Increasing Investment” (0.0950), and “Risk” (0.0306). These findings are significant as they offer a structured, data-driven approach to decision-making aligned with Saudi Vision 2030. The proposed model optimizes resource allocation and project selection, representing a pioneering effort to develop the first prioritization framework specifically tailored to Makkah’s unique municipal needs. Notably, this is the first study to establish a prioritization method specifically for Makkah’s municipal projects, providing valuable contributions to the field.
Coordination and integration among farms within agri-food chains are crucial to tackle the issue of fragmentation within the primary sector, both at the European and national level. The Italian agri-food system still complains about the need to aggregate supply to support market dynamics, especially for niche and quality products that characterize the Made in Italy. It is well known that the Italian agri-food sector is closely linked to the relationship between agriculture on one hand and culture/tradition on the other, which is reflected in the high number of quality products that have obtained EU PDO (Protected Designation of Origin) and PGI (Protected Geographical Indication) recognition. The development of vertical forms of coordination has found significant support in recent years from the integrated supply chain design approach, which is increasingly becoming an essential tool for implementing rural development policies. In this context, the study provides a comparison between companies that have joined the Integrated Supply Chain Projects of the Rural Development Program and those that have not applied. The aim is to highlight any differences in order to understand policy impact. The analysis is based on the Emilia-Romagna region Farm Accountancy Data Network (FADN) data, and the sample consists of more than 2 thousand farms. The statistical analysis conducted compares treated and non-treated using the Welch-t-test for independent unmatched samples. The main results show higher values for treated farms when structural variables are analyzed, like the utilized agricultural area or the agricultural work unit. In general, higher balance sheet performances emerged for treated farms. In conclusion, this study shows that the Integrated Supply Chain Projects represent a worthwhile tool both to increase cooperation, food quality, and to enhance a competitive agricultural sector.
The interest in using project management office (PMO) services in organizations to manage their construction projects is growing in light of rising economic, technological, and social developments based on their ability to achieve organizational goals while avoiding risks. Accordingly, organizations use PMO services to manage their technical and financial project issues to periodically evaluate PMO performance and services in a scientific, practical, and measurable way to ensure successful project path via PMO. Therefore, this research aims to develop a performance evaluation system that enables organizations to follow up and evaluate the PMO performance to ensure that PMO manages the organizations’ expectations and goals successfully according to certain quality, scope, and cost. The study builds on significant findings in PMO competence indexes as evaluation matrix, which includes five basic categories with 136 indexes covering the project life cycle. The matrix was developed based on literature analysis and supplemented with experts’ interviews in construction management. The developed robust competency-based index (RCI) for directive PMO supports the organizations to conduct client satisfaction, correction, or partial/total change of the PMO’s competence flow within five construction project life cycle and process, i.e. governance, portfolio, information, execution, and contract issues.
Most airport development projects entail disputes due to the features that are distinctive and complicated. Disputes can be minimized through creative problem-solving by implementing knowledge management practices into the system. This study investigates the direct influence of knowledge management (KM) on dispute minimization (DM) along with the key factors for developing a strategy that can enhance KM success. A mixed method was adopted including statistical data analysis based on the PLS-SEM and descriptive analysis with the SECI (Socialization, Externalization, Combination, Internalization) model approach for strategy development. These findings show that KM has a positive and significant direct influence on DM, while the factors that are considered to have a significant influence on KM success are human resources management (HR) and learning & training (LT) on airport development projects in state-owned airport companies. This research supports the importance of a well-developed HR system accompanied by regular LT to all members of the organization to optimize and encourage the spread of knowledge in the organization.
Copyright © by EnPress Publisher. All rights reserved.