This paper reviews the emerging potential of mid-tier transit, articulating how a complex set of established and new factors could contribute both to better transit outcomes and the associated urban regeneration around station precincts. The analysis is based on two structured literature reviews, supported by insights from the authors’ original research. The first provides an overview of the established and new rationale for mid-tier technologies such as the established Light Rail Transit (LRT) and Bus Rapid Transit (BRT) as well as the new Trackless Tram Systems (TTS). The established role for mid-tier transit is now being given extra reasons for it to be a major focus of urban infrastructure especially due to the need for net zero cities. The second review, is a detailed consideration of established and new factors that can potentially improve patronage on mid-tier transit. The established factors of urban precinct design like stop amenities and improved accessibility and density around stations, are combined with new smart technology systems like advanced intelligent transport systems and real-time transport information for travellers, as well as new transport technologies such as micro-mobility and Mobility on Demand. Also explored are new processes with funding and development models that properly leverage land value capture, public private partnerships, and other entrepreneurial development approaches that are still largely not mainstreamed. All were found to potentially work, especially if done together, to help cities move into greater mid-tier transit.
Increasingly, U.S. cities are focusing on transit-oriented development (TOD) policies to expand the stock of higher-density, mixed-use development near public transit stations within the context of a transit corridor and, in most cases, a regional metropolis. A TOD zone relies on a regulatory and institutional environment, public and private participation and investment, and development incentives to create vibrant, people-oriented communities and mobility options and to support business development. TODs provide local governments with more tax revenues due to increased property values (and, as applicable, income and sales tax revenues), but most planning for TODs ignores the non-transit infrastructure costs of increasing development density. This study focused on determining the water and sewer infrastructure costs for TOD zones along a rail line in southeast Florida. The finding was that millions of dollars in funds are needed to meet those water and sewer needs and that few are currently planned as a part of community capital improvement programs.
Forest transition is a trend change process from decreasing to increasing forest area in a country or region. Since the 1990s, ecological and environmental problems such as climate change and loss of biodiversity have received constant attention. The research theory and method of forest transformation has gradually become the frontier and hot topic pursued by international academic circle. With forest transformation as the theme, on the basis of introducing the origin of forest transformation research, along the development vein and internal logic of forest transformation research, this paper reviews the research progress of forest transition theory from the perspectives of Kuznets curve of forest environment and forest transition path, and summarizes the major issues in forest transformation research. The main direction of future research is proposed, including the impact of economic globalization on forest transition, the refinement of research units and the analysis of forest quality transition.
In this study, the development of rinnenkarren systems is analyzed. During the field studies, 36 rinnenkarren systems were investigated. The width and depth were measured at every 10 cm on the main channels and then shape was calculated to these places (the quotient of channel width and depth). Water flow was performed on artificial rinnenkarren system. A relation was looked for between the density of tributary channels and the average shape of the main channel, between the distance of tributary channels from each other and the shape of a given place of the main channel. The density and total length of the tributary channels on the lower and upper sections of the main channels being narrow at their lower end (11 pieces) and being wide at their lower end (10 pieces) of the rinnenkarren systems were calculated as well as their average proportional distance from the lower end of the main channel. The number of channel hollows was determined on the lower and upper sections of these main channels. It can be stated that the average shape of the main channel calculated to its total length depends on the density of the tributary channels and on the distance of tributary channels from each other. The main channel shape is smaller if less water flows on the floor for a long time because of the small density of the tributary channels and the great distance between the tributary channels. In this case, the channel deepens, but it does not widen. The width of the main channel depends on the number and location of the rivulets developing on channel-free relief. The main channel becomes narrow towards its lower end if the tributary rivulets are denser and longer on the upper part of the main rivulet developing on the channel-free, plain terrain and their distance is larger compared to the lower end. The channel hollows develop mainly at those places where the later developing tributary channels are hanging above the floor of the main channel. Thus, the former ones are younger than the latter ones. It can be stated that the morphology of the main channels (shape, channel hollows, and width changes of the main channel) is determined by the tributary channels (their number, location and age).
This paper uses Public Choice analysis to examine the case for and experience with Public-Private Partnerships (PPPs). A PPP is a contractual platform which connects a governmental body and a private entity. The goal is to provide a public sector program, service, or asset that would normally be provided exclusively by a public sector entity. This paper focuses on PPPs in developed countries, but it also draws on studies of PPPs in developing countries. The economics literature generally defines PPPs as long-term contractual arrangements between a public authority (local or central government) and a private supplier for the delivery of services. The private sector supplier takes responsibility for building infrastructure components, securing financing of the investment, and then managing and maintaining this facility.
However, in addition to those formed through contracts, PPPs may take other forms such as those developed in response to tax subvention or coercion, as in the case of regulatory mandates. A key element of PPP is that the private partner takes on a significant portion of the risk through a schedule of specified remuneration, contingency payments, and provision for dispute resolution. PPPs typically are long-term arrangements and involve large corporations on the private side, but may also be limited to specific phases of a project.
The types of PPPs discussed in this paper exclude arrangements which may result from government mandates such as the statutory emission mandates imposed on automobile manufacturers and industrial facilities (e.g., power plants). It also excludes PPP-like organizations resulting from US section 501(c)(3) of the Internal Revenue Code, which provides tax subsidies for certain public charities, scientific research organizations, and organizations whose goals are to prevent cruelty to animals or erect public monuments at no expense to the government. This paper concludes that an array of Public Choice tools are applicable to understanding the emergence, success, or failure of PPPs. Several short case studies are provided to illustrate the practicalities of PPPs.
Copyright © by EnPress Publisher. All rights reserved.