Developing Asia’s infrastructure gap results from both inadequate public resources and a lack of effective channels to mobilize private resources toward desired outcomes. The public-private partnership (PPP) mechanism has evolved to fill the infrastructure gap. However, PPP projects are often at risk of becoming distressed, or worst, being terminated because of the long-term nature of contracts and the many different stakeholders involved. This paper applies survival-time hazard analysis to estimate how project-related, macroeconomic, and institutional factors affect the hazard rate of the projects. Empirical results show that government’s provision of guarantees, involvement of multilateral development banks, and existence of a dedicated PPP unit are important for a project’s success. Privately initiated proposals should be regulated and undergo competitive bidding to reduce the hazard rate of the project and the corresponding burden to the government. Economic growth leads to successful project outcomes. Improved legal and institutional environment can ensure PPP success.
This paper argues for a novel approach to financing infrastructure needs in Arab countries. It first describes the context of rising public debt in the region, contrasting it with the vast infrastructure needs. It then discusses the challenges in meeting these needs with traditional financing. The paper then makes the case for maximizing finance for development by using public-private partnerships and presents a few successful examples in Arab countries. Finally, the paper explores the way forward and concludes on the need for strong state capacity and integrity to promote the “maximizing finance for development” approach.
Nothofagus pumilio forests constitute the most economically important forest stand in southern Argentina and Chile. Total volume stocking and volumetric yield vary according to site quality, degree of occupation, growth stage and forest history of the stand. The objective of this work was to evaluate the stocking and the productive potential in quantity and quality of products for the sawmilling industry, using three harvesting systems (short logs, long logs and complete shafts) in the protection cut of a N. pumilio forest of site quality III in Tierra del Fuego (Argentina). The trials were conducted in an irregular mature forest with two strata and abundant regeneration (3.0 ha; RDI 93.8–113.4%). Total volumes varied between 726.5 and 850.3 m3∙ha-1, with a volume/basal area ratio of 11.8 to 12.1 m3∙m-2. The harvesting rates obtained were: 45.5% for complete logs, 21.3% for long logs and 22.4% for short logs. A model was used to estimate the timber volume for each system, where full shafts resulted in a significant increase in timber volume. Considering new alternatives in the planning of harvesting in forest management for N. pumilio forests, such as the system of complete shafts, allows obtaining higher harvesting rates, increasing the benefits for the forestry company and minimizing the damage to the forest, due to the shorter distance of the machinery in the forest harvesting.
The market demand for uniformity and productivity of commercial carrot roots has prioritized hybrid materials over open-pollinated varieties. In this sense, the objective of this work was to estimate the combining ability of carrot genitors for root productivity and resistance to leaf scorch. The experiments were conducted in Gama, DF, in the agricultural years 2012/13 and 2013/14. We evaluated 33 carrot hybrids, originated from crosses between three male-sterile populations, with 11 male-fertile S2 lines, all the genitors being of tropical origin. At 90 days after sowing, the severity of the leaf blight disease was estimated in the plots. At 100 days after sowing, harvesting was performed and root yield characters were evaluated. Analysis of variance and partial diallel analysis were performed for each year and jointly for both years. It was found that additive and non-additive genes are important in the manifestation of root yield and leaf blight resistance traits in carrot hybrids. The male-sterile parents with higher overall combining ability for root productivity are strains LM-649 and LM-650 and, among the male-fertile, strain LM-555-2-2. The best hybrids for root yield and leaf blight resistance are LM-649 × LM-555-11-1, LM-650 × LM-555-7-1 and LM-650 × LM-554-8-1.
Public-Private Partnerships (PPPs) can be an effective way of delivering infrastructure. However, achieving value for money can be difficult if government agencies are not equipped to manage them effectively. Experience from OECD countries shows that the availability of finance is not the main obstacle in delivering infrastructure. Governance—effective decision-making—is the most influential aspect on the quality of an investment, including PPP investments. In 2012, the OECD together with its member countries developed principles to ensure that PPPs deliver value for money transparently and prudently, supported by the right institutional capacities and processes to harness the upside of PPPs without jeopardizing fiscal sustainability. Survey results from OECD countries show that some dimensions of the recommended practices are well applied and past and ongoing reforms show progress. However, other principles have not been well implemented, reflecting the continuing need for improving public governance of PPPs across countries.
Starting from the ‘90s, there has been a significant increase in PPP use in the public sector in Europe, benefiting the implementation of infrastructure projects. In Italy, PPP is still much more limited than in such countries as the UK and France: the projects funded are smaller and the sectors involved are less appropriate. Based on the economic literature, European initiatives and international comparisons, the paper examines aspects of regulations that could encourage the appropriate use of PPP and considers the problems with the Italian regulations, while proposing some corrective measures. The main limitations involve: i) the absence of adequate preliminary assessments about the advantages of using PPP rather than the traditional procurement, ii) the relative lack of attention to the contract terms, iii) inadequate safeguards to ensure the bankability of the projects, and iv) limited information transparency and accessibility.
Copyright © by EnPress Publisher. All rights reserved.