While there has been much discussion about the large infrastructure needs in Asia and the Pacific, less attention has been paid to public expenditure efficiency in infrastructure services delivery. New constructions are not the only solution, especially when governments have limited capital to invest. Globally, new infrastructure projects face delays and cost overruns, leading to an inefficient use of public resources. The root causes include the lack of transparency in project selection, the lack of project preparation, the silo approach by public entities in assessing feasibility studies, and the lack of public sector capacity to fully develop a bankable pipeline of projects. To tackle these issues, governments need a smarter investment approach and to do so, enhancing public service efficiency is very crucial. The paper suggests a “whole life cycle” (WLC) approach as the main strategic solution for the discussed issues and challenges. We expand the definition of WLC to include the entire life cycle of the infrastructure asset from need identification to its disposal. The stages comprise planning, preparation, procurement, design, construction, operation and maintenance, and disposal. This is because we believe any efficient or inefficient decision throughout such a wide life cycle influences the quality of public services. Hence, in this holistic approach, infrastructure life cycle consists of four phases: planning, preparation, procurement, and implementation. Governments could enhance public efficiency and thus improve access to finance throughout the WLC by several solutions. These are (i) preparing infrastructure master plan and pipelines and long-term budgeting during the planning phase; (ii) establishing framework and guidelines and improving governance during preparation phase; (iii) promoting standardization, transparency, open government, and contractual consistency during the procurement phase; and finally (iv) continued role of government and total asset management during the implementation phase. In addition to these phase-specific means, key WLC solutions include proper use of technology, capacity building, and private participation in general and public-private partnership (PPP) in particular.
In this policy insight, the author lays out the context of the BRI and its role in global development. He also explains why the US should consider working with China on the BRI. The author opines on China’s possible approach and strategy to get global private investors to come on board for the massive BRI projects. He suggests that the global players can establish a third-party market cooperation and coordination mechanism to turn the BRI into a platform for win-win global collaboration.
The CO2 heat pump air conditioning system of new energy vehicle is designed, and the vehicle model of CO2 heat pump module and heat management system is established based on KULI simulation. The effects of refrigerant charge, running time and compressor speed on the heat pump air conditioning system is studied, and the energy consumption is compared with the PTC heating system and the CO2 heat pump air conditioning system without waste heat recovery. The results show that the optimal charge for full-service operation is 750 g; increasing the compressor speed can increase the cooling capacity, so that the refrigerant temperature in the passenger compartment and battery inlet can quickly reach the appropriate temperature, but the COP<sub>h</sub>, COP<sub>c</sub> are reduced by 2.5% and 1.8% respectively. By comparing it with PTC heating and CO2 heat pump air conditioning systems without waste heat recovery, it is found that the energy consumption of this system is only for the PTC heating systems 42.5%, without waste heat recovery carbon dioxide heat pump air conditioning system of 86.6%. It greatly saves energy, but also increased the waste heat recovery function, so that the system supply air temperature increased by 26%, improve passenger cabin comfort. This provides a reference for the future experimental research of CO2 heat pump air conditioning and heat management system.
Energy shortages and environmental damage have become serious problems facing the society today. Biomass can be a renewable energy source, which large-scale development and utilization are of great significance to industry and social life. Biomass pyrolysis technology can achieve effective utilization of biomass energy. It is necessary to optimize the pyrolysis reaction technology and device for realize the industrialization and large-scale production of biomass energy.
There is a large literature on public-private-partnership, covering many different areas and aspects. This article deals with a specific but important aspect: the decision-making mechanisms to choose the management of PPP enterprises. In this sector, a suitable choice of managers is of particular importance because the persons chosen must balance the public and private interests. This is often difficult to achieve. Two new procedures are discussed, “Directed Random Choice” and “Rotating CEOs”. In each case, the advantages and disadvantages of the procedure of choosing the managers of PPP enterprises are discussed and evaluated. It is concluded that the two novel mechanisms should be seriously considered when choosing the managers of PPP enterprises.
To analyze the effect of an increase in the quantity or quality of public investment on growth, this paper extends the World Bank’s Long-Term Growth Model (LTGM), by separating the total capital stock into public and private portions, with the former adjusted for its quality. The paper presents the LTGM public capital extension and accompanying freely downloadable Excel-based tool. It also constructs a new infrastructure efficiency index, by combining quality indicators for power, roads, and water as a cardinal measure of the quality of public capital in each country. In the model, public investment generates a larger boost to growth if existing stocks of public capital are low, or if public capital is particularly important in the production function. Through the lens of the model and utilizing newly-collated cross-country data, the paper presents three stylized facts and some related policy implications. First, the measured public capital stock is roughly constant as a share of gross domestic product (GDP) across income groups, which implies that the returns to new public investment, and its effect on growth, are roughly constant across development levels. Second, developing countries are relatively short of private capital, which means that private investment provides the largest boost to growth in low-income countries. Third, low-income countries have the lowest quality of public capital and the lowest efficient public capital stock as a share of GDP. Although this does not affect the returns to public investment, it means that improving the efficiency of public investment has a sizable effect on growth in low-income countries. Quantitatively, a permanent 1 ppt GDP increase in public investment boosts growth by around 0.1–0.2 ppts over the following few years (depending on the parameters), with the effect declining over time.
Copyright © by EnPress Publisher. All rights reserved.