Train Shunting Operation Plan for Detachment and Coupling
Fei Wang
International Journal of Mathematics and Systems Science 2024, 7(9); https://doi.org/10.18686/ijmss.v7i9.9724
Submitted:18 Oct 2024
Accepted:18 Oct 2024
Published:18 Oct 2024
Abstract
This paper focus on two study cases for shunting train stocks which are required to be broken by two sections. First the position of the pulling out of the train stock shall be confirmed before detaching, followed by breaking up carriages or train stock according to the destinations. Then locomotive back to the line where the train stock waiting and pull out the other carriages and break them up again. Finally, all the carriages are made up in order and ready for departure. Shunting list is used in the shunting operation to help railway working staff and locomotives to apply and check the lines. Shunting trip such as wagon coupling trips and wagon uncoupling trips are calculated in the shunting plan in both two study cases. In the end, the railway station is supposed to take the least shunting lines, least wagon coupling trip, least wagon uncoupling trip and least shunting working time to deal with the most shunting work.
References
[1] Peng Qiyuan, Wang Ciguang, Organisation of Train Operation, Chapter 1, The Theory and Methods of Shunting Work, 2006, p:25.
© 2025 by the EnPress Publisher, LLC. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.

Copyright © by EnPress Publisher. All rights reserved.

TOP