COVID-19 has amplified existing imbalances, institutional and financing constraints associated with a development strategy that did not take sufficient account of challenges with emissions, environmental damage and health risks associated with climate change in a number of countries, including China. The recovery from the pandemic can be combined with appropriately designed investments that take into account human, social, natural and physical capital, as well as distributional objectives, that can also address commitments under the Paris agreement. An important criterion for sustainable development is that the tax regimes at the national and sub-national levels should reflect the same criteria as the investment strategy. Own-source revenues, are essential to be able to access private financing, including local government bonds and PPPs in a sustainable manner. Governance criteria are also important including information on the buildup of liabilities at all levels of government, to ensure transparent governance.
Despite differences in political systems, the Chinese experiences are relevant in a wide range of emerging market countries as the measures utilize institutions and policies reflecting international best practices, including modern tax administrations for the VAT, and income taxes, and benefit-linked property taxes, as well as utilization of balance sheets information consistent with the IMF’s Government Financial Statistics Manual, 2014. The options have significant implications for policy advice and development cooperation for meeting global climate change goals while ensuring sustainable employment generation with transparency and accountability.
Developing Asia’s infrastructure gap results from both inadequate public resources and a lack of effective channels to mobilize private resources toward desired outcomes. The public-private partnership (PPP) mechanism has evolved to fill the infrastructure gap. However, PPP projects are often at risk of becoming distressed, or worst, being terminated because of the long-term nature of contracts and the many different stakeholders involved. This paper applies survival-time hazard analysis to estimate how project-related, macroeconomic, and institutional factors affect the hazard rate of the projects. Empirical results show that government’s provision of guarantees, involvement of multilateral development banks, and existence of a dedicated PPP unit are important for a project’s success. Privately initiated proposals should be regulated and undergo competitive bidding to reduce the hazard rate of the project and the corresponding burden to the government. Economic growth leads to successful project outcomes. Improved legal and institutional environment can ensure PPP success.
Preserving roads involves regularly evaluating government policy through advanced assessments using vehicles with specialized capabilities and high-resolution scanning technology. However, the cost is often not affordable due to a limited budget. Road surface surveys are highly expected to use low-cost tools and methods capable of being carried out comprehensively. This research aims to create a road damage detection application system by identifying and qualifying precisely the type of damage that occurs using a single CNN to detect objects in real time. Especially for the type of pothole, further analysis is to measure the volume or dimensions of the hole with a LiDAR smartphone. The study area is 38 province’s representative area in Indonesia. This research resulted in the iRodd (intelligent-road damage detection) for detection and classification per type of road damage in real-time object detection. Especially for the type of pothole damage, further analysis is carried out to obtain a damage volume calculation model and 3D visualization. The resulting iRodd model contributes in terms of completion (analyzing the parameters needed to be related to the road damage detection process), accuracy (precision), reliability (the level of reliability has high precision and is still within the limits of cost-effective), correct prediction (four-fifths of all positive objects that should be identified), efficient (object detection models strike a good balance between being able to recognize objects with high precision and being able to capture most objects that would otherwise be detected-high sensitivity), meanwhile, in the calculation of pothole volume, where the precision level is established according to the volume error value, comparing the derived data to the reference data with an average error of 5.35% with an RMSE value of 6.47 mm. The advanced iRodd model with LiDAR smartphone devices can present visualization and precision in efficiently calculating the volume of asphalt damage (potholes).
Public-private partnerships (PPPs) are vital for infrastructure development in developing countries, integrating private efficiency with public oversight. However, PPP models often face risks, particularly in Indonesia’s water sector, due to its unique geographical and regulatory challenges. This study aims to identify and evaluate risk factors specific to drinking water PPP projects in Indonesia. Using a quantitative approach, structured questionnaires were distributed to experts in the sector, and the data was analyzed using a fuzzy evaluation method. Risks were categorized into location, design and construction, financial, operational, revenue, and political. The study emphasizes that effective risk management, including identification, analysis, and mitigation, is essential for project success. It highlights the importance of stakeholder involvement and flexible risk management strategies. Comprehensive and proactive risk management is key to the success of drinking water infrastructure projects. The research suggests that an integrated and collaborative approach among stakeholders can enhance risk management effectiveness. These findings provide valuable insights for policymakers, project managers, investors, and other stakeholders, underscoring the necessity for adaptable regulatory frameworks and robust policy guidelines to improve the sustainability and efficacy of future water-related PPPs.
The reference urban plan is an urban planning tool often used to orient the development of Chadian cities. However, expanding Chadian urban centers, such as Sarh, face challenges in implementing urban planning orientations of their urban plans within the set deadlines. The objective of this study is to identify the factors impeding the effective implementation of the reference urban plan for Sarh town. The methodology employed encompasses a literature review, individual interviews with urban planning experts, geographic information system (GIS) data, household surveys and statistical analysis. The results revealed that less than a quarter (19.72%) of the households surveyed were aware of the reference urban plan. The applied logistic regression model identified age, occupation and level of education as the main factors influencing public participation in the preparation of the reference urban plan. On average, 33.33% of the urban planning guidelines and 21.74% of the projected urban projects were implemented, with a difference of 1631.28 hectares (ha) between the projected plan and the actual plan for the town. Five factors were identified as contributing to the failure to implement the reference urban plan for Sarh town, including low funding, inadequate land management, a lack of political will, weak governance and poor communication. Consequently, participatory and inclusive planning approaches, effective financial mobilisation, strong governance, and the use of modern technologies such as GIS tools are recommended to enhance the implementation of urban planning tools.
Copyright © by EnPress Publisher. All rights reserved.