The carbon footprint, which measures greenhouse gas emissions, is a good environmental indicator for choosing the best sustainable mode of transportation. The available emission factors depend heavily on the calculation methodology and are hardly comparable. The minimum and maximum scenarios are one way of making the results comparable. The best sustainable passenger transport modes between Rijeka and Split were investigated and compared by calculating the minimum and maximum available emission factors. The study aims to select the best sustainable mode of transport on the chosen route and to support the decision-making process regarding the electrification of the Lika railroad, which partially connects the two cities. In the minimum scenario, ferry transport without vehicles was the best choice when the transportation time factor was not relevant, and electric rail transport when it was. In the maximum scenario, the electric train and the ferry with vehicles were equally good choices. Road transportation between cities was not competitive at all. The comparison of the carbon footprint based on minimum and maximum scenarios gives a clear insight into the ratio of greenhouse gas emissions from vehicles in passenger transport. It supports the electrification of the Lika railroad as the best sustainable transport solution on the route studied.
This article discusses one of the problems of using digital technologies, namely the complexity of assessing the effectiveness of their implementation. Since the use of digital twins at the enterprises of the fuel and energy complex (FEC) has recently become relevant, the authors have chosen the digital twins technology for consideration in this article. For the successful implementation of digital technologies, the authors propose a system of evaluation indicators that will measure the effectiveness of Digital Twins implementation and determine the benefits obtained. The advantages of digital twins include improved management and monitoring, optimization of production processes, prediction of equipment failures, as well as reduced maintenance costs and increased overall efficiency of FEC systems. As a methodological basis for the study, authors use the system of balanced indicators proposed by R. Kaplan and D. Norton, which served as the basis for the development of a set of performance indicators of the fuel and energy complex enterprise with the introduction of digital twins. As a result of the study, a list of indicators for monitoring the effectiveness of digital twins implementation was determined. The study identifies performance indicators for digital twin implementation, with future research aimed at quantitative assessments. The enterprise can implement a digital twin system with a WACC of 10.99%, payback period of 8.06 years, IRR exceeding the discount rate by 9.07%, a 3.5% reduction in harmful emissions, and a 2.5% efficiency increase.
Catastrophes, like earthquakes, bring sudden and severe damage, causing fatalities, injuries, and property loss. This often triggers a rapid increase in insurance claims. These claims can encompass various types, such as life insurance claims for deaths, health insurance claims for injuries, and general insurance claims for property damage. For insurers offering multiple types of coverage, this surge in claims can pose a risk of financial losses or bankruptcy. One option for insurers is to transfer some of these risks to reinsurance companies. Reinsurance companies will assess the potential losses due to a catastrophe event, then issue catastrophe reinsurance contracts to insurance companies. This study aims to construct a valuation model for catastrophe reinsurance contracts that can cover claim losses arising from two types of insurance products. Valuation in this study is done using the Fundamental Theorem of Asset Pricing, which is the expected present value of the number of claims that occur during the reinsurance coverage period. The number of catastrophe events during the reinsurance coverage period is assumed to follow a Poisson process. Each impact of a catastrophe event, such as the number of fatalities and injuries that cause claims, is represented as random variables, and modeled using Peaks Over Threshold (POT). This study uses Clayton, Gumbel, and Frank copulas to describe various dependence characteristics between random variables. The parameters of the POT model and copula are estimated using Inference Functions for Margins method. After estimating the model parameters, Monte Carlo simulations are performed to obtain numerical solutions for the expected value of catastrophe reinsurance based on the Fundamental Theorem of Asset Pricing. The expected reinsurance value based on Monte Carlo simulations using Indonesian earthquake data from 1979–2021 is Rp 10,296,819,838.
This study aims to identify the risk factors causing the delay in the completion schedule and to determine an optimization strategy for more accurate completion schedule prediction. A validated questionnaire has been used to calculate a risk rating using the analytical hierarchy process (AHP) method, and a Monte Carlo simulation on @RISK 8.2 software was employed to obtain a more accurate prediction of project completion schedules. The study revealed that the dominant risk factors causing project delays are coordination with stakeholders and changes in the scope of work/design review. In addition, the project completion date was determined with a confidence level of 95%. All data used in this study were obtained directly from the case study of the Double-Double Track Development Project (Package A). The key result of this study is the optimization of a risk-based schedule forecast with a 95% confidence level, applicable directly to the scheduling of the Double-Double Track Development Project (Package A). This paper demonstrates the application of Monte Carlo Simulation using @RISK 8.2 software as a project management tool for predicting risk-based-project completion schedules.
This study proposes a fuzzy analytic hierarchy process (FAHP) method to support strategic decision-makers in choosing a project management research agenda. The analytical hierarchy process (AHP) model is the basic tool used in this study. It is a mathematical tool for evaluating decisions with multiple alternatives by decomposing them into successive levels according to their degree of importance. The Sustainable Development Goals (SDG) oriented theme of project management was chosen from among four themes that emerged from a strategic monitoring study. The FAHP method is an effective decision-making tool for multiple aspects of project management. It eliminates subjectivity and produces decisions based on consistent judgment.
Copyright © by EnPress Publisher. All rights reserved.