Adeleke, A. Q., Bahaudin, A. Y., Kamaruddeen, A. M. (2017). Organizational Internal Factors and Construction Risk Management among Nigerian Construction Companies. Global Business Review, 19(4), 921–938.
https://doi.org/10.1177/0972150916677460
Asiedu, R. O., Adaku, E. (2019). Cost overruns of public sector construction projects: a developing country perspective. International Journal of Managing Projects in Business, 13(1), 66–84.
https://doi.org/10.1108/ijmpb-09-2018-0177
Azolibe, C. B., Okonkwo, J. J. (2020). Infrastructure development and industrial sector productivity in Sub-Saharan Africa. Journal of Economics and Development, 22(1), 91–109.
https://doi.org/10.1108/jed-11-2019-0062
Babon-Ayeng, P., Oduro-Ofori, E., Owusu-Manu, D. G., et al. (2022). Socio-political factors underlying the adoption of green bond financing of infrastructure projects: the case of Ghana. Journal of Capital Markets Studies, 6(3), 304–319.
https://doi.org/10.1108/jcms-06-2022-0018
Bepari, M., Narkhede, B. E., Raut, R. D. (2022). A comparative study of project risk management with risk breakdown structure (RBS): a case of commercial construction in India. International Journal of Construction Management, 24(6), 673–682.
https://doi.org/10.1080/15623599.2022.2124657
Danisworo, B., Latief, Y. (2019). Estimation model of Jakarta MRT phase 1 project cost overrun for the risk based next phase project funding purpose. IOP Conference Series: Earth and Environmental Science, 258, 012049.
https://doi.org/10.1088/1755-1315/258/1/012049
Ebekozien, A., Aigbavboa, C., Samsurijan, M. S., et al. (2023). Moderating effect of Nigerian government policy support on the relationship between project management framework and emerging construction contractors’ sustainability. International Journal of Building Pathology and Adaptation, 41(6), 269–289.
https://doi.org/10.1108/ijbpa-01-2023-0007
Flyvbjerg, B. (2007). Policy and Planning for Large-Infrastructure Projects: Problems, Causes, Cures. Environment and Planning B: Planning and Design, 34(4), 578–597.
https://doi.org/10.1068/b32111
Flyvbjerg, B. (2014). What You Should Know About Megaprojects and Why: An Overview. Project Management Journal, 45(2), 6-19.
Flyvbjerg, B., Skamris holm, M. K., Buhl, S. L. (2003). How common and how large are cost overruns in transport infrastructure projects? Transport Reviews, 23(1), 71–88.
https://doi.org/10.1080/01441640309904
Gigerenzer, G., Krauss, S., Vitouch, O. (2004). The Null Ritual: What You Always Wanted to Know About Significance Testing but Were Afraid to Ask. In: The SAGE Handbook of Quantitative Methodology for the Social Sciences. SAGE. pp. 392–409.
https://doi.org/10.4135/9781412986311.n21
Handoko, J. R., Gondokusumo, O. (2019). Comparison of PERT and M-PERT scheduling for a construction project in Malang, Indonesia. IOP Conference Series: Materials Science and Engineering, 508, 012034.
https://doi.org/10.1088/1757-899x/508/1/012034
Hendradewa, A. P. (2019). Schedule Risk Analysis by Different Phases of Construction Project Using CPM-PERT and Monte-Carlo Simulation. IOP Conference Series: Materials Science and Engineering, 528(1), 012035.
https://doi.org/10.1088/1757-899x/528/1/012035
Hsiau, H. J., R. Lin, C. W. (2009). A fuzzy pert approach to evaluate plant construction project scheduling risk under uncertain resources capacity. Journal of Industrial Engineering and Management, 2(1).
https://doi.org/10.3926/jiem.2009.v2n1.p31-47
Ichsan, M., Isvara, W., Handibyanto, J. N., et al. (2024). Development of a risk-based strategy implementation of a full pre-financed contractor scheme (CPF) in toll road projects to improve time performance. Cogent Engineering, 11(1).
https://doi.org/10.1080/23311916.2024.2307212
Isang, I. W., Ebiloma, D. O. (2022). Challenges and strategies for sustainable project performance in the post-Covid era in Nigeria: a thematic analysis approach. Frontiers in Engineering and Built Environment, 3(1), 32–47.
https://doi.org/10.1108/febe-06-2022-0025
Isvara, W., Ichsan, M., Muhammad, F. A., et al. (2023). Strategy development of contractor with Contractor Full Pre-Finance (CPF) scheme using risk-based approach to increase cost performance of toll road development projects. Cogent Engineering, 10(1).
https://doi.org/10.1080/23311916.2023.2243718
Karunakaran, P., Abdullah, A. H., Nagapan, S., et al. (2018). Categorization of potential project cost overrun factors in construction industry. IOP Conference Series: Earth and Environmental Science, 140, 012098.
https://doi.org/10.1088/1755-1315/140/1/012098
Kassem, M. A., Khoiry, M. A., Hamzah, N. (2020). Structural modelling of internal risk factors for oil and gas construction projects. International Journal of Energy Sector Management, 14(5), 975–1000.
https://doi.org/10.1108/ijesm-11-2019-0022
Kehinda, O. M., Afolabi, O. J., Babawale, A. (2017). Application of Project Evaluation and Review Technique (PERT) in Road Construction Projects in Nigeria. European Project Management Journal, 7(2), 3-13.
https://doi.org/10.1300/J123v53n01_15
Kwon, H., Kang, C. W. (2018). Improving Project Budget Estimation Accuracy and Precision by Analyzing Reserves for Both Identified and Unidentified Risks. Project Management Journal, 50(1), 86–100.
https://doi.org/10.1177/8756972818810963
Lee, H. C., Lee, E. B., Alleman, D. (2018). Schedule Modeling to Estimate Typical Construction Durations and Areas of Risk for 1000 MW Ultra-Critical Coal-Fired Power Plants. Energies, 11(10), 2850.
https://doi.org/10.3390/en11102850
Lei, X. (2011). Assumption Analysis and Duration Simulation of Three-Point Estimate in PERT Technique. In: Proceedings of the 2011 International Conference on Computer and Management (CAMAN).
https://doi.org/10.1109/caman.2011.5778896
Liu, X., Shen, L., Zhang, K. (2021). Estimating the Probability Distribution of Construction Project Completion Times Based on Drum-Buffer-Rope Theory. Applied Sciences, 11(15), 7150.
https://doi.org/10.3390/app11157150
Manoharan, K., Dissanayake, P., Pathirana, C., et al. (2022). Labour-related factors affecting construction productivity in Sri Lankan building projects: perspectives of engineers and managers. Frontiers in Engineering and Built Environment, 2(4), 218–232.
https://doi.org/10.1108/febe-03-2022-0009
Mariana, Y., Wijaksono, S. (2021). Project Evaluation and Review Technique (PERT) Analysis in the renovation project of the Church of St. John the Evangelist, Jakarta. IOP Conference Series: Earth and Environmental Science, 794(1), 012188.
https://doi.org/10.1088/1755-1315/794/1/012188
Nemaa, Z. K., Aswed, G. K. (2021). Forecasting construction time for road projects and infrastructure using the fuzzy PERT method. IOP Conference Series: Materials Science and Engineering, 1076(1), 012123.
https://doi.org/10.1088/1757-899x/1076/1/012123
Project Management Institute. (2017). A Guide to Project Management Body of Knowledge, 6th ed. Project Management Institute, Inc.
Project Management Institute. (2019a). Practice Standard for Scheduling. Project Management Institute, Inc.
Project Management Institute. (2019b). The Standard for Risk Management. In Standard Practice.
Qazi, A., Shamayleh, A., El-Sayegh, S., et al. (2021). Prioritizing risks in sustainable construction projects using a risk matrix-based Monte Carlo Simulation approach. Sustainable Cities and Society, 65, 102576.
https://doi.org/10.1016/j.scs.2020.102576
US Department of the Navy. (1958). Summary Report: Program Evaluation Research Task (Issue 2). National Technical Information Service, Springfield.
Yoon, J., Yu, I. (2019). Estimating normal duration of renovation for multistory apartment building considering extension-type renovation projects. Journal of civil engineering and management, 25(2), 156–167.
https://doi.org/10.3846/jcem.2019.8024