Protein- and peptide-based medications are recognized for their effectiveness and lower toxicity compared to chemical-based drugs, making them promising therapeutic agents. However, their application has been limited by numerous delivery challenges. Polymeric nanostructures have emerged as effective tools for protein delivery due to their versatility and customizability. Polymers’ inherent adaptability makes them ideal for meeting the specific demands of protein-delivery systems. Various strategies have been employed, such as enzyme inhibitors, absorption enhancers, mucoadhesive polymers, and chemical modifications of proteins or peptides. This study explores the hurdles associated with protein and peptide transport, the use of polymeric nanocarriers (both natural and synthetic) to overcome these challenges, and the techniques for fabricating and characterizing nanoparticles.
This research examines three data mining approaches employing cost management datasets from 391 Thai contractor companies to investigate the predictive modeling of construction project failure with nine parameters. Artificial neural networks, naive bayes, and decision trees with attribute selection are some of the algorithms that were explored. In comparison to artificial neural network’s (91.33%) and naive bays’ (70.01%) accuracy rates, the decision trees with attribute selection demonstrated greater classification efficiency, registering an accuracy of 98.14%. Finally, the nine parameters include: 1) planning according to the current situation; 2) the company’s cost management strategy; 3) control and coordination from employees at different levels of the organization to survive on the basis of various uncertainties; 4) the importance of labor management factors; 5) the general status of the company, which has a significant effect on the project success; 6) the cost of procurement of the field office location; 7) the operational constraints and long-term safe work procedures; 8) the implementation of the construction system system piece by piece, using prefabricated parts; 9) dealing with the COVID-19 crisis, which is crucial for preventing project failure. The results show how advanced data mining approaches can improve cost estimation and prevent project failure, as well as how computational methods can enhance sustainability in the building industry. Although the results are encouraging, they also highlight issues including data asymmetry and the potential for overfitting in the decision tree model, necessitating careful consideration.
Despite the existence of a voluminous body of literature covering the impact of infrastructure public-private partnerships (PPPs) on public value within the context of Western countries, scant attention has been paid to this topic in the Middle East. Given that the region has hosted numerous PPP projects that were implemented even without the rudimentary legal and regulatory frameworks considered essential for such projects to succeed, a study of PPPs within that region would thus be particularly useful, since an unpacking of the success factors for PPPs in the Middle East can reveal important practical insights that will advance the knowledge of PPP success factors overall. This paper, therefore, explores the rehabilitation and expansion of Jordan’s Queen Alia International Airport via the PPP route. It finds that the factors contributing to the project’s successful implementation can be categorized into those on the macro level related to political support, and the micro level factors concerned with management of daily activities involved in the partnership between the public and private sectors.
This paper aims to explain the administrative and the Environmental, Social and Governance (ESG) of the Indonesian Spaceport Project in Biak, Papua, Indonesia, under the Public-Private Partnerships (PPP) scheme, particularly from the protest to fear of environmental damage and traditional rights. This paper analyzes the factors that cause the local society’s reluctance to accept the development of Indonesia’s very first commercial spaceport. This paper uses a doctrinal methodology, which examines changes in the trend of ESG in implementing PPP projects. The method used is a qualitative systematic review of national and international studies. This paper finds that the lack of legal certainty for administrative and ESG as the main factor contributing to the pitfall of the PPP project in Biak Papua. No clear Government Contracting Agency (GCA), plus the fact that the Indonesian government puts too much weight on business consideration in PPP while Papuan people need more ESG, especially considering the historical conflict in the region, has been the epicenter of the problem. Given the ESG-PPP regulatory failure of spaceport development in Biak, more focused studies using comparative study methodology are needed to propose a more robust and customized ESG in PPP regulations in a politically and historically sensitive area. The authors forward a regulatory reform to balance administration, ESG, and business considerations in PPP projects for a spaceport.
Copyright © by EnPress Publisher. All rights reserved.