Universal Health Coverage is a health insurance system that ensures every citizen in the population has equitable access to quality and effective promotive, preventive, curative, and rehabilitative health services. Meanwhile, the Medan City Government of Indonesia is trying to improve health services through the Medan Berkah Health Insurance Program by adopting Universal Health Coverage, which aims to provide Universal Health Coverage to the entire community. This study aims to explain the implementation and projection of the development of health services of the Medan City Government with the Universal Health Coverage System in the Medan Berkah Health Insurance Program which is intended as a step in providing opportunities for all people to get equal opportunities in health services, especially for the poor. This research uses qualitative research by using the literacy study method by studying related documents and conducting in-depth observations. Data analysis included data reduction, presentation, and conclusion drawing. The Medan City Government implemented the Universal Health Coverage Program in Jaminan Kesehatan Medan Berkah, which aims to improve health services in the city. The government is committed to simplifying the bureaucracy, managing the medical workforce, and collaborating with stakeholders and the community. However, challenges include low community participation, limited resources, lack of coordination, and limited access to information, which hinder the successful implementation of the program.
Urban mobility in Grand Lomé is affected by several negative externalities, including road congestion, insecurity and environmental pollution. Traffic jams cause considerable economic losses, estimated at more than 13,000 CFA francs per month for some public officials, and represent a financial drain of several million CFA francs per day on the Togolese economy. These challenges are accentuated by rapid urbanization and a dizzying increase in the number of vehicles, especially motorcycle taxis. These factors not only cause economic losses, but also to the deterioration of the quality of life of the inhabitants. On average, motorists lose up to 49.5 min per day in traffic jams, with fuel and time costs estimated at hundreds of thousands of CFA francs per year for each user of the main boulevards. Through an in-depth analysis of the impacts of these negative externalities on mobility and sustainable development, this study reveals that traffic congestion, combined with the lack of road infrastructure, generates considerable economic and environmental costs. These traffic jams also worsen air pollution, making the transport sector responsible for 80% of greenhouse gas emissions. These proposed solutions include: 1) The modernization of road infrastructure, culminating in the construction of new lanes entirely dedicated to public and non-motorized transport. 2) The regulation of motorcycle taxis, inspired by regional examples, to improve safety and efficiency. 3) The introduction of rapid transit systems, such as Bus Rapid Transit (BRT), to make travel more fluid. 4) The implementation of strict environmental standards and regular technical controls to reduce greenhouse gas emissions. These proposals aim to reduce social and economic costs, while promoting sustainable mobility and a better quality of life for residents.
Industrial zones require careful and meticulous planning because industry can have a major impact on the surrounding environment. The research location is the northern part of West Java Province which is a gold triangle area named Rebana Triangle Area. The purpose of this study is to measure the weight of the research variables in determining industrial zones from the results of fuzzy analytical hierarchy process (F-AHP) analysis, assessing the location of industrial zones in the research area based on important variables in determining industrial zones. The result of this study is the weight of the research variables in determining the industrial zone from the results of the fuzzy analytical hierarchy process (F-AHP) analysis obtained is the availability of electrical infrastructure with an influence weight of 15.00%. The second most influential factor is the availability of telecommunications infrastructure with an effect of 13.02%, the distance of land to roads and access of 11.76%, land use of 11.21%, distance of land to public facilities of 9.99%, labour cost work is 9.60%, the distance of land to the river is 8.19%, the price of land is 7.97%, the slope is 6.79%, and the type of soil is 6.43%. This GIS analysis model can be a reference model for the government in determining the potential of industrial zones in other regions in Indonesia. A total of 4822.41 Ha or the equivalent of 3.50% of the total area of 6 (six) regencies/cities research areas which are very suitable to be used as industrial zones. The district that has the largest area of potential industrial zone is Majalengka, while Cirebon does not have a location that has the potential for industrial zone locations. Based on the results of the analysis of 10 (ten) variables for determining industrial zones from expert opinion, a draft policy proposal for the government can be proposed, among others. These 10 (ten) variables are variables that are expected to be mandatory variables in planning and determining the location of potential industrial areas.
The territorial planning approach to allocating productive forces is based on the fact that territories have competitive advantages in producing specific products. However, in agriculture, the advantages principle cannot be used to shape the allocation patterns, due to a variety of intervening factors, such as the climatic and environmental conditions for agricultural production and the quality of land and availability of water. In the case of Russia, one of the most diverse countries in terms of the territorial disparities in agricultural production, this study examines the location and development patterns of the agricultural sector. The study identifies the competitive advantages of territories by comparing localization of agricultural production, production costs, performance, and profitability of agricultural producers, as well as prices of agricultural products in 78 different administrative regions in Russia. The study reveals which regions have more advantageous conditions for over-concentrating energy capacities, labor resources, fixed capital, and investments. However, at a certain point, over-concentrated production forces can lead to a deterioration in the performance of farmers due to an increase in capital intensity. Therefore, countries with significant regional differences in agricultural production should adjust their spatial development patterns according to the parameters of territories’ comparative advantages.
The Indonesian government is currently carrying out massive infrastructure development, with a budget exceeding 10. Risk mapping based on good risk management is crucial for stakeholders in organizing construction projects. Projects financed by government, whether solicited or unsolicited schemes, should also include risk mapping to add value and foster partnerships. Therefore, this study aimed to develop a risk management model for solicited and unsolicited projects, focusing on the collaborative management system among stakeholders in government-financed projects. Risk review was conducted from various stakeholders’ perspectives, examining the impacts and potential losses to manage uncertainty and reduce losses for relevant parties. Furthermore, qualitative analysis was conducted using Focus Group Discussion (FGD) and in-depth interviews. The results showed that partnering-based risk management with risk sharing in solicited and unsolicited projects had similarities with Integrated Project Delivery (IPD). This approach provided benefits and value by developing various innovations in the project life cycle.
The effective allocation of resources within police patrol departments is crucial for maintaining public safety and operational efficiency. Traditional methods often fail to account for uncertainties and variabilities in police operations, such as fluctuating crime rates and dynamic response requirements. This study introduces a fuzzy multi-state network (FMSN) model to evaluate the reliability of resource allocation in police patrol departments. The model captures the complexities and uncertainties of patrol operations using fuzzy logic, providing a nuanced assessment of system reliability. Virtual data were generated to simulate various patrol scenarios. The model’s performance was analyzed under different configurations and parameter settings. Results show that resource sharing and redundancy significantly enhance system reliability. Sensitivity analysis highlights critical factors affecting reliability, offering valuable insights for optimizing resource management strategies in police organizations. This research provides a robust framework for improving the effectiveness and efficiency of police patrol operations under conditions of uncertainty.
Copyright © by EnPress Publisher. All rights reserved.