Dredging and reclamation operations are pivotal aspects of coastal engineering and land development. Within these tasks lie potential hazards for personnel operating dredging machinery and working within reclamation zones. Due to the specialized nature of the work environment, which deviates from conventional workplace settings, the risk of workplace accidents is significantly heightened. The aim of this study is to conduct a comprehensive risk analysis of the safety aspects related to dredging and reclamation activities, with the goal of enhancing safety and minimizing the frequency and severity of potential dangers. This research comprises a thorough risk analysis, integrating meticulous hazard identification from sample projects and literature reviews. It involves risk assessment by gathering insights from experts with direct working experience and aims to assess potential risks. The study focuses on defining effective risk management strategies, exemplified through a case study of a nearshore construction project in Thailand. The study identified numerous high and very high-risk factors in the assessment and analysis of occupational safety in dredging and reclamation work. Consequently, a targeted response was implemented to control and mitigate these risks to an acceptable level. The outcome of this study will provide a significant contribution to the advancement of guidelines and best practices for improving the safety of dredging and reclamation operations.
Public-private partnerships (PPPs) are vital for infrastructure development in developing countries, integrating private efficiency with public oversight. However, PPP models often face risks, particularly in Indonesia’s water sector, due to its unique geographical and regulatory challenges. This study aims to identify and evaluate risk factors specific to drinking water PPP projects in Indonesia. Using a quantitative approach, structured questionnaires were distributed to experts in the sector, and the data was analyzed using a fuzzy evaluation method. Risks were categorized into location, design and construction, financial, operational, revenue, and political. The study emphasizes that effective risk management, including identification, analysis, and mitigation, is essential for project success. It highlights the importance of stakeholder involvement and flexible risk management strategies. Comprehensive and proactive risk management is key to the success of drinking water infrastructure projects. The research suggests that an integrated and collaborative approach among stakeholders can enhance risk management effectiveness. These findings provide valuable insights for policymakers, project managers, investors, and other stakeholders, underscoring the necessity for adaptable regulatory frameworks and robust policy guidelines to improve the sustainability and efficacy of future water-related PPPs.
The interest in using project management office (PMO) services in organizations to manage their construction projects is growing in light of rising economic, technological, and social developments based on their ability to achieve organizational goals while avoiding risks. Accordingly, organizations use PMO services to manage their technical and financial project issues to periodically evaluate PMO performance and services in a scientific, practical, and measurable way to ensure successful project path via PMO. Therefore, this research aims to develop a performance evaluation system that enables organizations to follow up and evaluate the PMO performance to ensure that PMO manages the organizations’ expectations and goals successfully according to certain quality, scope, and cost. The study builds on significant findings in PMO competence indexes as evaluation matrix, which includes five basic categories with 136 indexes covering the project life cycle. The matrix was developed based on literature analysis and supplemented with experts’ interviews in construction management. The developed robust competency-based index (RCI) for directive PMO supports the organizations to conduct client satisfaction, correction, or partial/total change of the PMO’s competence flow within five construction project life cycle and process, i.e. governance, portfolio, information, execution, and contract issues.
Most airport development projects entail disputes due to the features that are distinctive and complicated. Disputes can be minimized through creative problem-solving by implementing knowledge management practices into the system. This study investigates the direct influence of knowledge management (KM) on dispute minimization (DM) along with the key factors for developing a strategy that can enhance KM success. A mixed method was adopted including statistical data analysis based on the PLS-SEM and descriptive analysis with the SECI (Socialization, Externalization, Combination, Internalization) model approach for strategy development. These findings show that KM has a positive and significant direct influence on DM, while the factors that are considered to have a significant influence on KM success are human resources management (HR) and learning & training (LT) on airport development projects in state-owned airport companies. This research supports the importance of a well-developed HR system accompanied by regular LT to all members of the organization to optimize and encourage the spread of knowledge in the organization.
This study sought an innovative quality management framework for Chinese Prefabricated Buildings (PB) projects. The framework combines TQM, QSP, Reconstruction Engineering, Six Sigma (6Σ), Quality Cost Management, and Quality Diagnosis Theories. A quantitative assessment of a representative sample of Chinese PB projects and advanced statistical analysis using Structural Equation Modeling supported the framework, indicating an excellent model fit (CFI = 0.92, TLI = 0.90, RMSEA = 0.06). The study significantly advances quality management and industrialized building techniques, but it also emphasizes the necessity for ongoing research, innovation, and information exchange to address the changing problems and opportunities in this dynamic area. In addition, this study’s findings and recommendations can help construction stakeholders improve quality performance, reduce construction workload and cost, minimize defects, boost customer satisfaction, boost productivity and efficiency in PB projects, and boost the Chinese construction industry’s growth and competitiveness.
Infrastructure decision-making has traditionally been focused on the use of cost-benefit analysis (CBA) and multicriteria decision analysis (MCDA). Nevertheless, there remains no consensus in the infrastructure sector regarding a favored approach that comprehensively integrates resilience principles with those tools. This review focuses on how resilience has been evaluated in infrastructure projects. Initially, 400 papers were sourced from Web of Science and Scopus. After a preliminary review, 103 papers were selected, and ultimately, the focus was narrowed down to 56 papers. The primary aim was to uncover limitations in both CBA and MCDA, exploring various strategies for amalgamating them and enhancing their potential to foster resilience, sustainability, and other infrastructure performance aspects. Results were classified based on different rationalities: i) objectivist, ii) conformist, iii) adjustive, and iv) reflexive. The analysis revealed that while both CBA and MCDA contribute to decision-making, their perceived strengths and weaknesses differ depending on the chosen rationality. Nonetheless, embracing a broader perspective, fostering participatory methods, and potentially integrating both approaches seem to offer more promising avenues for assessing the resilience of infrastructures. The goal of this research proposal is to devise an integrated approach for evaluating the long-term sustainability and resilience of infrastructure projects and constructed assets.
Copyright © by EnPress Publisher. All rights reserved.