Increasing levels of everyday cycling has many benefits for both individuals and for cities. Reduced traffic congestion, improved air quality and safer spaces for all vulnerable road users are among the significant benefits for urban developments. Despite this, public opposition to cycling infrastructure is common, particularly when it involves reprioritising road space for cycles instead of vehicles. The purpose of the research was to examine various stakeholders’ perspectives on proposed cycle infrastructure projects. This study utilised an innovative data collection approach through detailed content analysis of 322 public consultation submissions on a proposed active travel scheme in Limerick City, Ireland. By categorising submissions into support, opposition, and proposals, the study reveals the nuanced public perceptions that influence behavioural adaptation and acceptance of sustainable transport infrastructure. Supportive submissions, which outnumbered opposition-related submissions by approximately 2:1, emphasised the need for dedicated cycling infrastructure, enhanced cyclist safety, and potential improvements in environmental conditions. In contrast, opposition submissions focused on concerns over car parking removal, decreased accessibility for residents, and safety issues for vulnerable populations, particularly the elderly. Proposal submissions suggested design modifications, including enhanced safety features, provisions for convenient car parking, and alternative cycle routes. This paper highlights the value of structured public consultation data in uncovering behavioural determinants and barriers to cycling infrastructure adoption, offering policymakers essential insights into managing public opposition and fostering support. The methodology demonstrates how qualitative data from consultations can be effectively used to inform policy by capturing community-specific needs and enhancing the design of sustainable urban mobility systems. These findings underscore the need for innovative, inclusive data collection methods that reveal public sentiment, facilitating evidence-based transport policies that support climate-neutral mobility.
The research is focused on the evolution of the enterprises, in the field of specialized professional services, medium-period, enterprises that implemented projects financed within Regional Operational Program (ROP) during the 2007–2013 financial programming period. The analysis of the economic performance of the micro-enterprises corresponds to general objectives, but there can be outlined connections between these performances and other economic indicators that were not considered or followed through the financing program. The study case is focused on the development of micro-enterprises in the services area, in the Central Region, Romania (one of the eight development regions in Romania). The scientific approach for this article was based on a regressive statistical analysis. The analysis included the economic parameters for the enterprises selected, comparing the economic efficiency of these enterprises, during implementation with the economic efficiency after the implementation of the projects, during medium periods, including the sustainability period. The purpose of the research was to analyse the economic efficiency of the selected micro-enterprises, after finalizing the projects’ implementation. The authors intend to point out the need for a managerial instrument based on the economic efficiency of companies that are benefiting from non-reimbursable funds. This instrument should be taken into consideration in planning regional development at the national level, regarding the conditions and results expected. Although the authors used regressive statistical analysis the purpose was to prove that there is a need for additional managerial instruments when the financial allocations are being designed at the regional level. This study follows the interest of the authors in proving that the efficiency of non-reimbursable funds should be analysed distinctively on the activity sectors.
The interest in using project management office (PMO) services in organizations to manage their construction projects is growing in light of rising economic, technological, and social developments based on their ability to achieve organizational goals while avoiding risks. Accordingly, organizations use PMO services to manage their technical and financial project issues to periodically evaluate PMO performance and services in a scientific, practical, and measurable way to ensure successful project path via PMO. Therefore, this research aims to develop a performance evaluation system that enables organizations to follow up and evaluate the PMO performance to ensure that PMO manages the organizations’ expectations and goals successfully according to certain quality, scope, and cost. The study builds on significant findings in PMO competence indexes as evaluation matrix, which includes five basic categories with 136 indexes covering the project life cycle. The matrix was developed based on literature analysis and supplemented with experts’ interviews in construction management. The developed robust competency-based index (RCI) for directive PMO supports the organizations to conduct client satisfaction, correction, or partial/total change of the PMO’s competence flow within five construction project life cycle and process, i.e. governance, portfolio, information, execution, and contract issues.
Most airport development projects entail disputes due to the features that are distinctive and complicated. Disputes can be minimized through creative problem-solving by implementing knowledge management practices into the system. This study investigates the direct influence of knowledge management (KM) on dispute minimization (DM) along with the key factors for developing a strategy that can enhance KM success. A mixed method was adopted including statistical data analysis based on the PLS-SEM and descriptive analysis with the SECI (Socialization, Externalization, Combination, Internalization) model approach for strategy development. These findings show that KM has a positive and significant direct influence on DM, while the factors that are considered to have a significant influence on KM success are human resources management (HR) and learning & training (LT) on airport development projects in state-owned airport companies. This research supports the importance of a well-developed HR system accompanied by regular LT to all members of the organization to optimize and encourage the spread of knowledge in the organization.
This study aims to develop a robust prioritization model for municipal projects in the Holy Metropolitan Municipality (Makkah) to address the challenges of aligning short-term and long-term objectives. The research explores How multi-criteria decision-making (MCDM) techniques can prioritize municipal projects effectively while ensuring alignment with strategic goals and local needs. The methodology employs the analytic hierarchy process (AHP) and exploratory factor analysis (EFA) to ensure methodological rigor and data adequacy. Data were collected from key stakeholders, including municipal planners and community representatives, to enhance transparency and reliability. The model’s validity was assessed through latent factor analysis, confirming the relevance of identified criteria and factors. Results indicate that flood prevention projects are the highest priority (0.4246), followed by road projects (0.3532), park construction (0.1026), utility projects (0.0776), and digital transformation (0.0416). The study highlights that certain factors are critical for evaluating and prioritizing municipal projects. “Capacity and Demand” emerged as the most influential factor (0.5643), followed by “Strategic Alignment” (0.2013), “Project Interdependence” (0.1088), “Increasing Investment” (0.0950), and “Risk” (0.0306). These findings are significant as they offer a structured, data-driven approach to decision-making aligned with Saudi Vision 2030. The proposed model optimizes resource allocation and project selection, representing a pioneering effort to develop the first prioritization framework specifically tailored to Makkah’s unique municipal needs. Notably, this is the first study to establish a prioritization method specifically for Makkah’s municipal projects, providing valuable contributions to the field.
Copyright © by EnPress Publisher. All rights reserved.