Leaf litter decomposition and carbon release patterns in five homegarden tree species of Kumaun Himalaya viz. Ficus palmata, Ficus auriculata, Ficus hispida, Grewia optiva and Celtis austalaris were investigated. The study was carried out for 210 days by using litter bag technique. In the current investigation, the duration needed for desertion of the original biomass of diverse leaf litter varied from 150 to 210 days and specifies a varying pattern of decomposition and carbon release among the species. Grewia optiva took the longest time to decompose (210 days) while Ficus hispida decomposed more quickly than rest of the species (150 days). The relative decomposition rate (RDR) was reported highest in Ficus hispida (0.009-0.02 g-1d-1) and lowest in Grewia optiva (0.008-0.004 g-1d-1). Carbon (%) in remaining litter was in the order: Ficus auriculata (24.4 %) >Ficus hispida (24.3%) > Celtis austaralis (19.8%) > Ficus palmata (19.7%) > Grewia optiva (19%). The relationship between percentage weight loss and time elapsed showed the significant negative correlation with carbon release pattern in all the species. Releasing nutrients into the soil through the decomposition of homegarden tree residuals is a crucial ecological function that also regulates the nutrient recycling in homegarden agroforestry practices.
Due to the short cost-effective heat transportation distance, the existing geothermal heating technologies cannot be used to develop deep hydrothermal-type geothermal fields situated far away from urban areas. To solve the problem, a new multi-energy source coupling a low-temperature sustainable central heating system with a multifunctional relay energy station is put forward. As for the proposed central heating system, a compression heat pump integrated with a heat exchanger in the heating substation and a gas-fired water/lithium bromide single-effect absorption heat pump in the multifunctional relay energy station are used to lower the return temperature of the primary network step by step. The proposed central heating system is analyzed using thermodynamics and economics, and matching relationships between the design temperature of the return water and the main line length of the primary network are discussed. The studied results indicate that, as for the proposed central heating system, the cost-effective main line length of the primary network can approach 33.8 km, and the optimal design return temperature of the primary network is 23 ℃. Besides, the annual coefficient of performance and annual energy efficiency of the proposed central heating system are about 3.01 and 42.7%, respectively.
Our intention in assembling this special issue of the Journal of Infrastructure, Policy and Development is to offer a state-of-the-art tour through the political economy issues associated with the provision of public infrastructure, and with the use of Public-Private Partnerships (PPPs) in particular. Anyone who is familiar with PPPs cannot fail to be impressed by the diversity of positions and claims regarding their properties. Some scholars maintain that PPPs are an efficient tool to enhance productivity due to their ability to manage demand-side risk. In contrast, other scholars see in PPPs a scheme whereby the public assumes the risk while the private partner takes the profit.
Copyright © by EnPress Publisher. All rights reserved.