Despite the existence of a voluminous body of literature covering the impact of infrastructure public-private partnerships (PPPs) on public value within the context of Western countries, scant attention has been paid to this topic in the Middle East. Given that the region has hosted numerous PPP projects that were implemented even without the rudimentary legal and regulatory frameworks considered essential for such projects to succeed, a study of PPPs within that region would thus be particularly useful, since an unpacking of the success factors for PPPs in the Middle East can reveal important practical insights that will advance the knowledge of PPP success factors overall. This paper, therefore, explores the rehabilitation and expansion of Jordan’s Queen Alia International Airport via the PPP route. It finds that the factors contributing to the project’s successful implementation can be categorized into those on the macro level related to political support, and the micro level factors concerned with management of daily activities involved in the partnership between the public and private sectors.
In this study, the enrichment of the major oxide, trace element/heavy metal and rare earth element contents of the rocks outcropping in Kısacık and its vicinity (Ayvacık-Çanakkale/Türkiye) were investigated. The rocks in the field were handled in 5 groups, and whole rock analyses were carried out for 22 samples collected representing these rock groups and Element Enrichment Factor (EEF) of the major oxide, trace element/heavy metal and rare earth element contents of the rocks were calculated. As a result, it was determined that the Kısacık volcanics were enriched in SiO2, Fe2O3, K2O, Be, Co, Cs, Th, U, W, La, Eu, Tm, Yb, Lu, Mo, As, Cd, Sb, Bi and Hg elements at a rate of >1 to >150 according to the upper crust values, and the Fe2O3, MgO, CaO, TiO2, P2O5, MnO, Cr, Sc, Co, Nb, Sr, Mo, Cu, Ni, Cad, Sb, Bi, V, Cu and Cd concentrations of the Ophiolitic Mélange were enriched in ratios ranging from >1 to >36 according to the upper crust values. It has been also observed that the listvenitic rocks in the Ophiolitic Mélange are enriched in Cr, Co, Ni, As and Hg elements compared to the upper crust. As to Kazdağ Group, MgO, CaO, K2O, MnO, Cr, Co, Ta, U, W, Mo, Cu, Ni, As and Cd were enriched. Listvenite were enriched in SiO2, Fe2O3, MgO, Mn, Cr, Co, Ni, As, Sb and Hg at a rate of >1 to >32 according to the upper crust values. When the rocks in the area were evaluated together, some oxides (e.g., CaO, MgO, Fe2O3, TiO2) and elements (e.g., Cr, Ni, Co) were enriched due to parental rock, while some oxides (e.g., SiO2, K2O and MnO) and elements (As, Sb, Hg) were enriched due to epigenic processes such as hydrothermal alteration and weathering.
Ecological environment damage events will destroy or damage the balance between animal and plant habitats and ecosystems, and even pose a threat to China’s ecological security. However, at present, there are some problems in the identification and evaluation of forest ecosystem damage, such as imperfect evaluation system, insufficient quantitative evaluation methods, imperfect damage compensation management system, and lack of analysis of the overall damage of the interaction between human activities and forest ecosystem. Based on the damaged object, the system involves a total of four first-class indicators, including physical damage, mental damage, economic forest fruit loss, forest by-products loss, processing and manufacturing loss, forest tourism loss, scientific research literature and history loss, soil conservation loss, water conservation loss, wind prevention and sand fixation loss, carbon fixation and oxygen release loss, atmospheric purification loss. There are 14 secondary indicators of emergency treatment fee and investigation and evaluation fee, as well as 22 tertiary indicators, and the value quantification method of each indicator is clarified by using market value method, alternative cost method, shadow engineering method, recovery cost method and other methods. The article also discusses the management system of forest ecosystem damage from the two aspects of forestry technology department and judicial administration department. The purpose is to provide reference for the quantification and standardization of forest ecosystem damage assessment technology and the improvement of management system.
The national park with Chinese characteristics is the highest level of protection of a kind of natural protection, its establishment marks the park will implement the strictest ecological protection means. It is of great value to construct the utilization system of national park resources under the new natural protected area system in the new era to avoid the misunderstanding of “ecological protection only” and explore how to carry out the sustainable utilization of resources in the reform of national park system and mechanism. According to the analytic hierarchy process (AHP) and Delphi method, the evaluation framework, indicators, reference standards and weights of resource utilization under the national park system were determined in combination with the requirements of constructing the protected natural area system and the total value of resource ecosystem services (including harvest value, existence value and future value). Based on the application research of Bawangling zone of Hainan Tropical Rainforest National Park, the optimal resource utilization system in the future was proposed, and two optimization strategies of ecological adjustment of resource utilization system and construction of suitable resource utilization system were put forward.
Through the combination of the geographic information systems (GIS) and the integrated information model, the stability of regional bank slope was comprehensively evaluated. First, a regional bank slope stability evaluation index system was established through studying seven selected factors (slope grade, slope direction, mountain shadow, elevation, stratigraphic lithology, geological structure and river action) that have an impact on the stability of the slope. Then, each factor was rasterized by GIS. According to the integrated information model, the evaluation index distribution map based on rasterized factors was obtained to evaluate the stability of the regional bank slope. Through the analysis of an actual project, it was concluded that the geological structure and stratigraphic lithology have a significant impact on the evaluation results. Most of the research areas were in the relatively low stable areas. The low and the relatively low stable areas accounted for 15.2% and 51.5% of the total study area respectively. The accuracy of slope evaluation results in the study area reached 95.41%.
Copyright © by EnPress Publisher. All rights reserved.