While there has been much discussion about the large infrastructure needs in Asia and the Pacific, less attention has been paid to public expenditure efficiency in infrastructure services delivery. New constructions are not the only solution, especially when governments have limited capital to invest. Globally, new infrastructure projects face delays and cost overruns, leading to an inefficient use of public resources. The root causes include the lack of transparency in project selection, the lack of project preparation, the silo approach by public entities in assessing feasibility studies, and the lack of public sector capacity to fully develop a bankable pipeline of projects. To tackle these issues, governments need a smarter investment approach and to do so, enhancing public service efficiency is very crucial. The paper suggests a “whole life cycle” (WLC) approach as the main strategic solution for the discussed issues and challenges. We expand the definition of WLC to include the entire life cycle of the infrastructure asset from need identification to its disposal. The stages comprise planning, preparation, procurement, design, construction, operation and maintenance, and disposal. This is because we believe any efficient or inefficient decision throughout such a wide life cycle influences the quality of public services. Hence, in this holistic approach, infrastructure life cycle consists of four phases: planning, preparation, procurement, and implementation. Governments could enhance public efficiency and thus improve access to finance throughout the WLC by several solutions. These are (i) preparing infrastructure master plan and pipelines and long-term budgeting during the planning phase; (ii) establishing framework and guidelines and improving governance during preparation phase; (iii) promoting standardization, transparency, open government, and contractual consistency during the procurement phase; and finally (iv) continued role of government and total asset management during the implementation phase. In addition to these phase-specific means, key WLC solutions include proper use of technology, capacity building, and private participation in general and public-private partnership (PPP) in particular.
For this, the primary aim of this study was to analyze of the impact of cultural accessibility and ICT (information and communication technology) infrastructure on economic growth in Kazakhstan, employing regression models to asses a single country data from 2008 to 2022. The research focuses on two sets of variables: cultural development variables (e.g., number of theaters, museums, and others) and ICT infrastructure variables (e.g., number of fixed Internet subscribers, total costs of ICT, and others). Principal component analysis (PCA) as employed to reduce the dimensionality of the data and identify the most significant predictors for the regression models. The findings indicate that in the cultural development model (Model 1), the number of recreational parks and students are significant positive predictors of GDP per capita. In the ICT infrastructure model (Model 2), ICT costs are found to have a significant positive impact on GDP per capita. Conversely, traditional connectivity indicators, such as the number of fixed telephone lines, show a low dependence on economic growth, suggesting diminishing returns on investment in these outdated forms of ICT. These results suggest that investments in cultural and ICT infrastructure are crucial for economic development. The study provides valuable insights for policymakers, emphasizing the need for quality improvements in education and strategic modernization of communication technologies.
Flood risk analysis is the instrument by which floodplain and stormwater utility managers create strategic adaptation plans to reduce the likelihood of flood damages in their communities, but there is a need to develop a screening tool to analyze watersheds and identify areas that should be targeted and prioritized for mitigation measures. The authors developed a screening tool that combines readily available data on topography, groundwater, surface water, tidal information for coastal communities, soils, land use, and precipitation data. Using the outputs of the screening tool for various design storms, a means to identify and prioritize improvements to be funded with scarce capital funds was developed, which combines the likelihood of flooding from the screening tool with a consequence of flooding assessment based on land use and parcel size. This framework appears to be viable across cities that may be inundated with water due to sea-level rise, rainfall, runoff upstream, and other natural events. The framework was applied to two communities using the 1-day 100-year storm event: one in southeast Broward County with an existing capital plan and one inland community with no capital plan.
Although infrastructure is widely recognized as a key ingredient in a country’s economic success, many issues surrounding infrastructurespending are not well understood. This paper explores six themes: the returns to infrastructure; the role of the private sector; the evaluation and delivery of infrastructure in practice; the nature of network industries, pricing and regulation; political economy considerations of infrastructure provision; and infrastructure in developing countries. This paper aims to provide insights into many of these questions, drawing on the existing literature.
Copyright © by EnPress Publisher. All rights reserved.