Adamtey, S. A. (2019). A Case Study Performance Analysis of Design-Build and Integrated Project Delivery Methods. International Journal of Construction Education and Research, 17(1), 68–84.
https://doi.org/10.1080/15578771.2019.1696903
Ajayi, S. O. (2016). Design, procurement and construction strategies for minimizing waste in construction projects [PhD thesis]. University of the West of England.
Ajayi, S. O., & Oyedele, L. O. (2018). Waste-efficient materials procurement for construction projects: A structural equation modelling of critical success factors. Waste Management, 75, 60–69.
https://doi.org/10.1016/j.wasman.2018.01.025
Al Fath, A. A., Herwindiaty, D. E., Wibowo, M. A., et al. (2024). Readiness for Implemented Sustainable Procurement in Indonesian Government Construction Project. Buildings, 14(5), 1424.
https://doi.org/10.3390/buildings14051424
Asmar, M. El, Hanna, A. S., Loh, W.-Y. (2013). Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems. Journal of Construction Engineering and Management, 139(11).
https://doi.org/doi:10.1061/(asce)co.1943-7862.0000744
Atkinson, R. (1999). Project Management: Cost, time, and quality, two best guesses and phenomenon, its time to accept other success criteria. International Journal of Project Management, 17(6), 337-342.
Bigwanto, A., Widayati, N., Wibowo, M. A., et al. (2024). Lean Construction: A Sustainability Operation for Government Projects. Sustainability, 16(8), 3386.
https://doi.org/10.3390/su16083386
Caplice, C., & Sheffi, Y. (1995). A Review and Evaluation of Logistics Performance Measurement Systems. The International Journal of Logistics Management, 6(1), 61–74.
https://doi.org/10.1108/09574099510805279
Chai, J., Liu, J. N. K., & Ngai, E. W. T. (2013). Application of decision-making techniques in supplier selection: A systematic review of literature. Expert Systems with Applications, 40(10), 3872–3885.
https://doi.org/10.1016/j.eswa.2012.12.040
Chan, A. P. C., Ho, D. C. K., & Tam, C. M. (2001). Design And Build Project Success Factors: Multivariate Analysis. American Society of Civil Engineers.
Chan, A. P. C., Scott, D., & Lam, E. W. M. (2002). Framework of Success Criteria for DesignÕBuild Projects. Management Engineering, 18(3), 120-128.
Chan, A. P. C., Yung, E. H. K., Lam, P. T. I., et al. (2001). Application of Delphi method in selection of procurement systems for construction projects. Construction Management and Economics, 19(7), 699–718.
https://doi.org/10.1080/01446190110066128
Falessi, D., Cantone, G., & Becker, M. (2006). Documenting design decision rationale to improve individual and team design decision making. In: Proceedings of the 2006 ACM/IEEE International Symposium on Empirical Software Engineering.
https://doi.org/10.1145/1159733.1159755
Kadefors, A., Björlingson, E., & Karlsson, A. (2007). Procuring service innovations: Contractor selection for partnering projects. International Journal of Project Management, 25(4), 375–385.
https://doi.org/10.1016/j.ijproman.2007.01.003
Katar, I. M. (2019). Enhancing the project delivery quality; lean construction concepts of design-build & design-bid-build methods. International Journal of management, 10(6).
https://doi.org/10.34218/ijm.10.6.2019.031
Lam, E. W. M., Chan, A. P. C., & Chan, D. W. M. (2004). Benchmarking design‐build procurement systems in construction. Benchmarking: An International Journal, 11(3), 287–302.
https://doi.org/10.1108/14635770410538763
Lauren, P. (2005). Lean Eliminating the Waste Construction. Construction Executive, 34-37.
Laurent, J., Leicht, R. M., & Asce, M. (2019). Practices for Designing Cross-Functional Teams for Integrated Project Delivery. Journal of Construction Engineering and Management, 145(3).
Leicht, R., & Harty, C. (2017). Influence of Multiparty IPD Contracts on Construction Innovation. In: Proceedings of the ARCOM 2017; 4-6 September 2017; Cambridge. pp. 164-173.
Liu, Y., Tang, W., Duffield, C. F., et al. (2021). Improving Design by Partnering in Engineering-Procurement-Construction (EPC) Hydropower Projects: A Case Study of a Large-Scale Hydropower Project in China. Water, 13(23), 3410.
https://doi.org/10.3390/w13233410
Mudzvokorwa, T., Mwiya, B. (2020). Improving the Contractor-subcontractor Relationship Through Partnering on Construction Projects in Zambia. Journal of Construction Engineering and Project Management, 10(1).
Ndekugrp, I., & Turner, A. (1994). Building procurement by design and build approach. Journal of Construction Engineering and Management, 120(2).
Pinto Nunez, M., Lopez Del Puerto, C., & Jeong, H. D. (2018). Development of a Partnering Maturity Assessment Tool for Transportation Agencies. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10(4), 04518021. doi:10.1061/(asce)la.1943-4170.0000272
Rached, F., Hraoui, Y., Karam, A., et al. (2014). Implementation of IPD in the Middle East and its Challenges. In: Proceedings of the International Group for Lean Construction, IGLC 22. Oslo, Norway.
https://doi.org/10.13140/RG.2.1.3348.6724/1
Rehman, M. A., & Ishak, Md. S. B. (2021). Moderating role of government Acts, laws and policies between team competency and skills and construction risk management among KSA contractors. International Journal of Construction Supply Chain Management, 11(2), 144–165.
https://doi.org/10.14424/ijcscm110221-144-165
Sari, E. M., Irawan, A. P., Wibowo, M. A., & Praja, A. K. A. (2021). Partnering tools to achieve lean construction goals. PalArch’s Journal of Archaeology of Egypt/Egyptology, 18(4).
Sari, E. M., Irawan, A. P., Wibowo, M. A., et al. (2022). Project Delivery Systems: The Partnering Concept in Integrated and Non-Integrated Construction Projects. Sustainability, 15(1), 86.
https://doi.org/10.3390/su15010086
Sari, E. M., Irawan, A. P., Wibowo, M. A., et al. (2023). Challenge and Awareness for Implemented Integrated Project Delivery (IPD) in Indonesian Projects. Buildings, 13(1), 262.
https://doi.org/10.3390/buildings13010262
Sari, E., Irawan, A., & Wibowo, M. (2022). Design Partnering Framework to Reduce Financial Risk in Construction Projects. In: Proceedings of the 1st International Conference on Contemporary Risk Studies; 31 March–1 April 2022; South Jakarta, DKI Jakarta, Indonesia.
https://doi.org/10.4108/eai.31-3-2022.2320722
Sarkis, J., Talluri, S. (2002). A model for strategic supplier selection. Journal of Supply Chain Management; Wheat Ridge, 38(1).
Shane, J. S., Asce, S., Gransberg, D. D., et al. (2015). Legal Challenge to a Best-Value Procurement System. Leadership and Management in Engineering, 6(1).
Soniya, S., Ramachandran, M., Sathiyaraj, C., et al. (2021). A Review on Multi-Criteria Decision-Making and Its Application. Journal on Emerging trends in Modelling and Manufacturing, 4, 7(4), 101–107.
https://doi.org/10.46632/7/4/1
Thohirin, A., Wibowo, M. A., Mohamad, D., et al. Tools and Techniques for Improving Maturity Partnering in Indonesian Construction Projects. Buildings 2024, 14, 1494.
https://doi.org/10.3390/buildings14061494
Tousignant, E., Fankhauser, O., & Hurd, S. (1999). Guidance manual for the design, construction and operations of constructed wetlands for rural applications in Ontario. Agricultural Adaptation Council.
Treloar, G. J., Gupta, H., Love, P. E. D., et al. (2003). An analysis of factors influencing waste minimisation and use of recycled materials for the construction of residential buildings. Management of Environmental Quality: An International Journal, 14(1), 134–145.
https://doi.org/10.1108/14777830310460432
Wibowo, M. A., Handayani, N. U., & Mustikasari, A. (2018). Factors for implementing green supply chain management in the construction industry. Journal of Industrial Engineering and Management, 11(4), 651.
https://doi.org/10.3926/jiem.2637
Yeung, J. F. Y., Chan, A. P. C., Chan, D. W. M., et al. (2013). Developing a Benchmarking Model for Construction Projects in Hong Kong. Journal of Construction Engineering and Management, 139(6), 705-716.
https://doi.org/10.1061/(asce)co.1943-7862.0000622
Yin, R. K. (2003). Case Study Research: Design and Methods. SAGE Publications, Inc.
Zimina, D., Ballard, G., & Pasquire, C. (2012). Target value design: using collaboration and a lean approach to reduce construction cost. Construction Management and Economics, 30(5), 383–398.
https://doi.org/10.1080/01446193.2012.676658