A. Kassem, M., Khoiry, M. A., & Hamzah, N. (2019). Risk factors in oil and gas construction projects in developing countries: a case study. International Journal of Energy Sector Management, 13(4), 846–861.
https://doi.org/10.1108/ijesm-11-2018-0002
Abdo, H., Flaus, J.-M., & Masse, F. (2017). Uncertainty quantification in risk assessment - Representation, propagation and treatment approaches: Application to atmospheric dispersion modeling. Journal of Loss Prevention in the Process Industries, 49, 551–571.
https://doi.org/10.1016/j.jlp.2017.05.015
Aven, T., Vinnem, J. E., & Wiencke, H. S. (2007). A decision framework for risk management, with application to the offshore oil and gas industry. Reliability Engineering & System Safety, 92(4), 433–448.
https://doi.org/10.1016/j.ress.2005.12.009
Basak, M., Coffey, V., & Perrons, R. K. (2021). The interaction between non-technical and technical risks in upstream natural gas project schedule overruns: Evidence from Australia. The Extractive Industries and Society, 8(4), 100971.
https://doi.org/10.1016/j.exis.2021.100971
Boateng, P., Chen, Z., & Ogunlana, S. O. (2015). An Analytical Network Process model for risks prioritisation in megaprojects. International Journal of Project Management, 33(8), 1795–1811.
https://doi.org/10.1016/j.ijproman.2015.08.007
Cheng, C., Wang, Z., Liu, M.-M., et al. (2018). Risk measurement of international oil and gas projects based on the Value at Risk method. Petroleum Science, 16(1), 199–216.
https://doi.org/10.1007/s12182-018-0279-1
Dehdasht, G., Mohamad Zin, R., Ferwati, M., et al. (2017). DEMATEL-ANP Risk Assessment in Oil and Gas Construction Projects. Sustainability, 9(8), 1420.
https://doi.org/10.3390/su9081420
Erol, H., Dikmen, I., Atasoy, G., et al. (2022). An analytic network process model for risk quantification of mega construction projects. Expert Systems with Applications, 191, 116215.
https://doi.org/10.1016/j.eswa.2021.116215
Fan, M., Lin, N.-P., & Sheu, C. (2008). Choosing a project risk-handling strategy: An analytical model. International Journal of Production Economics, 112(2), 700–713.
https://doi.org/10.1016/j.ijpe.2007.06.006
Guan, Z., Sheng, Y. N., Xi, C. M., et al. (2018). Oil and gas drilling risk analysis utilizing quantitative risk assessment. Journal of Applied Science and Engineering, 21(4), 541-546.
https://doi.org/10.6180/jase.201812_21(4).0005
Hermawan, D., Isvara, W., & Ichsan, M. (2024). Critical Risk Factors Associated with Schedule Delays in Gas Processing Facility Projects: Case Study in Indonesia. Global business finance review, 29(6), 60–73.
https://doi.org/10.17549/gbfr.2024.29.6.60
Jang, W., Han, S. H., & Park, H. (2015). A stage-gate integrated risk control system for LNG plant projects: Focusing on the design phase. Journal of Natural Gas Science and Engineering, 22, 437–446.
https://doi.org/10.1016/j.jngse.2014.12.018
Kang, H.-W., & Kim, Y.-S. (2015). Analysis of the probabilistic cost variation ranges according to the effect of core quantitative risk factors for an overseas plant project: Focused on a Middle East gas plant project. KSCE Journal of Civil Engineering, 20(2), 509–518.
https://doi.org/10.1007/s12205-015-0497-7
Khadem, M. M. R. K., Piya, S., & Shamsuzzoha, A. (2017). Quantitative risk management in gas injection project: a case study from Oman oil and gas industry. Journal of Industrial Engineering International, 14(3), 637–654.
https://doi.org/10.1007/s40092-017-0237-3
Mandal, C. S., & Agarwal, Dr. M. (2023). A review on Quantitative Risk Assessments for Oil and Gas installations and changes in Risk Evaluation Techniques. Materials Today: Proceedings.
https://doi.org/10.1016/j.matpr.2023.07.059
Nabawy, M., & Khodeir, L. M. (2020). A systematic review of quantitative risk analysis in construction of mega projects. Ain Shams Engineering Journal, 11(4), 1403–1410.
https://doi.org/10.1016/j.asej.2020.02.006
Nasirzadeh, F., Khanzadi, M., & Rezaie, M. (2014). Dynamic modeling of the quantitative risk allocation in construction projects. International Journal of Project Management, 32(3), 442–451.
https://doi.org/10.1016/j.ijproman.2013.06.002
Rosdiana, H., Inayati, & Sidik, M. (2015). Indonesia Property Tax Policy on Oil and Gas Upstream Business Activities to Promote National Energy Security: Quo Vadis. Procedia Environmental Sciences, 28, 341–351.
https://doi.org/10.1016/j.proenv.2015.07.043
Shebl, M. G., Abdulaziz, A. M., Fouad, M. K., et al. (2023). Modelling and optimization for an operating giant gas plant in Egypt. Case Studies in Chemical and Environmental Engineering, 7, 100323.
https://doi.org/10.1016/j.cscee.2023.100323
Umeesh, S., Suppramaniam, K., & Ismail, S. (2020). Critical Construction Activities of the Oil and Gas Projects in Malaysia. Journal of Advanced Research Design Journal Homepage, 64, 14-22.
Van Thuyet, N., Ogunlana, S. O., & Dey, P. K. (2007). Risk management in oil and gas construction projects in Vietnam. International Journal of Energy Sector Management, 1(2), 175–194.
https://doi.org/10.1108/17506220710761582
Wang, L., Peng, J., & Wang, J. (2018). A multi-criteria decision-making framework for risk ranking of energy performance contracting project under picture fuzzy environment. Journal of Cleaner Production, 191, 105–118.
https://doi.org/10.1016/j.jclepro.2018.04.169