The paper examines the motivations, financing, expansion and challenges of the Belt and Road Initiative (BRI). The BRI was initially designed to address China’s overcapacity and promote economic growth in both China and in countries along the “Belt” and “Road” through infrastructure investment and industrial capacity cooperation. It took into account China’s strategic transition in its opening-up policy and foreign policy to pay more attention to the neighboring countries in Southeast Asia and Central and West Asia when facing greater strategic pressure from the United States in East Asia and the Pacific region. More themes have been added to the initiative’s original framework since its inception in 2013, including the vision of the BRI as China’s major solution to improve international economic cooperation and practice to build a “community of shared future for mankind”, and the idea of the Green Silk Road and the Digital Silk Road. Chinese state-owned enterprises and policy and commercial banks have dominated investment and financing for BRI projects, which explains the root of the problems and risks facing the initiative, such as unsustainable debt, non-transparency, corruption and low economic efficiency. Measures taken by China to tackle these problems, for example, mitigating the debt distress and improving debt sustainability, are unlikely to make a big difference anytime soon due to the tenacity of China’s long-held state-driven investment model.
The study evaluated the aseptic establishment of Monstera acuminata Koch and Monstera deliciosa Liebm (Araceae) from leaves and the induction of in vitro organogenesis of M. acuminata K. from stem discs of young shoots. For this purpose, different disinfection protocols were applied to mature leaves and young shoots, from which leaf explants of approximately 1 cm2 and stem discs of approximately 1 mm thickness were extracted. The explants were established in semi-solid media with different hormone treatments during the aseptic establishment stage and induction of organogenesis. Disinfection with 3% sodium hypochlorite (NaClO) for 20 min and 50% Murashige and Skoog[1] medium with plant tissue culture preservative (PPM) favored less oxidation in leaf explants of both species. All explants of M. deliciosa in both treatments grown in PPM-added medium and at different disinfection protocols survived, showed no contamination and more than 80% retained cellular activity up to 49 days of culture age. At 35 days of culture, with disinfection in Tween-20 + 20% ethanol + 2.5% NaClO, and seeding of explants in MS medium added with 1 mg/L of BAP, 0.5 mg/L of AIA and 0.1 mg/L of ANA, seven new shoots of stem discs were induced. Monstera deliciosa was more adaptable to in vitro conditions. Advances in aseptic establishment and induction of organogenesis in native Araceae for wicker production are the basis for ex situ conservation of local populations.
There are several factors that generate postharvest losses of Citrus sinensis, but none have been focused on the central jungle of the Junín region of Peru. The objective of this research was to evaluate postharvest losses of Citrus sinensis in the province of Satipo, Junín region of Peru, considering the stages of the production chain. The methodology was applied to descriptive and cross-sectional design. A sample of 10 orange trees, 3 transport intermediaries and 5 traders selected for compliance with minimum volume and quality requirements were used. The °Brix, pH and acidity characteristics of the fruit were determined. Subsequently, absolute and percentage losses were quantified through direct observation, surveys and interviews. The main postharvest losses of Citrus sinensis were 1.50% in harvesting and detaching, 1.75% in transport to the collection center, 2.23% in storage and transport by intermediaries, and 2.90% in storage and sale by retailers. The overall loss was 8.12% throughout the production chain and US$5.75 per MT of C. sinensis harvested. The main damages found were mechanical and biological, caused by poor harvesting and packaging techniques, precarious storage and careless transport of the merchandise.
LEED (Leadership in Energy and Environmental Design) is a certification program for quantitatively assessing the qualifications of homes, non-residential buildings, or neighborhoods in terms of sustainability. LEED is supported by the U.S. Green Building Council (USGBC), a nonprofit membership-based organization. Worldwide, thousands of projects received one of the four levels of LEED certification. One of the five rating systems (or specialties) covered by LEED is the Building Design and Construction (BD + C), representing non-residential buildings. This rating system is further divided into eight adaptations. The adaptation (New Construction and Major Renovation) or NC applies to newly constructed projects as well as those going through a major renovation. The NC adaptation has six major credit categories, in addition to three minor ones. The nine credit categories together have a total of 110 attainable points. The Energy and Atmosphere (EA) credit category is the dominant one in the NC adaptation, with 33 attainable points under it. This important credit category addresses the topics of commissioning, energy consumption records, energy efficiency, use of refrigerants, utilization of onsite or offsite renewable energy, and real-time electric load management. This study aims to highlight some differences in the EA credit category for LEED BD + C:NC rating system as it evolved from version 4 (LEED v4, 2013) to version 4.1 (LEED v4.1, 2019). For example, the updated version 4.1 includes a metric for greenhouse gas reduction. Also, the updated version 4.1 no longer permits hydrochlorofluorocarbon (HFC) refrigerants in new heating, ventilating, air-conditioning, and refrigeration systems (HVAC & R). In addition, the updated version 4.1 classifies renewable energy into three tiers, differentiating between onsite, new-asset offsite, and old-asset offsite types.
While there has been much discussion about the large infrastructure needs in Asia and the Pacific, less attention has been paid to public expenditure efficiency in infrastructure services delivery. New constructions are not the only solution, especially when governments have limited capital to invest. Globally, new infrastructure projects face delays and cost overruns, leading to an inefficient use of public resources. The root causes include the lack of transparency in project selection, the lack of project preparation, the silo approach by public entities in assessing feasibility studies, and the lack of public sector capacity to fully develop a bankable pipeline of projects. To tackle these issues, governments need a smarter investment approach and to do so, enhancing public service efficiency is very crucial. The paper suggests a “whole life cycle” (WLC) approach as the main strategic solution for the discussed issues and challenges. We expand the definition of WLC to include the entire life cycle of the infrastructure asset from need identification to its disposal. The stages comprise planning, preparation, procurement, design, construction, operation and maintenance, and disposal. This is because we believe any efficient or inefficient decision throughout such a wide life cycle influences the quality of public services. Hence, in this holistic approach, infrastructure life cycle consists of four phases: planning, preparation, procurement, and implementation. Governments could enhance public efficiency and thus improve access to finance throughout the WLC by several solutions. These are (i) preparing infrastructure master plan and pipelines and long-term budgeting during the planning phase; (ii) establishing framework and guidelines and improving governance during preparation phase; (iii) promoting standardization, transparency, open government, and contractual consistency during the procurement phase; and finally (iv) continued role of government and total asset management during the implementation phase. In addition to these phase-specific means, key WLC solutions include proper use of technology, capacity building, and private participation in general and public-private partnership (PPP) in particular.
A problem in post-harvest of avocado (Persea americana Mill.) is the heterogeneity in fruit ripening, due to differences in the time of fruit set and the inability to ripen on the tree, a situation that causes inconsistencies in quality and differences in the response to preservation and processing technologies. In postharvest, the application of ethylene gas in hermetic chambers has been used to advance ripening; however, the use of ethylene releasers in liquid form (ethephon) has been proposed as an alternative, mainly for the treatment of low volumes of fruit. The present work was carried out in the production zone of Salvador Escalante (Michoacán, Mexico) with the objective of evaluating the effect of the application of two concentrations of ethephon on the time and homogenization of fruit ripening of avocado cultivars (cv.) Hass and Méndez. Fruits with 23.4% (cv. Hass) and 24% (cv. Méndez) of dry matter were harvested; one group was immersed in a solution of ethephon 500 mg/L and the other in 1,000 mg/L, both for 5 minutes; the treated fruits plus a control were stored at 20 °C for 11 days. Changes in respiration, ethylene production, weight loss, firmness, epicarp and pulp color, total phenol, chlorophyll and total carotenoid concentrations were evaluated. The results showed that ethephon doses of 1,000 mg/L in cv. Hass and 500 mg/L in cv. Méndez presented a ripening process 2 days earlier than the control.
Copyright © by EnPress Publisher. All rights reserved.