COVID-19 has presented considerable challenges to fiscal budget allocations in developing countries, significantly affecting decisions regarding number of investments in the transport sector where precise resource allocation is required. Elucidating the long-term relationship between public transport investment and economic growth might enable policymaker to effectively make a decision in regard to those budget allocation. Our paper then utilizes Thailand as a case study to analyze the effects on economic growth in a developing country context. The study employs Cointegration and Vector Error Correction Model (VECM) techniques to account for long-term correlations among explanatory variables during 1991–2019. The statistical findings reveal a significantly positive correlation between transport investment and economic growth by indicating an increase of 0.937 in economic growth for every one-percent increment in transport investment (S.D. = 0.024, p < 0.05). This emphasizes the potential of expanding the transport investment to recover Thailand’s economy. Furthermore, in terms of short-term adjustments, our results indicate that transport investment can significantly mitigate the negative impact of external shocks by 0.98 percent (p < 0.05). These findings assist policymakers in better managing national budget allocations in the post-Covid-19 period, allowing them to estimate the duration of crowding-out effects induced by shocks more effectively.
In regard to national development (ND), this review article (which is basically a perspective approach) presents retroactive and forward-looking perspectives on university education in Nigeria. In the past, particularly during the 1970s, the Nigerian university (NU) sector was among the most outstanding in Africa as well as globally. The best institutions drew students from around Africa, who flocked to Nigeria to study. The NU structure evidently contained four essential components for an international and effective university system, viz., world-class instructors, world-class students, a conducive learning environment, and global competitiveness. The NU structure, nevertheless, has undergone some neglect over the past thirty years and lost its distinctive identity, which raises questions about its function and applicability at the current stage of ND. Hence, some retrospective and forward-looking observations on university education in Nigeria in connection to ND are conveyed in this perspective article uses basically published articles and other relevant literature, as well as other sources and data from available literature. Hitherto, there is an urgent need for reinforcement of the university system in order to give it the desired and comparable international quality and functionality needed to meet the demands of current issues and the near future. However, this article conveys an intense belief and conviction that the NU system is still important for both the political and socioeconomic development (growth) of the nation. The article concludes by recommending the way forward in this regard.
This research examines three data mining approaches employing cost management datasets from 391 Thai contractor companies to investigate the predictive modeling of construction project failure with nine parameters. Artificial neural networks, naive bayes, and decision trees with attribute selection are some of the algorithms that were explored. In comparison to artificial neural network’s (91.33%) and naive bays’ (70.01%) accuracy rates, the decision trees with attribute selection demonstrated greater classification efficiency, registering an accuracy of 98.14%. Finally, the nine parameters include: 1) planning according to the current situation; 2) the company’s cost management strategy; 3) control and coordination from employees at different levels of the organization to survive on the basis of various uncertainties; 4) the importance of labor management factors; 5) the general status of the company, which has a significant effect on the project success; 6) the cost of procurement of the field office location; 7) the operational constraints and long-term safe work procedures; 8) the implementation of the construction system system piece by piece, using prefabricated parts; 9) dealing with the COVID-19 crisis, which is crucial for preventing project failure. The results show how advanced data mining approaches can improve cost estimation and prevent project failure, as well as how computational methods can enhance sustainability in the building industry. Although the results are encouraging, they also highlight issues including data asymmetry and the potential for overfitting in the decision tree model, necessitating careful consideration.
Scholars widely agree that modular technologies can significantly improve environmental sustainability compared to traditional building methods. There has been considerable debate about the viability of replacing traditional cast-in-place structures with modular construction projects. The primary purpose of this study is to determine the feasibility of using modular technology for construction projects in island areas. Thus, it is necessary to investigate the potential problems and suitable solutions associated with modular building project implementation. This study is accomplished through the use of qualitative and quantitative methods. It systematically examines desk research based on the wide academic literature and real case studies, collating secondary data from government files, news articles, professional blogs, and interviews. This research identifies several important barriers to the use of modular construction projects. Among the issues are the complexity of stakeholder engagement, limited practical skills and construction methodologies, and a scarcity of manufacturing capacity specialised for modular components. Fortunately, these unresolved challenges can be mitigated through fiscal incentives and governmental regulations, induction training programmes, efficient management strategies, and adaptive governance approaches. As a result, the findings support the feasibility of starting and advancing modular building initiatives in island areas. Project developers will likely be more willing to embrace and commit resources to initiate modular building projects. Additional studies can be undertaken to acquire the most recent first-hand data for detailed validation.
Copyright © by EnPress Publisher. All rights reserved.