The danger of riverbed processes is considered. Their speed varies from the first few months of the flood to the most dynamic process in nature. It happened in front of people. This may make life on the river bank and the utilization of river resources more difficult. This paper introduces the causes and consequences of the danger performance of riverbed processes, and focuses on the mapping methods of the danger assessment of riverbed processes: determining the danger degree of riverbed processes and different methods of displaying it on the map. An example of displaying danger on the previously drawn map is given, and the distribution of different types and expression degrees of dangerous riverbed processes under various natural conditions in Russia is briefly analyzed.
This paper analyzed the equitable allocation of infrastructure across regional states in Ethiopia. In general, in the past years, there has been a good start in the infrastructure sector in Ethiopia. However, the governance and equity system of infrastructure in Ethiopia is not flexible, not technology-oriented, not fair, and not easily solved. The results of in-depth interviews and focus group discussions (FGDs) showed that there is a lack of institutional capacity, infrastructure governance, and equity, which has negatively impacted the state- and nation-building processes in Ethiopia. According to the interviewees, so long as the unmet demand for infrastructure exists, it remains a key restrain on doing business in most Ethiopian regional states. This is due to the lack of integrated frameworks, as there are coordination failures (lack of proper government intervention, including a lack of proper understanding and implementation of the constitution and the federal system). In Ethiopia, to reduce these bottlenecks arising from the lack of institutional capacity, infrastructure governance, and equity and their effects on nation-building, first of all, the government has to critically hear the people, deeply assess the problems, and come to the point and then discuss the problems and the way forward with the society at large.
The influence of mining activity on the environment on the environment belongs to the most negative industrial influences. Mine subsidence on the surface can be a result of many deep underground mining activities. The present study offers the theory to the specific case of the deformation vectors solution in a case of disruption of the data homogeneity of the geodetic network structure in the monitoring station during periodical measurements in mine subsidence. The theory was developed for the mine subsidence at the abandoned magnesite mine of Košice-Bankov near the city of Košice in East Slovakia. The outputs from the deformation survey were implemented into geographical information system (GIS) applications to a process of gradual reclamation of whole mining landscape in the magnesite mine vicinity. After completion of the mining operations and liquidation of the mine company, it was necessary to determine the exact edges of the mine subsidence of Košice-Bankov with the zones of residual ground motion in order to implement a comprehensive reclamation of the devastated mining landscape. Requirement of knowledge about stability of the former mine subsidence was necessary for starting the reclamation work. Outputs from the present specific solutions of the deformation vectors confirmed the multi-year stability of the mine subsidence in the area of interest. Some numerical and graphical results from the deformation vectors survey in the abandoned magnesite mine of Košice-Bankov are presented. The obtained results were transformed into GIS for the needs of the municipality of Košice City to the implementation of the reclamation activities in the mining territory of Košice-Bankov.
Copyright © by EnPress Publisher. All rights reserved.