This study employed the theory of planned behavior to examine how green urban spaces influence walking behaviors, with a focus on Chongqing’s Jiefangbei Pedestrian Street. Using structural equation modelling to analyse survey data from 401 respondents, this study assessed the relationships between attitudes, subjective norms, perceived behavioral control, walking intentions, and actions. The results revealed that attitudes toward walking (β = 0.335, p < 0.001) and subjective norms (β = 0.221, p < 0.001) significantly predict walking intentions, which strongly determine actual walking behavior (β = 0.379, p < 0.001). Moreover, perceived behavioral control exerts a direct significant impact on walking actions (β = 0.332, p < 0.001), illustrating that both environmental and social factors are crucial in promoting pedestrian activity. These findings suggest that enhancing the appeal and accessibility of urban green spaces can significantly encourage walking, providing valuable insights for urban planning and public health policy. This study can guide city planners and health professionals in creating more walkable and health-conducive urban environments.
Surveys are one of the most important tasks to be executed to get valued information. One of the main problems is how the data about many different persons can be processed to give good information about their environment. Modelling environments through Artificial Neural Networks (ANNs) is highly common because ANN’s are excellent to model predictable environments using a set of data. ANN’s are good in dealing with sets of data with some noise, but they are fundamentally surjective mathematical functions, and they aren’t able to give different results for the same input. So, if an ANN is trained using data where samples with the same input configuration has different outputs, which can be the case of survey data, it can be a major problem for the success of modelling the environment. The environment used to demonstrate the study is a strategic environment that is used to predict the impact of the applied strategies to an organization financial result, but the conclusions are not limited to this type of environment. Therefore, is necessary to adjust, eliminate invalid and inconsistent data. This permits one to maximize the probability of success and precision in modeling the desired environment. This study demonstrates, describes and evaluates each step of a process to prepare data for use, to improve the performance and precision of the ANNs used to obtain the model. This is, to improve the model quality. As a result of the studied process, it is possible to see a significant improvement both in the possibility of building a model as in its accuracy.
The construction of gas plants often experiences delays caused by various factors, which can lead to significant financial and operational losses. This research aims to develop an accurate risk model to improve the schedule performance of gas plant projects. The model uses Quantitative Risk Analysis (QRA) and Monte Carlo simulation methods to identify and measure the risks that most significantly impact project schedule performance. A comprehensive literature review was conducted to identify the risk variables that may cause delays. The risk model, pre-simulation modeling, result analysis, and expert validation were all developed using a Focused Group Discussion (FGD). Primavera Risk Analysis (PRA) software was used to perform Monte Carlo simulations. The simulation output provides information on probability distribution, histograms, descriptive statistics, sensitivity analysis, and graphical results that aid in better understanding and decision-making regarding project risks. The research results show that the simulated project completion timeline after mitigation suggested an acceleration of 61–65 days compared to the findings of the baseline simulation. This demonstrates that activity-based mitigation has a major influence on improving schedule performance. This research makes a significant contribution to addressing project delay issues by introducing an innovative and effective risk model. The model empowers project teams to proactively identify, measure, and mitigate risks, thereby improving project schedule performance and delivering more successful projects.
The study documents the model of the knowledge transfer process between the University, the Vocational Training Center and the industrial actors. The research seeks to answer to the following questions. Where is new knowledge generated? Where does knowledge originate from? Is there a central actor? If so, which organization? Hypotheses tested by the research: H1: Knowledge starts from the higher education institution. H2: Most “new knowledge” is generated in universities and large multinational companies. H3: The university is a central actor in the knowledge flow, transmitting both hard and soft skills, as well as subject (‘know-what’), organizational (‘know-why’), use (‘know-how’), relational (‘know-who’), and creative (‘care-why’) knowledge. The aim of the research is to model the way of knowledge flow between the collaborating institutions. The novelty of this research is that it extends the analysis of the knowledge flow process not only to the actors of previous researches (higher education institutions, business organizations, and government) but also to secondary vocational education and training institutions. The methodology used in the research is the analysis of the documents of the actors investigated and the questionnaire survey among the participants. Knowledge transfer is the responsibility of the university and its partner training and business organizations. In vocational education and training, knowledge flows based on the knowledge economy, innovation and technological development are planned, managed and operational. The research has shown that knowledge is a specific good that it is indivisible in its production and consumption, that it is easy and cheap to transfer and learn.
Political representation is responsible for choices regarding the supply and the management of transport infrastructure, but its decisions are sometimes in conflict with the will and the general interest expressed by citizens. This situation has progressively prompted the use of specific corrective measures in order to obtain socially sustainable decisions, such as the deliberative procedures for the appraisal of public goods. The standard Stated Choice Modelling Technique (SCMT) can be used to estimate the community appreciation for public goods such as transport infrastructure; but the application of the SCMT in its standard form would be inadequate to provide an estimation that expresses the general interest of the affected community. Hence the need to adapt the standard SCMT on the basis of the operational conditions imposed by deliberative appraisal procedures. Therefore, the general aim of the paper is to outline the basic conditions on which a modified SCMT with deliberative procedure can be set up. Firstly, the elements of the standard SCMT on which to make the necessary adjustments are identified; subsequently, modifications and additions to make to the standard technique are indicated; finally, the contents of an extensive program of experimentation are outlined.
The goal of this work was to create and assess machine-learning models for estimating the risk of budget overruns in developed projects. Finding the best model for risk forecasting required evaluating the performance of several models. Using a dataset of 177 projects took into account variables like environmental risks employee skill level safety incidents and project complexity. In our experiments, we analyzed the application of different machine learning models to analyze the risk for the management decision policies of developed organizations. The performance of the chosen model Neural Network (MLP) was improved after applying the tuning process which increased the Test R2 from −0.37686 before tuning to 0.195637 after tuning. The Support Vector Machine (SVM), Ridge Regression, Lasso Regression, and Random Forest (Tuned) models did not improve, as seen when Test R2 is compared to the experiments. No changes in Test R2’s were observed on GBM and XGBoost, which retained same Test R2 across different tuning attempts. Stacking Regressor was used only during the hyperparameter tuning phase and brought a Test R2 of 0. 022219.Decision Tree was again the worst model among all throughout the experiments, with no signs of improvement in its Test R2; it was −1.4669 for Decision Tree in all experiments arranged on the basis of Gender. These results indicate that although, models such as the Neural Network (MLP) sees improvements due to hyperparameter tuning, there are minimal improvements for most models. This works does highlight some of the weaknesses in specific types of models, as well as identifies areas where additional work can be expected to deliver incremental benefits to the structured applied process of risk assessment in organizational policies.
Copyright © by EnPress Publisher. All rights reserved.