Catastrophes, like earthquakes, bring sudden and severe damage, causing fatalities, injuries, and property loss. This often triggers a rapid increase in insurance claims. These claims can encompass various types, such as life insurance claims for deaths, health insurance claims for injuries, and general insurance claims for property damage. For insurers offering multiple types of coverage, this surge in claims can pose a risk of financial losses or bankruptcy. One option for insurers is to transfer some of these risks to reinsurance companies. Reinsurance companies will assess the potential losses due to a catastrophe event, then issue catastrophe reinsurance contracts to insurance companies. This study aims to construct a valuation model for catastrophe reinsurance contracts that can cover claim losses arising from two types of insurance products. Valuation in this study is done using the Fundamental Theorem of Asset Pricing, which is the expected present value of the number of claims that occur during the reinsurance coverage period. The number of catastrophe events during the reinsurance coverage period is assumed to follow a Poisson process. Each impact of a catastrophe event, such as the number of fatalities and injuries that cause claims, is represented as random variables, and modeled using Peaks Over Threshold (POT). This study uses Clayton, Gumbel, and Frank copulas to describe various dependence characteristics between random variables. The parameters of the POT model and copula are estimated using Inference Functions for Margins method. After estimating the model parameters, Monte Carlo simulations are performed to obtain numerical solutions for the expected value of catastrophe reinsurance based on the Fundamental Theorem of Asset Pricing. The expected reinsurance value based on Monte Carlo simulations using Indonesian earthquake data from 1979–2021 is Rp 10,296,819,838.
This study aims to identify the risk factors causing the delay in the completion schedule and to determine an optimization strategy for more accurate completion schedule prediction. A validated questionnaire has been used to calculate a risk rating using the analytical hierarchy process (AHP) method, and a Monte Carlo simulation on @RISK 8.2 software was employed to obtain a more accurate prediction of project completion schedules. The study revealed that the dominant risk factors causing project delays are coordination with stakeholders and changes in the scope of work/design review. In addition, the project completion date was determined with a confidence level of 95%. All data used in this study were obtained directly from the case study of the Double-Double Track Development Project (Package A). The key result of this study is the optimization of a risk-based schedule forecast with a 95% confidence level, applicable directly to the scheduling of the Double-Double Track Development Project (Package A). This paper demonstrates the application of Monte Carlo Simulation using @RISK 8.2 software as a project management tool for predicting risk-based-project completion schedules.
This paper presents a coupling of the Monte Carlo method with computational fluid dynamics (CFD) to analyze the flow channel design of an irradiated target through numerical simulations. A novel series flow channel configuration is proposed, which effectively facilitates the removal of heat generated by high-power irradiation from the target without necessitating an increase in the cooling water flow rate. The research assesses the performance of both parallel and serial cooling channels within the target, revealing that, when subjected to equivalent cooling water flow rates, the maximum temperature observed in the target employing the serial channel configuration is lower. This reduction in temperature is ascribed to the accelerated flow of cooling water within the serial channel, which subsequently elevates both the Reynolds number and the Nusselt number, leading to enhanced heat transfer efficiency. Furthermore, the maximum temperature is observed to occur further downstream, thereby circumventing areas of peak heat generation. This phenomenon arises because the cooling water traverses the target plates with the highest internal heat generation at a lower temperature when the flow channels are arranged in series, optimizing the cooling effect on these targets. However, it is crucial to note that the pressure loss associated with the serial structure is two orders of magnitude greater than that of the parallel structure, necessitating increased pump power and imposing stricter requirements on the target container and cooling water pipeline. These findings can serve as a reference for the design of the cooling channels in the target station system, particularly in light of the anticipated increase in beam power during the second phase of the China Spallation Neutron Source (CSNS Ⅱ).
The construction of gas plants often experiences delays caused by various factors, which can lead to significant financial and operational losses. This research aims to develop an accurate risk model to improve the schedule performance of gas plant projects. The model uses Quantitative Risk Analysis (QRA) and Monte Carlo simulation methods to identify and measure the risks that most significantly impact project schedule performance. A comprehensive literature review was conducted to identify the risk variables that may cause delays. The risk model, pre-simulation modeling, result analysis, and expert validation were all developed using a Focused Group Discussion (FGD). Primavera Risk Analysis (PRA) software was used to perform Monte Carlo simulations. The simulation output provides information on probability distribution, histograms, descriptive statistics, sensitivity analysis, and graphical results that aid in better understanding and decision-making regarding project risks. The research results show that the simulated project completion timeline after mitigation suggested an acceleration of 61–65 days compared to the findings of the baseline simulation. This demonstrates that activity-based mitigation has a major influence on improving schedule performance. This research makes a significant contribution to addressing project delay issues by introducing an innovative and effective risk model. The model empowers project teams to proactively identify, measure, and mitigate risks, thereby improving project schedule performance and delivering more successful projects.
Copyright © by EnPress Publisher. All rights reserved.